Development of Plans Sample Clauses

Development of Plans. At no cost to CALTRANS, and as will be further described in the DESIGN AND CONSTRUCTION AGREEMENT, LESSEE will prepare or cause to be prepared by others, the detailed plans and specifications for the PROJECT, including without limitation survey and final Lease Area Maps depicting the surveyable area of the PROPERTY and submit such plans and specifications to CALTRANS or its authorized representative, for prior QMA review and approval. The issuance by CALTRANS of ENCROACHMENT PERMIT(S) FOR CONSTRUCTION will be at CALTRANS’ sole discretion, which it will not exercise unreasonably or arbitrarily, and contingent upon such prior QMA review and approval by CALTRANS.
AutoNDA by SimpleDocs
Development of Plans. Landlord has developed and Tenant hereby approves the detailed base building description (the "Preliminary Design Concept") set forth or referenced in Exhibit B hereto for the Building and Premises describing in general terms the principal items of work and materials to be performed and supplied by Landlord. Attached hereto as Exhibit B-1 is a schedule (the "Progress Schedule") setting forth items and completion dates for various aspects of the development and construction of the Building. Landlord and Tenant agree to cooperate and use reasonable efforts to complete the items in the Progress Schedule by the respective completion dates so that the Substantial Completion Date occurs on or before the Scheduled Substantial Completion Date. In connection therewith, Landlord shall cause Landlord's Architect to prepare schematic architectural plans, structural and engineering plans, elevations and building sections, and site plans for the Building based upon the Preliminary Design Concept ("Schematic Design Documents"), which shall mean a conceptual design of the Base Building Improvements illustrating the scale and relationship of the components of the Base Building Improvements. The Schematic Design Documents shall show walkways and plazas for the Building and Lot, major landscape features, hardscaping, scale and relationship of other major components of the Building and Lot, pedestrian and vehicular (including service) access and flow through the Lot, lighting, survey information such as existing elevations, benchmarks and utilities, and any known construction limits. The Schematic Design Documents shall also include models, color renderings and outline specifications indicating all basic materials and systems of the proposed Base Building Improvements. The Schematic Design Documents and all subsequent Design Documents shall be prepared and distributed by Landlord's Architect in both hard copy and electronic format. During the development of the Schematic Design Documents, Landlord and Tenant shall meet with representatives of the CDD (as defined in Section 3.1.4 hereof) and their respective consultants to review and refine the design of the Building and the Lot. Thereafter, Landlord shall seek approval of the Schematic Design Documents by the Planning Board (as defined in Section 3.1.4 hereof), and Tenant shall cooperate with Landlord in connection therewith. If despite the good faith efforts of Landlord and Tenant the Planning Board rejects the design reflec...
Development of Plans. The Contractor acknowledges that the Initial Plans are interim plans only and the Initial Plans must be developed into final Plans by the Contractor in accordance with:
Development of Plans. Teachers who will be working individually on a one (1) year plan will meet with their administrator to review, refine and finalize the plan by October 1. Individuals who are designing a multiple year plan and teams of staff who will be developing a common plan for multiple years will meet with their administrator by November 1 to review, refine and finalize their plan. The plan must address the building student achievement goals, the District’s Comprehensive School Improvement Plan (CSIP) and be linked to the Iowa Teaching Standards. Changes to the plan(s) can be made at any time. The teacher and administrator shall sign and date the changes.
Development of Plans. All management plans are to be developed and updated as indicated in the DBA and in accordance with the Schedule 2 [Review Procedure].
Development of Plans and Programmes in transboundary conditions for air quality management (identification and examination of potential emission reduction measures; selection of suitable measures; scenarios for development of emissions in the period 2007- 2015; estimation of the development of air quality in the period 2007-2015; prioritisation of measures and financial analysis; guidelines to draw short term and long term action plans; establishing the margins of tolerance and alert thresholds in the areas in transboundary conditions; drafts of long term programmes for improving air quality for 1. Calarasi – Silistra,
Development of Plans 
AutoNDA by SimpleDocs

Related to Development of Plans

  • Development Plans 4.3.1 For each Licensed Indication and corresponding Licensed Product in the Field, Licensee will prepare and deliver to Licensor a development plan and budget (each a “Development Plan”). The initial Development Plans for each Licensed Indication will be delivered within […***…] after the Grant Date for such Licensed Indication.

