During Construction Clause Samples

POPULAR SAMPLE Copied 2 times
During Construction. Upon request of the Owner the Contractor shall submit written proposals for unit prices to be applied in the event Change Order Work is authorized by the Owner to be performed under Case (b).
During Construction. At all times, the Contractor shall keep the premises free from accumulations of waste material or rubbish caused by his employees, Trade Contractors, or work. Periodically during the course of the Work he shall remove all his rubbish from and about the building and all his tools, scaffolding, and surplus materials and shall leave his work "broom-clean" or its equivalent, unless more exactly specified. Prior to Final Completion by a Trade Contractor of any Trade Contract, Contractor shall require the Trade Contractor to remove from the Work and Site all temporary systems, tools, equipment, machinery, and surplus materials not required for the continued performance of any Work under the Trade Contract or this Contract. In case of dispute, after 48 hours written notice the Owner may remove the rubbish and charge the cost to the Contractor.
During Construction. At all times, the CM/GC shall keep the premises free from accumulations of waste material or rubbish caused by his employees, Trade Contractors, or work. Periodically during the course of the Work he shall remove all his rubbish from and about the building and all his tools, scaffolding, and surplus materials and shall leave his work "broom-clean" or its equivalent, unless more exactly specified. Prior to Final Completion by a Trade Contractor of any Trade Contract, CM/GC shall require the Trade Contractor to remove from the Work and Site all temporary systems, tools, equipment, machinery, and surplus materials not required for the continued performance of any Work under the Trade Contract or this Contract. In case of dispute, after 48 hours written notice the Owner may remove the rubbish and charge the cost to the CM/GC.
During Construction. Upon request of the Owner the CM/GC shall submit written proposals for unit prices to be applied in the event Change Order Work is authorized by the Owner to be performed under Case (b).
During Construction. During the process of construction of the Project, Developer shall obtain policies of builder's risk completed value non-reporting form of fire and extended coverage, vandalism and malicious mischief hazard insurance naming the Village as an additional insured and covering the Project in at least the amount of the estimated cost of replacement of the Project, with provision that such coverage will not be terminated without 30 days prior written notice to the Village.
During Construction. The Concessionaire shall:
During Construction. Unless otherwise determined under Section 1.2(b), for all Investments under construction (and prior to deemed completion and in-service) begun after the Lease Effective Date, the Applicable Cost of Debt (in %) shall be equal to the actual interest rate paid by Lessor to finance the cost of constructing such Investments.
During Construction. At all times, the Contractor shall keep the premises free from accumulations of waste material or rubbish caused by his employees, Trade Contractors, or work. Periodically during the course of the Work he shall remove all his rubbish from and about the building and all his tools, scaffolding, and surplus materials and shall leave his work "broom-clean" or its equivalent, unless more exactly specified. Prior to Final Completion by a Trade Contractor of any Trade Contract, Contractor shall require the Trade Contractor to remove from the Work and Site all temporary systems, tools, equipment, machinery, and surplus materials not required for the continued performance of any Work under the Trade Contract or this Contract. In case of dispute, after 48 hours written notice the Owner may remove the rubbish and charge the cost to the Contractor. Prior to Material Completion. Prior to the inspection for Material Completion of the Project Contractor shall remove from the Site all wastes and rubbish, clean all tile and glass surfaces, replace broken glass, remove stains, paint spots, and clean and polish all plumbing fixtures and equipment, leave the Work “vacuum clean” or its substantial equivalent, all hard surface floors swept and mopped, all carpeted floors vacuumed, all surfaces other than floors dusted, blower dusted, or wiped (depending on type of surface) and surface blemishes cleaned, all glazing washed [both sides], and all electrical and mechanical equipment and fixtures cleaned, with all ductwork cleaned and filters replaced, if such are dirty, before other cleaning is started, and re-cleaned if any dust or dirt has gotten into the ductwork during the cleaning process. The Contractor shall restore existing facilities such as roads, other paved surfaces, fencing, curbing and the like at the Site to at least their preconstruction conditions; provided, however, the Contractor may, in an orderly fashion, leave such equipment and supplies at the Site as necessary to achieve Final Completion of the Project. This cleaning must be completed before the Contractor can expect the Design Professional to commence the inspection for Material Completion. To achieve Material Completion, the Contractor shall have fully cleaned the Site – all debris must have been removed from the site and all paved surfaces must have been broom swept and thoroughly hosed down. ACTS OF EXECUTIVE ORDERS: The Contractor, by signing the contract, acknowledges that he is aware of and familiar w...
