PROPOSED FEE Sample Clauses

PROPOSED FEE. Professional fee for the Registration under ESIC & EPF Act of Rs. 2,000 for the same.  Any other out of pocket expenses needs to be reimbursed separately with prior approval.  Bill to be raised immediately after closure of month and payment to be settled within 7 days.  The following is an estimate and summary of the cost associated with applied accounting services offering for ESIC EPF Consultancy and Payroll services these numbers are an estimate only. X.XX NUMBER OF EMPLOYEES FEE/MONTHLY 1 01 to 20 1500 2 21 to 60 3000 3 After 60 50 / Per Employee Shri Ram Associates 12 PKT-17 SECTOR-22 ROHINI NEW DELHI-110086 Xxxxxxx Xxxxxxx
AutoNDA by SimpleDocs
PROPOSED FEE. Stantec will complete the scope described above on a time & materials basis as described below, which includes reimbursable expenses (mileage, travel, etc.). The final fees and expenses invoiced will be based on the level of effort required to complete the work. Regulatory agency wetland permit application fees, if applicable, will be the responsibility of the City. BASE COMPENSATION CONTRACT CATEGORY TASK TOTAL Design Task 1. Project Management and Planning $ 23,547.00 Task 2. Hydrologic & Hydraulic Modeling $ 43,326.00 Task 3.1. Detail Design (60%) $ 63,410.00 Task 3.2. Detail Design (90%) $ 51,086.00 Task 3.3. Detail Design (100%) $ 30,780.00 USACE Permitting Task 4. Nationwide Permitting $ 31,894.00 Soil and Foundation From Phase 1: Preliminary Geotech Report $ - Task 6.3. Soil Stability Analysis $ 33,000.00 Design Field Survey Task 6.1. Detailed Topographic Survey $ 19,459.00 SUBTOTAL $ 296,502.00 OTHER COMPENSATION CONTRACT CATEGORY TASK TOTAL Bid and Construction Services Task 5.1. As-Needed Bid Phase Services $ 13,183.00 Task 5.2. As-Needed Construction Phase Services $ 37,330.00 ROW/Easement Acquisition Task 6.2. Easements (Easements) $ 14,300.00 Additional Services Task 6.4. As-needed services $ 24,888.00 Misc. Expenses (Reimbursable) $ 6,100.00 SUBTOTAL $ 95,801.00 CONTRACT TOTAL TOTAL $ 392,303.00 590 Summary of Proposed Alignment -10814000 600 Title ATTACHMENT "B" To W Arbrook Rd 610 Sewer Pipe: 2,622 XX Xxxxxx Park: Alternative 1B (Gravity) Manholes: 11 2300 Client/Project F13SL0065 610 City of Arlington 224701101 XXXX Areas of Slope Stability: 4 Water Pipe: 741 LF EX-4 Xxxxxx Park Sanitary Sewer Xxxx Xxxxxxxxxx XXXX00000 600 000 Xxxxxxxx Xxxxxx X. 3925 0000 Xxxx Xxxxx Xx. #0 #0#0 #0#0 0000 X00XX0000 #0 3931 9 600 600 10 X00XX0000 EX-3 0000 X Xxxxxxxx Xxxxx Xx, Xxxxxxxxx, XX 00000 T. of Arlington, Tarrant Co., TX $ $ (¯ Prepared by RAW on 2019-10-31 TR by KB on 2019-11-01 IR Review by ABC on 2019-XX-XX F13SL0375 2411 3935 0# 3933 Area D 0 50 100 150 200 250 300 Feet (At original document size of 11x17) 1:3,000 3853000 580 1 2414 SHARED CLEAN-OUT 000 X. Xxxxx Rd. 4 6A 600 2415 610 Area C 4008 #0 #0 #0#0 #0 #0#0#0 600 #0 4003 4005 4009 6B 610 #0 8 600 #0 F13SL0083 F13SL0060 600 Xxxx Xxxxx Xxxxxxxxxx Xxxx Xxxxx Centerline: Offset by 75 FT 3853000 620 #0 Existing Service Connection Existing Water Line Proposed Water Line Existing Sanitary Sewer To be removed/abandoned (Line) Xxxxxxxx Xxxxxx X. X00XX0000 \\US1566-F01\shared_projects\224701101\6.0 ...
