During Construction definition

During Construction. The provisions of this mitigation measure shall be complied with at all times.
During Construction. The provisions of this mitigation measure shall be complied with at all times. PERFORMANCE STANDARDS (Standards for Success): Construction contracts and bid documents reflect specified requirements; field checks indicate compliance with the requirement. MONITORING RECORD: Actions/ Date Signature of Monitor :% of Completion Accomplishment, MITIGATION MONITORING FORM CULT-1 ISSUE: Unanticipated Discovery IMPACT(S); Discovery of and impacts to unanticipated cultural resource material within the work area. MITIGATION MEASURE CULT-1 During any excavation or other substantial subsurface disturbance activities, individuals conducting the work should be advised to watch for cultural resource materials. Should any evidence of prehistoric cultural resources be observed. (freshwater shells, beads, bone tool remnants or an assortment of bones, soil changes including subsurface ash lens or soil darker in color than the surrounding soil, lithic materials such as flakes, tools or grinding rocks, etc.), or historical cultural resources (adobe foundations or walls, structures and remains with square nails, refuse deposits or bottle dumps, often associated with xxxxx or old privies); all work should immediately cease, and the California
During Construction. The provisions of this mitigation measure shall be complied with at all times. PERFORMANCE STANDARDS (Standards for Success): Construction contracts and bid documents reflect specified requirements; field checks indicate compliance with the requirement. .

Examples of During Construction in a sentence

  • Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered.

  • Description of Required Infection Control Precautions by Class During Construction ProjectUpon Completion of Project Class I1.

  • Artifacts Found During Construction: Contractor shall immediately notify the Owner’s Representative when artifacts are uncovered or found during the demolition or construction process.

  • All Non-Road Mobile Machinery (NRMM) of net power of 37kW and up to and including 560kW used during the course of the demolition, site preparation and construction phases shall comply with the emission standards set out in chapter 7 of the GLA's supplementary planning guidance "Control of Dust and Emissions During Construction and Demolition" dated July 2014 (SPG), or subsequent guidance.

  • The discount rate to be used for present value calculations shall be the Company’s Allowance for Funds Used During Construction (“AFUDC”) rate adjusted to a net of tax basis.

  • Excludes recognition of Allowance for Borrowed Funds Used During Construction.

  • All discoveries shall be processed and documented using the existing procedures detailed in Sections III - During Construction, and IV – Discovery of Human Remains.

  • During Construction, coordinate use of site and facilities through the Construction Administrator.

  • If the PI determines that a potentially significant discovery has been made, the procedures detailed under Section III - During Construction and IV-Discovery of Human Remains shall be followed.

  • Maintenance of Right-of-Way During Construction: The CONTRACTOR shall keep all travel lanes, ditches, gutters, medians and drop inlets clean of debris and maintained during construction until final acceptance.


More Definitions of During Construction

During Construction. Provisions of this mitigation measure shall be complied with at all times. LEAD AGENCY: Colusa County IMPLEMENTED BY: Developer MONITORED BY: Colusa County COMPLIANCE VERIFICATION: Colusa County. FUNDED BY: Developer or Successors in Real Property MONITORING FREQUENCY: . Before Construction: Check bid documents to ensure contractor's understanding of requirements. PERFORMANCE STANDARDS (Standards for Success): Construction contracts and bid. documents reflect specified requirements; field checks indicate compliance with the requirement. MONITORING RECORD: :Date ' Signature of Monitor % of Completion Actions/ Accomplishment MITIGATION MONITORING FORM GEO-1 ISSUE: Bank Stabilization Requirements IMPACT(S): The project has the potential to increase erosion of the river bank. MITIGATION MEASURE GEO-1 Bank stabilization techniques consistent with the California Department of Fish and Game (CDFG) guidelines detailed in a completed Streambed Alteration Agreement shall be instituted throughout the duration of construction- and development activities.
During Construction. The provisions of this mitigation measure shall be complied with at all times. PERFORMANCE STANDARDS (Standards for Success): Construction contracts and bid documents reflect specified requirements; field checks indicate compliance with the requirement. . MONITORING RECORD: Date Signature of Monitor % of Completion Actions/ Accomplishment MITIGATION MONITORING FORM HAZ-1 ISSUE: Equipment and Fuel Storage IMPACT(S): The project his the potential to increase the risk of accidental fuel releases or spills.. MITIGATION MEASURE HAZ-1 Construction equipment and fuel storage shall be located within the parking lot of the of the project area northeast of Butte Slough Road. Fuel storage, including fuel trucks, shall occur only on impervious surfaces. : Plastic or mylar films or a functional equivalent may be used to create temporary impervious surfaces during construction. .

Related to During Construction

  • Cost of Construction means the total cost to Owner of those portions of the entire Project designed or specified by the Design Professional. Cost of Construction does not include the Design Professional's compensation and expenses and Owner's expenses associated with the Project or the cost of other services to be provided by others to the Owner.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Original construction ’ shall mean the first or initial construction

  • Commencement of Construction means the commencement of construction of foundation components or elements (such as footings, rafts or piles) for the home.

  • Completion of Construction means all the construction is complete except for minor weather-related components and conforms to the approved plans and specifications and change orders.

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • Begin actual construction means, in general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities, other than preparatory activities, which mark the initiation of the change.

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

  • Commence Construction means that an owner or operator has either undertaken a continuous program of construction or has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the project, and (ii) the cumulative payments made by the developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Means and Methods of Construction means the labor, materials, temporary structures, tools, plant, and construction equipment, and the manner and time of their use, necessary to accomplish the result intended by this Contract.

  • Land disturbing construction activity means any man-made alteration of the land surface resulting in a change in the topography or existing vegetative or non-vegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the state. Land disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities.

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Foreign construction material means a construction material other than a domestic construction material.

  • Construction activity means any clearing, grading or excavation associated with large construction activity or associated with small construction activity.

  • Acquisition and Construction Fund means the fund so designated in, and created pursuant to, Section 502 hereof.

  • Construction Works means all works and things necessary to complete the Project Facilities in accordance with this Agreement;

  • Construction Activities means the disturbance of soils associated with clearing, grading, excavation activities or other construction-related activities.

  • Construction and demolition debris means and includes: