Examples of For approval in a sentence
For approval of Products other than those specified, a Tenderer should submit a request in writing to the City at least five business days prior to the Closing Time.
For approval of products by unnamed manufacturers, comply with requirements in Section 012500 "Substitution Procedures" for substitutions for convenience.
For approval of Tenant’s working drawings and specifications, all components in Tenant’s ceiling must be shown.
For approval of a connection into the City of Sydney’s drainage system an “Application for Approval of Stormwater Drainage Connections" must be submitted to the City, together with an application fee in accordance with the City of Sydney’s adopted Schedule of Fees and Charges.
For approval, a state plan must include provisions for the installation of a gas collection and control system meeting the requirements in paragraphs (b)(1) through (3) and (c) of this section at each MSW landfill meeting the conditions in paragraph (a) of this section.
For approval, a state plan must include provisions for the control of the gas collected from within the landfill through the use of control devices meeting the following requirements, except as provided in §60.24.
For approval, a state plan must require each owner or operator of an MSW landfill having a design capacity less than 2.5 million megagrams by mass or 2.5 million cubic meters by volume to submit an initial design capacity report to the Administrator as provided in §60.38f(a).
For approval by SACSCOC, the agreement must be between institutions that are accredited by a nationally recognized accrediting agency, be consistent with applicable standards in the Principles of Accreditation and with SACSCOC policies, and provide for the equitable treatment of students by ensuring that: 1.
For approval, a state plan must require each owner or operator of an MSW landfill having a design capacity equal to or greater than 2.5 million megagrams and 2.5 million cubic meters to either install a collection and control system as provided in paragraphs (b) and (c) of this section or calculate an initial NMOC emission rate for the landfill using the procedures specified in §60.35f(a).
For approval of an active substance, paragraphs 1, 2 and 3 shall be deemed to be satisfied where this has been established with respect to one or more representative uses of at least one plant protection product containing that active substance.