Drainage Plans definition
Examples of Drainage Plans in a sentence
Notwithstanding anything in the Code to the contrary, the Preliminary Plat for the Property, together with the Preliminary Drainage Plans and the Preliminary Infrastructure Plans shall be submitted at the same time to the City and together shall be deemed to serve as the Preliminary Plat.
The Preliminary Drainage Plans and the Preliminary Infrastructure Plans will be used to develop the Public Improvement Construction Plans.
Owners or Owners’ representative will, as soon as practical, notify Charterers if the vessel is involved in a pollution incident, grounding, collision, has any vessel systems failure relating to safety, or any other casualty causing delay or risk to the vessel, crew, cargo, or the environment by calling the 24-HOUR INCIDENT HOTLINE (▇▇▇) ▇▇▇-▇▇▇▇.
Upon approval of the final Plans by the District, Developer shall obtain the District’s written approval prior to any modification to the Drainage Plans, which approval shall not be unreasonably withheld.
DEA will prepare the Drainage Plans for the proper delivery of the project.
Such work shall be completed per the Approved Grading and Drainage Plans.
The Surety ensures the Developer, contractor, or subcontractor, has completed the work within the time specified, or any extension therefore, and to the specifications required in this Agreement and the Drainage Plans.
At a minimum, Buyer’s plans shall include: Master Plan; Site Plan; Colored Elevations; Conceptual Grading & Drainage Plans; Conceptual Utility Plans; and Conceptual Landscape Plans (the "Pre-App Plans").
In order to allow for the completion on the west embankment on and east of existing Runway 13-3 upon its closure, any and all work west of the Synthetic Bale Barriers protecting the Temporary Drainage Swale as shown on the DCP Volume II Concept Drawings, Airfield Storm Drainage Plans, Sheets C 07.02 and C 07.04 must be completed, in accordance with the Contract Documents, on or before June 1, 2013.
The Shared Drainage Improvements shall include, without limitation, any and all pipes, swales, retention basins and related improvements located on Lot1, Lot 2 and Lot 3 set forth in the Drainage Plans.