Detail design Clause Samples

The 'Detail design' clause outlines the requirements and responsibilities for preparing comprehensive and precise design documents for a project. It typically specifies the standards, level of detail, and approval processes that the design must meet, such as providing technical drawings, specifications, and calculations for all relevant components. This clause ensures that all parties have a clear and agreed-upon reference for construction or implementation, reducing the risk of misunderstandings and errors during later project phases.
Detail design. Production engineering design is defined as all the Contractor’s detailed engineering and design activities that translate the requirements finalized in the system engineering phase into a fully operational continuous monitoring of dissolved oxygen.
Detail design. Stantec will develop detail design documents including a draft construction plan set, outline of technical specifications, itemized quantities, and an opinion of probable construction cost for the revised alignment and will involve a certified arborist to review plans for all of parks requirements in calling out trees to be protected/removed, size and type of tree and QA/QC review during the following submission preparation: • Task 3.1. Detail Design (60%) • Task 3.2. Detail Design (90%) • Task 3.3. Detail Design (100%)
Detail design. After the review and final definition of parameters the following additional information will be provided: • PID diagrams and line lists (PDF and CAD) • Instrument data sheets • Equipment specifications and updated equipment lists • Preliminary plot plan (based on your site) (PDF and CAD) • Preliminary Layout and elevation drawings (PDF and CAD) • Operating description including interlock and complex loop descriptions. • Quality control manual including lab procedures Cost : [...***...] (in addition to A1) Payment terms : Progress payments [...***...] with P.O [...***...] with delivery of PID’s [...***...] with delivery of Equipment specifications & Lists [...***...] with delivery of all other documentation Delivery : All design documentation 6 weeks ARO — we will release documentation earlier as it becomes available. If both A1 and A2 are ordered at the same time we can reduce the delivery time to 8 weeks ARO for both items, provided that no major changes are made in the initial review.
Detail design. 2 dimensions .3 information pertaining to fabrication processes .4 techniques of construction and installation. .5 coordination of the work of Subcontractors.
Detail design. The Contractor shall after contract award submit a detailed design and associated drawings containing the following but not limited to:  Design criteria/ parameters used;  Design Philosophy;  Materials used;  Energy efficiency and Fenestration calculations as per SANS 10400: XA  All assumptions made;  All software input and output files incl. design models; and  All references/ sources of information used.  Drawings indicating the detail of the forces exerted on the existing structures;  Detailed drawings indicating the modifications to existing structures;  An Assessment Review report by a professionally registered structural engineer/technologist proving that the integrity of the existing structure is not compromised by the installation of the new skylight panels or its supporting structure.  Details of the design measures to ensure compliance with SANS 10400 XA.  Details of the corrosion protection systems used.  Confirmation that the design of the works complies with the National Building regulations.  Submit an Operation and Maintenance Manual, where applicable;  Details of the design measures to prevent ingress of water into the building. The Employer’s governance procedures require the Employer to perform End-of-Phase design reviews. The Employer requires a period of three (3) weeks for the review of the Concept design and four (4) weeks for the review of the Detail Design.
Detail design. Cerulean will participate in a detailed design phase over a three (3) day period following contract award and issuance of Work Order #1. Cerulean will build the command driven communications interface between PCS and their server platform for Police operations and a second interface for Fire operations.