PROPOSED FEE. Stantec will complete the scope described above on a time & materials basis for an estimated Not to Exceed (NTE)fee of $ 400,000, which includes reimbursable expenses (mileage, travel, etc.). The final fees and expenses invoiced will be based on the level of effort required to complete the work. Regulatory agency wetland permit application fees, if applicable, will be the responsibility of the City. Due to the limited time available to prepare this scope of services, Stantec has not reached to subcontractors to request a hard quote on work to be performed. For that reason, budget re- allocation between top and lower level tasks may be necessary once the level of effort is assessed in more detail. At this time, we anticipate that no change to the NTE amount will be required. CONTRACT CATEGORY TASK TOTAL Design Task 1. Project Management and Planning $ 35,000.00 Task 2. Preliminary Design (60%) $ 65,000.00 Task 3. Final Design (90%) $ 45,000.00 Task 4. Final Construction Documents (100%) $ 25,000.00 Task 5. Hydrologic & Hydraulic Modeling $ 30,000.00 USACE Permitting Task 6. Nationwide Permitting $ 35,000.00 Soil and Foundation Task 7. Geotechnical Investigation $ 45,000.00 Design Field Survey Task 8. Detailed Topographic Survey $ 35,000.00 Construction Services Task 9. Bidding, Award, and Construction services $ 25,000.00 ROW/Easement Acquisition Xxxx 00. Easements $ 20,000.00 Additional Services Xxxx 00. As-needed services $ 35,000.00 Misc. Expenses (Reimbursable) $ 5,000.00 TOTAL $ 400,000.00 Measured point at top of deposition 24" headwall silted in, possibility abandoned XS2 Concrete and bag wall failure with observed rotation Observed seepage Multiple wall failures XS1 18" outfall w/ apron Power pole in eroding bank Concrete and gabion mattress grad control. Gabion mattress beginning to fail. sever sediment deposition within concrete channel. Observed City crews cleaning channel on 3/6/2019 36" outfall bank erosion on DS end of headwall 18" outfall mostly clogged Concrete grade control on US of Pleasant Ridge bridge with approximately 8" drop 0 50 100 200 Feet City of Arlington Hourly Rates Position Hourly Rate Principal in Charge $196.00 - $234.00 Senior Engineer / QA/QC $185.00 - $216.00 Project Manager $166.00 - $185.00 Technical Advisory $185.00 - $224.00 Geomorphologist $158.00 - $196.00 Environmental Scientist $158.00 - $196.00 Project Engineer $158.00 - $196.00 CADD Technician $117.00 - $175.00 Engineer in Training $117.00 - $147.00 Administrati...
PROPOSED FEE. Cost schedules for general services, additional services, and itemized reimbursable expenses if applicable; include an explanation of established fees.
PROPOSED FEE. Invoicing shall be conducted monthly upon full completion of each Service Item scope of work. Basic Service Item Item Description Proposed Fee 1 Meetings & Information Sharing $1,000 2 Existing Facility Condition Report $4,000 3 Space Programming $4,000 TOTAL FEE $9,000 Supplemental (Additional) Services -- Not a part of Base Contract A Site Investigations $1,500 B Conceptual Design Diagrams $2,500 C Schematic Design Drawings $7,500 D Exterior 3-D Design Visualization $3,500 E Cost Estimating $2,500 F1 Identify Needs (includes cost of accessing information databases) $36,000 F2 Operational Efficiency & Utilization Analysis $24,000 F3 Follow-on Analysis of Impact of Additional Resources $12,000 G1 Fire Station Location & Deployment Study $48,000 G2 Conduct 3- and 5-year Projection of Operations $16,000 G3 Conduct 10-year Projection of Operations $8,000 Hourly Rates: o Principal $260/hr o Senior Architect $220/hr o Architect Level III $180/hr o Architect Level II $150/hr o Architect Level I $120/hr o CAD Operator $80/hr o Clerical $60/hr We look forward to working with you toward a successful project. Please don’t hesitate to contact me with any questions or need for clarification of the above proposal. Sincerely, Xxxxxxx Xxxxxxxx, AIA Partner, Xxxxxxxx Architects 281-346-7371 (office)
PROPOSED FEE. For the organizational review and employee climate survey, the Institute of Government will provide the services outlined in this proposal including all personnel services, operating supplies, computer time, travel, etc., at cost not to exceed $36,000.