During Construction. 6.24.1.1 The DB shall maintain in good order at a secure location on the Site: .1 a complete copy of all Contract Documents; Shop Drawings, Product Data, Samples and similar required submittals; manufacturer operating and maintenance instructions; certificates; warranties; RFIs and responses thereto; and other Project-related documents, all marked currently and accurately to record field changes and selections made during construction and to show actual installation where installation varies from Work as originally shown, including the exact location and depth of underground utility lines; and .2 a set of Drawings and Specifications, approved in accordance with Section 5.8.1.1, and the records required by Section 6.2.14. 6.24.1.2 Before submitting each DB Payment Request, the DB shall record all changes on the Contract Documents, neatly in a contrasting color, noting new information not shown on the original Contract Documents. Failure to record all changes may cause payment to be withheld or delayed by the Contracting Authority. 6.24.1.3 The DB shall keep a record of changes made to the Specifications, noting particularly any approved variation from manufacturer’s installation instructions and recommendations. 6.24.1.4 If the DB uses Shop Drawings to indicate as-built conditions, the DB shall cross-reference the Shop Drawing sheet numbers to the corresponding sheet numbers on the Contract Documents. The DB shall note related numbers where applicable. 6.24.1.5 The DB shall at all times permit access to the documents described in this Section 6.24.1 to authorized representatives of the State, local authorities having jurisdiction, Contracting Authority, Owner, and Criteria A/E.
During Construction a. Tenant Contractor’s work area (including storage) will be restricted to the Premises. No construction will be permitted in the enclosed Mall. Contractors must use the Premises as a staging area for all construction, with the exception of storefront and signs. No storage or office trailers will be allowed on the site without Landlord’s written permission. b. Certain instances may require Tenant’s Contractor and Landlord to enter other tenants’ premises to perform necessary underslab work, construction extending through levels above, etc. Arrangements for permission to enter other tenants’ premises must be made through Landlord. Such work must be performed at times when such other tenant’s operation will not be affected. All costs associated with said work, including security personnel, are ▇▇▇▇▇▇’s expense. c. Landlord’s structural elements other than floor slab may not be used for support of any Tenant construction or equipment including storefront grilles. d. All materials used for Tenant’s Work will be maintained at all times within the Premises. Under no circumstances will any portion of the enclosed Mall area be used to store Tenant’s or Tenant’s Contractor’s material, equipment or trash. Landlord reserves the right to clear the enclosed Mall area of any dirt or debris due to Tenant’s construction and back charge to Tenant without prior written notice. e. Tenant and ▇▇▇▇▇▇’s Contractor shall protect their work from damage and shall protect the work of other tenants from damage by ▇▇▇▇▇▇, Tenant’s Contractor and their employees and subcontractors. Landlord shall not be held responsible for damage done by other tenants or their contractors. f. Mall floors, neutral strips and Landlord’s bulkhead must be protected from damage by ▇▇▇▇▇▇’s construction. Any damage resulting from ▇▇▇▇▇▇’s construction will be rectified by Landlord at ▇▇▇▇▇▇’s expense. g. Any electricity needed to work in the Premises shall come from Tenant’s wiring within the Premises, not from Common Area outlets. h. Tenant’s HVAC equipment must utilize existing utility shafts for outside air intake and toilet room exhaust. Coordinate all work with ▇▇▇▇▇▇▇▇’s Representative. i. Elevators may be used as necessary for material deliveries, but must be scheduled for use through Landlord. j. Tenant shall pay for temporary electricity consumed during the construction of the Premises as metered by the existing meter. If the meter is removed or does not exist, the temporary electrical rate $0.25/...