Canal Excavation Sample Clauses

Canal Excavation. 15 Supply and installation of canal granular materials and riprap. .16 Reservoir riprap work. .17 Testing and Commissioning. .18 Demobilization.
AutoNDA by SimpleDocs
Canal Excavation. 1 Excavate canal to the lines, grades, and elevations specified in the Contract Documents, unless established otherwise by the Departmental Representative. .2 The Departmental Representative will identify unsuitable bearing soils when encountered at the specified level. Carry the excavation deeper to remove unsuitable bearing soils and replace excavated soil with materials as directed by the Departmental Representative. .3 The Departmental Representative will determine if suitable bearing conditions are found above the lines, grades, and elevations specified in the Contract Documents. Adjust excavation lines as directed by the Departmental Representative to accommodate the raised foundation. .4 Fill unauthorized over-excavation to the lines, grades, and elevations specified in the Contract Documents using materials as directed by the Departmental Representative at no cost to the Departmental Representative. .5 In cold weather, perform canal excavation, loading, hauling, dumping, wasting and spreading in a continuous operation to avoid freezing of the materials before the specified surface has been achieved. .6 Minimize the depth of frost penetration into the underlying materials in canal excavation areas by sequencing excavation and placement of granular materials and riprap to minimize the exposed areas, and by keeping equipment traffic to a minimum. .7 Load, haul and, spread excavated canal material in adjacent Waste Fill zones on the outside of the canal banks as directed by the Departmental Representative. Spread the waste fill in maximum loose lift thickness of 500 mm. Compact each lift to a minimum of 85% of Standard Xxxxxxx Maximum Dry Density. Grade the waste fill surface to provide a neat, uniform and free draining surface.

Related to Canal Excavation

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

  • PAVING Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase ▪ benchmarks, including TBM set with preliminary survey In addition to the required coordinate information, the following shall be included in all plans, at a minimum, as needed for construction staking on all City projects. ▪ Include copy of plat(s) on all plans, as relevant and approved by the Design Engineer ▪ Benchmarks – minimum of two City standards, four total desirable; as close to project as possible, even if TBM set with preliminary survey. ▪ Benchmark elevations must be in the same datum as the design (i.e. NAV 88 design needs NAV 88 benchmarks, not NAV 29) ▪ All control irons/identified property irons shall be shown on plans, with BL stationing and offset ▪ Show deflection angles in BL, and/or bearing/azimuth of BL sections ▪ Arterial project side streets – provide BL station at CL of intersection of the two streets, on the BL; BL station and offset to CL of side street at removal limits; include deflection angle from BL to CL of side street ▪ Existing FL/pavement grades shown at all match points ▪ Top of curb grades and stationing at all ends-of-return and horizontal/vertical P.I.’s, not just even stationing ▪ CL top of pavement grades for arterial ▪ CL elevation for streets on mass grading work @ 100’ Sta in tangent sections and 50’ on curves.

  • Building With respect to each parcel of Real Estate, all of the buildings, structures and improvements now or hereafter located thereon. Business Day. Any day on which banking institutions located in the same city and State as the Agent’s Head Office are located are open for the transaction of banking business and, in the case of LIBOR Rate Loans, which also is a LIBOR Business Day.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.