PROPOSED FEE. Xxxxx Xxxxxxx Associates, Inc. proposes to provide the scope of services outlined in this proposal for a fixed fee, including expenses, as follows: Task 1: Project Administration, Meetings and Coordination $ 1,388 Task 2: 65% Unchecked Design $ 8,072 Task 3: 95% Design $ 4,962 Task 4: 100% Design $ 2,674 Task 5: Bid Construction Documents $ 1,987 Reimbursable $ 200 Project Total $ 19,283 A detailed hourly fee breakdown and charge rate schedule can be found in the attached Exhibit B and Exhibit C, respectively. Client agrees to limit the liability of consultant, its principals and employees, to client and to all contractors and subcontractors on the project, for any claim or action arising in tort or contract, to the sum of $50,000 or consultant’s fee, whichever is greater. However, if consultant’s fee exceeds $250,000, liability to the client and to all contractors and subcontractors shall not exceed $250,000. City of Saratoga Pedestrian/Bicycle Railroad Crossing October 26, 2017 Should you have any questions, please do not hesitate to call. Sincerely, XXXXX XXXXXXX ASSOCIATES, INC. Xxxx Xx, PE Engineering Manager Attachments: Exhibit A – Concept Plan dated 4/11/2017 Exhibit B – Hourly Fee Breakdown Exhibit C – Charge Rate Schedule EXHIBIT B XXXXX XXXXXXX ASSOCIATES, INC. Hourly Fee Breakdown City of Saratoga Pedestrian/Bicycle Crossing, Saratoga, CA 26−Oct−17 Category: Rate: Principal $224.00 Project Admin $140.00 Engineer Manager $172.00 Senior Engineer $156.00 Project Engineer $140.00 Assistant Engineer $118.00 Senior Comp Drafter$127.00 Secretarial Services $92.00 Total Hours Estimate 1 Project Admin, Meetings and Coordination 1 4 4 9 $ 1,388 2 65% Unchecked Design 10 14 20 16 60 $ 8,072 3 95% Design 1 5 4 10 12 2 2 36 $ 4,962 4 100% Design 4 6 6 2 2 20 $ 2,674 5 Bid Construction Documents 4 5 4 1 14 $ 1,987 Reimbursable $ 200 Project Total 1 1 27 4 39 42 21 4 139 $ 19,283 10/26/2017 K:\lSL\PROPOSALS\Saratoga Bike Crossing (BKF_2017-08 Xxxxx)\Proposal 2017-10-26\Exhibit B- Saratoga Bike Crossing _Fee Estimate 2017-1026.xls Contractor: BKF Engineers Project name: Fredericksburg-Guava RR Crossing Improvements EXHIBIT C CHARGE RATE SCHEDULE Principal $224.00 - $288.00 Associate 200.00 Engineering Manager 172.00 Project Administrator 140.00 Senior Engineer 156.00 Project Engineer 140.00 Staff Engineer 128.00 Assistant Engineer 118.00 Junior Engineer 110.00 Senior Computer Drafter 127.00 Computer Drafter 110.00 Junior Computer Drafter 100.00 Secretarial Ser...
AutoNDA by SimpleDocs
PROPOSED FEE. We propose to perform the scope of services outlined herein for an estimated fee as described in the schedule attached to this proposal. Our services will be provided in accordance with the enclosed 2010 Schedule of Fees. If unanticipated field conditions are encountered that require a significant modification to our proposed scope of services and/or require an increase in the estimated fee, we will not proceed with the modified scope or increased amount without obtaining your authorization. It is mutually agreed between Nautilus Group and Geocon that all services afforded and work performed by Geocon are provided pursuant to Civil Code Section 2782. et. seq., and such agreement is expressly integrated into and made a part of any and all contracts or agreements entered into between the parties. Our proposed fee is valid for a period of 90 days from the date of this proposal. Our fee includes the submittal of two PDF copies of our report on CDs. Drafts or additional copies may be requested for an additional administrative fee. We have prepared this proposal with the understanding that this is not a prevailing wage project. If the Nautilus Group should conclude that this is a prevailing wage project, please so advise us in writing prior to commencement of proposed activities. If failure to so advise Geocon results in the imposition of fines, penalties, claims or damages against Geocon. Nautilus Group agrees to reimburse Geocon for all costs and expenses. We request that available site plans be provided to us prior to field work that will show the locations of all underground utility lines and structures as well as the location of any sensitive natural habitats and/or archaeological sites. We will not be responsible for damage to any such lines, structures, vegetation, or archaeological sites that are not shown accurately on plans provided to us.
PROPOSED FEE. For the work described above, we propose a Fixed Fee of $ 7,500.00.
PROPOSED FEE. For the work described above, we propose a Fixed Fee of $ 4,500.00.
Time is Money Join Law Insider Premium to draft better contracts faster.