DEMONSTRATION PROJECTS Sample Clauses

DEMONSTRATION PROJECTS. (a) The department may allow cost sharing for items identified under sub. (2) if necessary to im- plement a demonstration project. The department shall require demonstration projects to meet all of the following criteria to be considered eligible for cost sharing under this subsection:
AutoNDA by SimpleDocs
DEMONSTRATION PROJECTS. The department may establish alternative eligibility criteria for urban and rural demonstration projects. With prior department approval, urban and rural demon- stration projects meeting these alternative criteria may be imple- mented during the grant period. History: Cr. Register, June, 1986, No. 366, eff. 7−1−86; r. (7) and (8), renum. (9) to be (7), Register, November, 1989, No. 407, eff. 12−1−89; am. (intro.), (1), (2) and (6), renum. (7) to be (8) and am., cr. (7), Register, February, 1995, No. 470, eff. 3−1−95; r. (intro.), renum. (1) to (8) to be (2) (r) to (y), cr. (1) and (2) (a) to (q) and (3), Register, July, 1996, No. 487, eff. 8−1−96. NR 120.18 Cost−share rates. (1) STATE COST−SHARE RATES. (a) Maximum state cost−share rates for individual best management practices are identified in Table 2. The cost−share rates for best management practices under existing cost−share agreements may be amended to use the rates identified in this sec- tion. The following maximum state cost−share rates shall be reduced by 50% for landowners of critical sites when a cost−share agreement is signed after the period of cost−sharing availability for critical sites has ended. Table 2 Maximum Practice state cost−share rate Contour farming . . . . . . . . . . . . . . . . . . . . . . . . 50%* Contour and field strip−cropping . . . . . . . . . . . 50%* High residue management systems . . . . . . . . . 50% Cropland protection cover (green manure) . . . Nutrient management (not to exceed a total of 50% 3 years) . . . . . . . . . . . . . . . . . . . . . . . . . . . Pesticide management (not to exceed a total of 50% 3 years) . . . . . . . . . . . . . . . . . . . . . . . . . . . 50% Livestock fencing . . . . . . . . . . . . . . . . . . . . . . . 50% Intensive grazing management . . . . . . . . . . . . . Manure storage facilities − for first $20,000 50%**** costs 70%***** Manure storage facilities − for remaining costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50%***** Pesticide spill control facilities . . . . . . . . . . . . 70% Animal waste system storage abandonment . . 70% Field diversions . . . . . . . . . . . . . . . . . . . . . . . . 70% Terraces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70% Grassed waterways . . . . . . . . . . . . . . . . . . . . . . 70% Critical area stabilization . . . . . . . . . . . . . . . . . 70% Grade stabilization structures . . . . . . . . . . . . . . 70% Agricultural sediment basins . . . . . . . . . . . . ....
DEMONSTRATION PROJECTS. Notwithstanding the verification or certification requirement set forth in Section X.F.1, LAWA may allow diesel equipment used for construction related to the LAX Master Plan Program to be outfitted with a new emission control device designated by LAWA as “Demonstration Project” at an LAX Master Plan Program construction site, even if the device has not yet been certified or verified by CARB or EPA for use for on-road or off-road vehicles or engines. LAWA, in consultation with the Coalition Representative and LAWA contractors, shall establish processes to determine if a Demonstration Project using a new emission control technology is warranted, and how the project will be implemented. These devices shall, at minimum, meet all the pollution reduction requirements specified in Section X.F.3.
DEMONSTRATION PROJECTS. The Secretary may issue loan guarantees under this section to projects to demonstrate commercially the feasibility and viability of producing ethanol using sugarcane, sugarcane bagasse, and other sugarcane byproducts as a feedstock.
DEMONSTRATION PROJECTS. During the term of the Cooperative Agreement, demonstration projects such as those proposed by the Central Nebraska Regional Water Conservation Task Force may be implemented, with the water designated for wildlife benefits. Net reductions in shortage to target flows achieved during the term of the Cooperative Agreement by such demonstration projects shall be credited to the water conservation/supply objectives of the Program.
