Building Sections Sample Clauses

Building Sections showing interior spaces and scale of the ceiling heights relative to roof structure and anticipated roof framing depths.
AutoNDA by SimpleDocs
Building Sections and Large scale wall sections as appropriate to this level of document development and as required to establish vertical controls for the Project. Include clear graphics, and notes on construction assemblies and systems to be used, dimensions, heights. Provide larger scale detailing to delineate solutions for connections.
Building Sections. S5.1 Concrete Details S5.2 Concrete Details S5.3 Concrete Details S5.4 Concrete Details S8.1 Wood Details S8.2 Wood Details S8.3 Wood Details S8.4 Wood Details S8.5 Wood Details S8.6 Wood Details Mechanical, Electrical and Plumbing Drawings M001 Symbol List and General Notes - Mechanical M002 Schedules - Mechanical M003 Title 24 - Mechanical M004 Title 24 - Mechanical M005 Title 24 - Mechanical M201 Floor Plan First Level - Mechanical M202 Floor Plan Second Level - Mechanical M203 Roof Plan – Mechanical M401 Enlarged Plans – Mechanical M601 Diagrams - Mechanical M602 Diagrams - Mechanical M603 Diagrams - Mechanical M604 Diagrams - Mechanical M701 Details - Mechanical M702 Details - Mechanical M703 Details - Mechanical M801 Control Diagrams - Mechanical M802 Control Diagrams - Mechanical M803 Control Diagrams – Mechanical E001 Symbol List and General Notes - Electrical E002 Luminaire Schedule E003 Title 24 - Electrical E004 Title 24 - Electrical E100 Site Plan - Electrical E200 Floor Plan Crawl Space Level - Lighting E201 Floor Plan First Level - Lighting E202 Floor Plan Second Level - Lighting E300 Floor Plan Crawl Space Level - Power E301 Floor Plan First Level - Power E302 Floor Plan Second Level - Power E401 Roof Plan - Power E501 Single Line Diagrams - Electrical E601 Panel and Equipment Connection Schedules - Electrical E701 Details - Electrical E702 Details – Electrical P001 Symbol List and General Notes - Plumbing P002 Schedules - Plumbing P200 Floor Plan Crawl Space Level - Plumbing P201 Floor Plan First Level - Plumbing P202 Floor Plan Second Level - Plumbing P203 Roof Plan - Plumbing P501 Details – Plumbing FA001 Symbol List and General Notes – Fire Alarm FA300 Floor Plan Crawl Space Level – Fire Alarm FA301 Floor Plan First Level – Fire Alarm FA501 One – Line Diagram and Calculations – Fire Alarm Division Specification Section or Plan Reference Description Recommendations/ Notes Value 01 ‐ General Requirements 01 5000 Delete the requirement for work zone cam Accept‐ Camera will be provide by PCCD $5,200.00 01 8113.13.1 LEED Certification to Gold Reject $0.00 Reduction in General Conditions Accept $3,500.00 02 ‐ Existing Conditions A001, Demolition Note 4 Existing Chain Link Fence to Remain Accept‐ Xxxxx to confirm extent $4,300.00 A001, Demolition Note 5 Remove Existing Wood Fence Only as Necessary Accept‐ Xxxxx to confirm extent $2,850.00 A001, Demolition Note 7 Trees to Remain in Existing Location Reject $0.00 03 ‐ Concrete A310 Delete 3" Ligh...
Building Sections. Dimensions: Vertical dimensions relating to floor, ceiling, roof, top of steel Provide grid lines and cross reference to floor plans Materials: Note and indicate material as well as listed fire rated assemblies ❑ G. Reflected Ceiling Plan Provide ceiling construction. Show ceiling breaks, or change in height Show ceiling pattern, diffusers, light fixtures, exit signage and access panels ❑ H. Enlarged Floor Plan(s) Toilet Room Plans: Plumbing fixtures, stall layout, and handicap accessibility Verify plumbing fixture count with code requirements. Kitchens: Kitchen equipment layout ❑ I. Interior Elevations Toilet Room Elevations: Plumbing fixture heights and handicap accessibility Indicate wall finish materials ❑ J. Schedules Room Finish Schedule: Show interior finishes Door Schedule: Door types, sizes and fire rating, door hardware Window Schedule: Window types, frames, labels, glazing and sizes ❑ K. Architectural Details Stairs: Riser and tread dimensions, headroom clearance, and handrail details and attachment details Guardrails: Height and distance between intermediate rails and attachment details Ramps: Slope and length and handrails Wall Types: Fire rated construction, corridor walls, shaft walls, area separation walls, occupancy separation walls. Indicate listed assemblies for fire rated construction. Specify fire penetration sealants at rated walls.
Building Sections. A7.1 Sections & Details A7.2 Sections & Details A7.3 Sections & Details A7.4 Sections & Details A7.5 Sections & Details A7.6 Sections & Details A8.1 Rated Assemblies
Building Sections. A7.1 Sections & Details A7.2 Sections& Details A7.3 Sections & Details A7.4 Sections & Details A7.5 Sections & Details A7.6 Sections & Details A8.1 Rated Assemblies A8.2 Rated Assemblies S001 General Notes, Schedules, Legend, & Load Tables S002 Notes, Schedules, and Special Inspection Notes S101 Foundation Plan S102 Second Floor Framing Plan S103 Third Floor Framing Plan S104 Attic Framing Plan S105 Roof Framing Plan S201 Foundation Sections S301 Floor Framing Sections S401 Roof Framing Sections WARNING: This AlA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:26:57 on 09/01/2005 under Order No.0000000000_1 which expires on 8/26/2006, and is not for resale. User Notes: (0000000000) S402 Typical Details S500 Frame Elevations
AutoNDA by SimpleDocs
Building Sections. 10. Building Finish, Door and Window Schedules.
Building Sections e. Preliminary wall sections.
Building Sections. Show vertical dimensions relating to floor, ceiling, and roof height. Note and indicate all materials and proposed listed assemblies for fire rated construction.  F. Reflected Ceiling Plan Indicate ceiling materials. Show proposed ceiling layout.  G. Enlarged Floor Plan(s) (as appropriate) Toilet Room Plans: Show plumbing fixtures, stall layout and handicap accessibility. Verify plumbing fixture count with code requirements. Kitchens: Show kitchen equipment layout.  X. Xxxxxxxxx Develop outlines for doors, windows and associated frames.  I. Structural Notes Outline to include: Live Loads: Floor, stairs, corridors, roof, snow, earthquake and wind. Dead Loads: Material weight, mechanical and electrical weight, wet-pipe or dry-pipe fire sprinkler system, and soil bearing pressure. Material Strength: Concrete, masonry, steel and wood. Foundation design based on Soils Report.
Time is Money Join Law Insider Premium to draft better contracts faster.