EROSION AND SEDIMENTATION CONTROL Sample Clauses

EROSION AND SEDIMENTATION CONTROL. 27.1 The Developer agrees to implement the approved erosion and sedimentation and control plans and lot grading and drainage plans to the satisfaction of the Town, Niagara Region, and Niagara Peninsula Conservation Authority.
AutoNDA by SimpleDocs
EROSION AND SEDIMENTATION CONTROL. (a) The subdivider shall prepare an erosion and sedimentation control plan addressing the installation and maintenance of soil erosion and sedimentation control measures. Such plans shall meet the requirements set forth in the Village Erosion Control Ordinance Section 7.21.
EROSION AND SEDIMENTATION CONTROL. 38. The Subdivider agrees, during and after construction, to monitor the erosion and sedimentation control facilities on a weekly basis, or forthwith following rainfall events of 13 millimetres or greater, and immediately rectify any deficiencies within 24 hours to the satisfaction of the City Engineer. Where overland drainage occurs to the open space areas, the Subdivider agrees that all of the erosion and sediment control works shall be inspected and maintained to ensure their structural integrity. The Subdivider shall provide the name and phone number of the Contractor for maintenance of the erosion and sedimentation control facilities. Where in the sole opinion of the City Engineer an emergency exists with respect to erosion and sedimentation control, the City may enter on the subdivision without notice and, at the expense of the Subdivider, do such work and provide such materials as are necessary to answer the emergency.
EROSION AND SEDIMENTATION CONTROL. Developer shall implement all erosion control measures detailed in the Storm Water Pollution Prevention Plan (“SWPPP”) and on the Grading and Drainage plan (including construction of all temporary and permanent ponds) in the order required by the Town Engineer. Developer shall also implement any additional erosion control measures required by the Town Engineer, and shall abide by all erosion control requirements contained in the Watab Subdivision ordinance and as required by the NPDES Construction Stormwater Permit for the project. The parties recognize that time is of the essence in controlling erosion. If the Developer does not comply with the erosion control plan and/or the requirements of the NPDES Construction Stormwater Permit, the Town may take such action as it deems appropriate to control erosion, and the landowner hereby grants the Town permission to enter upon the land and take such necessary erosion control actions. The Town will endeavor to notify the Developer in advance of any proposed action, but failure of the Town to do so will not affect the Developer's and Town's rights or obligations hereunder. If the Developer does not reimburse the Town for any cost the Town incurred for such work within thirty (30) days, the Town may draw down the letter of credit to pay any costs or may specially assess Developer’s land for the costs not covered by the letter of credit. No development will be allowed and no building permits will be issued unless the development is in full compliance with the erosion control requirements.
EROSION AND SEDIMENTATION CONTROL. Including but not limited to all necessary erosion and sedimentation control measures, as detailed in the contract documents, preparation of SWPPP, drainage overflow channel, and site grading. LS 1 $37,000.00 $37,000.00 8 Electrical and Instrumentation: Including but not limited to motor control center, instrumentation, SCADA, power system studies, start-up and testing, and all other electrical items to be installed at the Xxxxx site, as detailed in the contract documents. LS 1 $3,000,000.00 $3,000,000. 9 Well No. 5 Improvements: Including but not limited to pre-installation downhole 3 video surveys and inspection, the installation of one (1) 7,000 GPM vertical turbine well pump, motor, ductile iron pipe, valves, appurtenances, demolition of existing facilities, existing flow meter removal and re-installation, and electrical system improvements LS 1 $440,000.00 $440,000.0 10 Trench Safety: Includes trench safety per OSHA requirements LS 1 $3,000.00 $3,000.00 11 Chemical Improvements: Including but not limited to the construction of two (2) bulk chemical storage tanks and two (2) day tanks for 23% Hydrofluorosilicic acid and Liquid Ammonium Sulfate, modifications to the existing chlorine gas feed system, replacement of chemical feed piping, installation of chemical metering equipment, modifications to the existing LS 1 $450,000.00 $450,000.00 chemical injection sites, and a prefabricated fiberglass reinforced plastic building for chemical equipment storage 12 Paving Improvements: Including but not limited to repaving the site entrance, repaving the existing cart path with concrete, the addition of an all-weather flexbase access road, the addition of an asphalt access road. LS 1 $225,000.00 $225,000.0 13 2 GST Roof Rafter Rib Repair – Grinding and Welding: Includes all appurtenant work, as detailed in the contract documents. LF 680 $64.00 $43,520.00 14 GST Roof Rafter Rib Flange Repair with Plate Steel: Includes all appurtenant work, as detailed in the contract documents. LF 340 $64.00 $21,760.00 15 GST Roof Rafter Rib Web Repair with Plate Steel: Includes all appurtenant work, as detailed in the contract documents. LF 340 $64.00 $21,760.00 16 GST Roof Rafter Rib Replacement: Includes all appurtenant work, as detailed in the contract documents. LF 340 $109.00 $37,060.00 17 GST Floor Plate Replacement: Includes all appurtenant work, as detailed in the contract documents. SF 200 $130.00 $26,000.00 18 GST Base Plate Replacement: Includes all appurtenant work, a...
