Description of Work Required Sample Clauses

Description of Work Required. 3.4.3 The Descriptors align to and operate in conjunction with the Classification Definitions set out at Schedule A of the Higher Education Industry General Staff Award 2020. Positions will be classified in accordance with the Descriptors.
AutoNDA by SimpleDocs
Description of Work Required. The Contractor shall be required to manufacture new autoinjectors and store/maintain autoinjectors (both new and extended materiel) and component parts (includes labels and packaging for Army SLEP material, boxes for Army UDP, and DSCP pre-stock components). The storage requirement encompasses receipt processing, storage (i.e. vault, refrigeration, and controlled room temperature), record-keeping, Care of Supplies in Storage (COSIS). Re-labeling/over-labeling, assembling and packing will be performed upon receipt of a Delivery Order based on a funded Army requisition passed through the Defense Supply Center Philadelphia (DSCP). These costs will be as listed on page 55. These represent ceiling costs until they are audited by DCAA. Material shall be shipped as stated in this SOW.
Description of Work Required. A. MMT shall establish a program that will ensure that a sufficient number of qualified and properly trained temporary employees are available to staff the second and third production shifts for the production of NAAAs. MMT will secure a business arrangement with a subcontractor, Southside Temporaries (ST), to set up and maintain a contingency worker pool of 25 Assemblers for MMT. The number of assemblers is based on MMT being able to meet the 2MTW scenario by taking the following actions:
Description of Work Required. Manufacturing of new MCDM and the storage of materiel (both new and extended materiel). The storage requirement encompasses receipt processing, storage (i.e. vault, refrigeration, controlled room temp), record keeping, Care of Supplies in Storage (COSIS), remarking, assembly, packing, and shipment.
Description of Work Required. SUPPORT THE NCDOT -- Transportation Mobility and Safety Division (TMSD) BY PROVIDING TRANSPORTATION MOBILITY AND SAFETY ENGINEERING SERVICES AND SUPPORT AS DEFINED BY WORK CODES SPECIFIC TO THE "TMSD-DISCIPLINE AREAS" GIVEN BELOW, FOR WHICH THE FIRM WAS SELECTED. UNITS AND DISCIPLINE CODES LISTED HERE HOWEVER, OTHER "NON-TMSD" WORK CODES MAY BE REQUIRED THROUGHOUT THE LIFE OF THE CONTRACT(S), BASED ON DIVISION NEED/WORKLOAD AND PROJECT URGENCY. THE PREQUALIFICATION(S) FOR ANY "FUTURE-REQUIRED" "NON-TMSD" WORK CODE(S) WILL BE REVIEWED UPON DIVISION REQUEST ON A PROJECT-SPECIFIC BASIS. THESE "FUTURE-REQUIRED" WORK CODES ARE NOT CURRENTLY KNOWN. The consultant must be capable of delivering all work assignments and products in an expedient manner. All services listed/mentioned above shall be performed in accordance with the guidelines and standards for each unit. The design plans for the work products referenced above shall be prepared and provided in electronic format. The Department requires all electronic files be in Microstation format using Geopak software.
Description of Work Required. The Contractor shall construct Mountain Bike Trails, a Skills Park, and Pump Track located at 0000 Xxxx Xxxxx Xxxxx, Xxxxxxxxxx, XX 00000 (City-owned property, known as Wildwood Park, Parcel Numbers 86710, 25421, and 86711 (hereinafter referred to as the “Property”) using the Plan Specifications as defined in the Bid Advertisement and amendments, if any, construction documents, and project manual, said work being hereinafter referred to as the “Work”. The Plan Specifications, Bid Advertisement and amendments, if any, construction documents, and project manual are hereby incorporated by reference herein and made a part hereof as fully as if herein set forth. Unless otherwise specified herein, the Contractor is to furnish all necessary labor, materials, tools, equipment, superintendence, delivery and perform all necessary services to complete the Work at no additional costs to the City.
Description of Work Required. The CM/GC is expected to deliver Pre-Construction services that include the following: • Attend a mandatory 2-day kick-off meeting. This meeting will include the Designer, the CM/GC, the Independent Cost Estimator (ICE), and NCDOT. The meeting will focus on building a highly effective team fostering a collaborative environment on the first day, followed by project-specificdiscussion. The meeting should include primary subcontractors, if known. • Implement and manage an active risk management process with the project team to assess risks, opportunities, and benefits while controlling the project’s cost and schedule. The risk management process should include a working risk register managed by the CM/GC to track the risks, opportunities, and impacts. • Participate in scheduled project team meetings or conference calls with the designer, subcontractors, ICE, NCDOT, and third-party stakeholdersto identify issues, constraints, and mitigation opportunities. The meetings could be as frequently as weekly, depending on the need at the particular time of the pre-construction phase. • Participate in scheduled executive level meetings or conference calls with the designer’s principal, CM/GC’s principal, ICE’s principal, and NCDOT executive management to provide a project status and identify high-level issues requiring executive attention. These meetings could be as frequently as bi-weekly, depending on the need. • Provide open-book examination of an open cost model by NCDOT. • Actively participate in reviews of the construction documents to discuss cost and schedule optimization of the design. Formulate and evaluate alternative designs, systems and materials, and provide input on accelerated construction techniques. • Participate in the project public involvement process which may include, but is not limited to,public informational meetings, meetings with state, county and town officials, and meetings with local businesses and community groups. • Review the Designer developed Preliminary construction documents and work with the project team to develop the construction phasing for the project. Identify potential constructability issues and risks. Provide written reports documenting the recommendations within the construction documents to ensure completion of the Project within the required project constraints. • Provide an Opinion of Probable Cost (OPC) on the Preliminary construction documents. • Identify any early work packages such as procurement of long lead items ...
AutoNDA by SimpleDocs
Description of Work Required. The Contractor shall construct the Wildwood Park Welcome Center located at 0000 Xxxx Xxxxx Xxxxx, Xxxxxxxxxx, XX 00000 (City-owned property, known as Wildwood Park, Parcel Number 86710 (hereinafter referred to as the “Property”) using the Plan Specifications as defined in the Bid Advertisement and amendments, if any, construction documents, and project manual, said work being hereinafter referred to as the “Work”. The Plan Specifications, Bid Advertisement and amendments, if any, construction documents, and project manual are hereby incorporated by reference herein and made a part hereof as fully as if herein set forth. Unless otherwise specified herein, the Contractor is to furnish all necessary labor, materials, tools, equipment, superintendence, delivery and perform all necessary services to complete the Work at no additional costs to the City.
Description of Work Required. Work required includes activities described in the Scope of Services and may include, but not be limited to, the following:

Related to Description of Work Required

  • Description of Work (a) that has been omitted or

  • Statement of Work The Contractor shall provide the services and staff, and otherwise do all things necessary for or incidental to the performance of work, as set forth below:

  • Scope of Work The Contractor has overall responsibility for and shall provide and furnish all materials, equipment, tools and labor as necessary or reasonably inferable to complete the Work, or any phase of the Work, in accordance with the Owner’s requirements and the terms of the Contract Documents.

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

Time is Money Join Law Insider Premium to draft better contracts faster.