Design Details Sample Clauses

Design Details. EXTERNAL AND INTERNAL COLOURS AND FINISHES The following design details must be submitted for approval by Council’s Area Planning Manager prior to the issue of a Stage 4 Construction Certificate:
AutoNDA by SimpleDocs
Design Details. STRUCTURAL INTERVENTIONS INTO HERITAGE LISTED BUILDINGS The following architectural design details of the proposed structural interventions relative to the heritage fabric of the buildings at Nos 000 xx 000 Xxxxxx Xxxxxx, must be submitted for approval by Council’s Area Planning Manager prior to the issue of a Stage 1 Construction Certificate:
Design Details. In addition to the design details required in the various conditions relating to design modifications, the following design details must be submitted to and be approved by Council’s Area Planning Manager prior to the issue of a Stage 1 Construction Certificate:
Design Details. The PAC indicated a desire to incorporate architectural design requirements within the proposed MPS policy amendments regarding the future Phase III buildings fronting Xxxxxx Street so that there is greater certainty that any future building(s) are complementary to the heritage buildings which exist in the area. Although a maximum building height of 60 feet on Xxxxxx Street is specified in the proposed MPS amendment (policy 2.4.2), this policy did not specifically address architectural details and building materials. There are existing policies in the Halifax Waterfront Development Area (HWDA) which deal with the issue of complementary architecture (Policies 5.6, 5.6.1), but it is useful to be more specific in the proposed amendments so that any future development on Xxxxxx Street is complementary to the existing heritage buildings and streetscape. Staff and the developer concur with this approach. Staff have drafted an additional policy to include within the proposed amendments (see Policy 2.4.5, Attachment A to this report). As the building height (60 feet) on Xxxxxx Street and the setback for the proposed Alexander building (65 feet from Xxxxxx Street) are already specified, staff feel there is no further need to address the building height/ scale. HRM by Design: Concerns were raised by the HAC with regard to the timing of the HRM by Design exercise and whether the proposal is in keeping with it's objectives. As indicated in the staff report of April 2, 2008, the HRM by Design process is anticipated to result in changes to the Halifax MPS. Likewise, the Halkirk application proposes amendments to the MPS. Both of these processes were initiated by Council, but neither has received approval to date. Therefore, a decision by Council on the Halkirk proposal cannot be based upon whether it meets HRM by Design, in its entirety or otherwise. Staff anticipate that the public hearing for HRM by Design will not occur before September. The Nova Scotia Utility and Review Board (NSUARB) dealt with a similar issue with the United Gulf (Texpark) decision in 2007. In that case, the Board had to decide on the relevance of the draft “Barrington Street Revitalization Plan”, which Council had adopted in principle, and the (then proposed) Regional Plan and whether Council should have taken these studies into account in making a decision on the development agreement proposal. The Board determined that these studies were irrelevant because they weren't duly approved policies o...
Design Details. As the Architect progresses with the preparation of the Schematic Design, Design Development and Construction Documents, SitelogIQ shall consult with the Owner and Architect and make recommendations whenever SitelogIQ determines that design details adversely affect constructability, cost or schedules.
Design Details c. The Engineer, or designee, will resolve any discrepancies between these documents. The following order of precedence (highest to lowest) will normally apply:
Design Details. Detailed design intent construction drawings must be submitted at a scale no smaller than 1:20 for the following elements:
AutoNDA by SimpleDocs

Related to Design Details

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.

  • TECHNICAL EVALUATION (a) Detailed technical evaluation shall be carried out by Purchase Committee pursuant to conditions in the tender document to determine the substantial responsiveness of each tender. For this clause, the substantially responsive bid is one that conforms to all the eligibility and terms and condition of the tender without any material deviation. The Institute’s determination of bid’s responsiveness is to be based on the contents of the bid itself without recourse to extrinsic evidence. The Institute shall evaluate the technical bids also to determine whether they are complete, whether required sureties have been furnished, whether the documents have been properly signed and whether the bids are in order.

  • Design-Builder The person or entity responsible for the proper completion of the activities described in the Contract Documents and who executes the Contract.

  • Technical Support State Street will provide technical support to assist the Fund in using the System and the Data Access Services. The total amount of technical support provided by State Street shall not exceed 10 resource days per year. State Street shall provide such additional technical support as is expressly set forth in the fee schedule in effect from time to time between the parties (the “Fee Schedule”). Technical support, including during installation and testing, is subject to the fees and other terms set forth in the Fee Schedule.

  • Design Criteria The Engineer shall develop the roadway design criteria based on the controlling factors specified by the State (i.e. 4R, 3R, 2R, or special facilities), by use of the funding categories, design speed, functional classification, roadway class and any other set criteria as set forth in PS&E Preparation Manual, Roadway Design Manual, Bridge Design Manual, Hydraulic Design Manual, and other deemed necessary State approved manuals. In addition, the Engineer shall prepare the Design Summary Report (DSR) and submit it electronically. The Engineer shall obtain written concurrence from the State prior to proceeding with a design if any questions arise during the design process regarding the applicability of State’s design criteria.

  • Design Review Consumer shall provide Holy Cross an electrical one-line diagram and a relaying and metering one-line diagram prior to completion of detailed designs, unless the Consumer is installing a packaged system that is pre-certified to IEEE 1547.1 and UL 1741 standards. Packaged systems pre-certified under IEEE Standard 1547.1 and UL Standard 1741 will not require a relaying and metering one-line diagram. The submitted application and diagrams will be processed, reviewed, and acted upon in accordance with the Holy Cross Interconnection Policy.

  • Project Number The project number has been assigned by the Commission as the unique identifier for your project, and it cannot be changed. The project number should appear on each page of the grant agreement preparation documents to prevent errors during its handling.

  • Design Development Documents See Section 2, Part 1, Article 2.1.5.

  • Technical Support Services 2.1 The technical support services (the "Services"): Party A agrees to provide to Party B the relevant services requested by Party B, which are specified in Exhibit 1 attached hereto ("Exhibit 1").