DEMONSTRATION PROJECTS. The parties agree that each project shall have the objective of demonstrating to a potential investor or significant customer, on a demonstration facility scale, the attractiveness and competitiveness of the C7 technology. The parties further agree that the maximum number of such projects shall be ten (10), that the cumulative cost to Total G&P of participating in such C7 Demonstration Projects shall be not more than US$ 2.5 million, and that the commitments to supply, build and operate shall be entered into in 2013, unless otherwise agreed by the Parties.
DEMONSTRATION PROJECTS. Demonstration projects have to be the beginning of a fruitful cooperation between science and industry until and even beyond when the components have reached their break-even points. Well-planned and successful demonstrations need to start a chain reaction: each realization is the successful acquisition of the next cooperation project between industry and science. The demo shall ignite the first spark that is intended to grow into win/win situation for both parties. We shall focus more on technology readiness levels - TRL (5-7) in developing demonstration projects in the new term. Well-planned demonstration projects of energy storage technologies that are ready to be transferred to the market shall be carried out more. Two new annexes, namely Annex 30 and 31, have both begun their activities in demonstration plans targeting different sectors: • Annex 30 “TES for Cost Effective Energy Management and CO2 Mitigation” - Industrial processes - Power and co-generation plants - Non-residential buildings - Vehicles • Annex 31 “Integration of Energy Storage with Energy Efficient Buildings and Districts: Optimization and Automation” - Buildings - Districts Best practices and demonstration projects will be exposed to a wider audience from industry, policy makers and other research groups. Therefore one of the key strategic objectives for the coming period is to more actively encourage dissemination activities through existing communication channels. We will form a database of current energy storage projects that cover various technological sectors. The current database by DOE includes only storage projects that are connected to the grid and data on some of the projects needs to be updated. ECES shall make an effort to build its new database through an interactive Internet application. This will be a new Annex or a task in a new Annex. ECES will also provide a showcase of solutions that grew from laboratories to marketable products that our annexes have already achieved.
AutoNDA by SimpleDocs
DEMONSTRATION PROJECTS. The contract may be amended to add the following Task 11 and its Deliverables by the Consultant. The anticipated Consultant costs for completing Task 11 are generally assumed to range from $75,000 – 100,000. EXHIBIT A: 36 | City of Bend, Oregon City and Stakeholder Coordination and Engagement Work with the City, the TAC sub-committee, and community members to define the objectives and establish concrete goals and parameters for the event(s). Alta can provide the following tools to make the meetings interactive, engaging, and productive: • Photos and videos showing many possible event types and components • Evaluation results from past projects, to share input from other communities • Physical samples and demonstration of materials that can be used in temporary installations • Input on how events can be an interim step to permanent change • Input about the right way to involve interested partners, create champions, and defuse roadblocks • Best practices and observations from dozens of international as well as US events (tactical urbanism and open streets) managed by Street Plans and/or Alta Deliverables: • Attendance at(this will need to be more than 5) meetings, prepare summary notes of decisions and action items Site Design and Materials Kit Create a site design plan set for a demonstration project sites on Colorado Blvd and Greenwood West. The site plans will be suitable to construct the demonstration by an outside contractor, for all aspects of the event: layout and support services. Development of the materials kit will be as specific as possible while also allowing for future collaboration with the local city’s public works/engineering departments to make use ofmanymaterials already on hand. Thematerials kit will be created with event duration in mind.
DEMONSTRATION PROJECTS. (1) The Department agrees not to enter into any demonstration projects affecting bargaining unit employees without first meeting its obligations under Article 49 of this Agreement.
DEMONSTRATION PROJECTS. SECTION A: (1) Personnel demonstration projects as defined in all applicable laws, regulations and rules permit the EMPLOYER to test alternative personnel management concepts in controlled situations to determine the effects and ramifications of proposed changes before putting said changes into general effect.
Time is Money Join Law Insider Premium to draft better contracts faster.