EROSION AND SEDIMENTATION CONTROL. The Developer shall construct, install and maintain erosion and sediment control facilities, prior to any grading or construction on the Lands, in accordance with a plan that has been submitted to and approved by the Township Engineer.
EROSION AND SEDIMENTATION CONTROL. The contractor shall protect streams, lakes and wetlands from sediment discharges caused by the contractor's activities. The contractor shall also provide (where applicable) an erosion and sedimentation control plan in compliance with state and local laws and regulations, to the COR for approval prior to executing any soil-disturbing activities. The contractor must submit a National Pollutant Discharge Elimination System Permit to the Pennsylvania Department of Environmental Protection (PADEP) prior to any construction activity that encompasses more than one acre. All permits must be reviewed and approved by the EB prior to being sent to any regulatory authority. The contractor shall not disturb any wetlands. Contractor will remove all silt fencing and other temporary control measures once the site is stabilized. Contractor will remove all spoils from TYAD unless a previously approved disposal site has been established. The contract COR will be responsible for management and control of the spoils disposal site.
AutoNDA by SimpleDocs
EROSION AND SEDIMENTATION CONTROL. .1 Provide control measures to prevent discharge of sediments or deleterious materials into the reservoir during construction activities according to requirements of authorities having jurisdiction.
EROSION AND SEDIMENTATION CONTROL. No grading, excavating, removing or destruction of topsoil, trees, or other vegetative cover of any kind, nor any changes in the contours of the Property shall be made until such time as a plan for minimizing soil erosion and sedimentation (hereinafter referred to as the “E&S Plan”) has been approved by the Township, and if applicable, the Delaware County Soil Conservation Service and the Pennsylvania Department of Environmental Protection. All appropriate soil erosion and sedimentation control measures applicable to the specific work being initiated by Developer shall be installed and implemented prior to commencing any other work on the Project. Grading and/or clearing of ground shall not proceed for any portions of the Property on which soil and erosion control has not been fully installed. Developer shall comply with the E&S Plan during the course of construction and shall use all care possible to prevent siltation and other pollution of the waters of the Commonwealth of Pennsylvania, even if measures exceeding those set forth on the E&S Plan, and/or the Plan must be employed, installed, and/or constructed. Developer further agrees to maintain control over dust or dirt blowing off the Property in accordance with the applicable rules, regulations, and procedures of the Township. Developer agrees to construct all drainage facilities, incidental drainage facilities, and grading improvements required by the Township Engineer or his authorized representative in accordance with the E&S Plan and/or the Plan. If at any time Developer fails to comply with the provisions of this paragraph, Township shall have the right to refuse to issue any further permits for the Project and to suspend or revoke any such permits previously issued, until such time as Developer has complied with the directions of the Township Engineer to correct any drainage problems or do any additional drainage work as required by the E&S Plan and/or Plan. All drainage facilities, incidental drainage facilities, and grading improvements required by the E&S Plan, and/or the Plan to be constructed by Developer on the Property shall be completed, inspected, and approved prior to the construction or erection of any structure that will create water runoff intended to be controlled by those facilities or grading improvements. The construction of such drainage facilities, incidental drainage facilities, and grading improvements shall be done simultaneously and in conjunction with construction of the ...
EROSION AND SEDIMENTATION CONTROL. Erosion and sedimenta- tion control plans showing those structures or methods of construction required to retard the rate of runoff water and those grading and excavating practices that will prevent erosion and sedimentation including the following:
Time is Money Join Law Insider Premium to draft better contracts faster.