  • Establishment of Plan The Company will maintain a Layoff Benefit Plan to provide for lump sum or income continuation benefits as set forth in this Article. Such Plan will apply to employees who are laid off with an effective date on or after October 7, 2012.

  • Approval of Plans Landlord will not check Tenant drawings for building code compliance. Approval of the Final Plans by Landlord is not a representation that the drawings are in compliance with the requirements of governing authorities, and it shall be Tenant’s responsibility to meet and comply with all federal, state, and local code requirements. Approval of the Final Plans does not constitute assumption of responsibility by Landlord or its architect for their accuracy, sufficiency or efficiency, and Tenant shall be solely responsible for such matters.

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Contract Area, including its abandonment.

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK Firms and/or individuals that assisted in the development or drafting of the specifications, requirements, statements of work, or solicitation documents contained herein are excluded from competing for this solicitation. This shall not be applicable to firms and/or individuals providing responses to a publicly posted Request for Information (RFI) associated with a solicitation.

  • Commercialization Plan On a Product by Product basis, not later than sixty (60) days after the filing of the first application for Regulatory Approval of a Product in the Copromotion Territory, the MSC shall prepare and approve a rolling multiyear (not less than three (3) years) plan for Commercializing such Product in the Copromotion Territory (the "Copromotion Territory Commercialization Plan"), which plan includes a comprehensive market development, marketing, sales, supply and distribution strategy for such Product in the Copromotion Territory. The Copromotion Territory Commercialization Plan shall be updated by the MSC at least once each calendar year such that it addresses no less than the three (3) upcoming years. Not later than thirty (30) days after the filing of the first application for Regulatory Approval of a Product in the Copromotion Territory and thereafter on or before September 30 of each calendar year, the MSC shall prepare an annual commercialization plan and budget (the "Annual Commercialization Plan and Budget"), which plan is based on the then current Copromotion Territory Commercialization Plan and includes a comprehensive market development, marketing, sales, supply and distribution strategy, including an overall budget for anticipated marketing, promotion and sales efforts in the upcoming calendar year (the first such Annual Development Plan and Budget shall cover the remainder of the calendar year in which such Product is anticipated to be approved plus the first full calendar year thereafter). The Annual Commercialization Plan and Budget will specify which Target Markets and distribution channels each Party shall devote its respective Promotion efforts towards, the personnel and other resources to be devoted by each Party to such efforts, the number and positioning of Details to be performed by each Party, as well as market and sales forecasts and related operating expenses, for the Product in each country of the Copromotion Territory, and budgets for projected Pre-Marketing Expenses, Sales and Marketing Expenses and Post-Approval Research and Regulatory Expenses. In preparing and updating the Copromotion Territory Commercialization Plan and each Annual Commercialization Plan and Budget, the MSC will take into consideration factors such as market conditions, regulatory issues and competition.

  • Amendment of Plan The Board may amend the Plan at any time with or without prior notice; provided, however, that no action authorized by this Section 16.2 shall reduce the amount of any outstanding Award or change the terms and conditions thereof without the Participant's consent. No amendment of the Plan shall, without the approval of the stockholders of the Company:

  • Development Program A. Development activities to be undertaken (Please break activities into subunits with the date of completion of major milestones)

  • List of Plans Section 3(p) of the Disclosure Schedule contains an accurate and complete list of all employee benefit plans ("Employee Benefit Plans") within the meaning of Section 3(3) of the Employee Retirement Income Security Act of 1974, as amended ("ERISA"), whether or not any Employee Benefit Plans are otherwise exempt from the provisions of ERISA, established, maintained or contributed to by OSMC (including all employers (whether or not incorporated) which by reason of common control are treated together with OSMC and/or the OSMC Stockholders as a single employer within the meaning of Section 414 of the Code) since September 2, 1974.

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

Time is Money Join Law Insider Premium to draft better contracts faster.