As-Built Records. The Contractor shall prepare, and keep up-to-date, a complete set of as built records of the execution of the Works, showing the exact as built locations, sizes and details on the Works as executed with cross references to all relevant specifications and data sheets. These records shall be kept on the Site and shall be used exclusively for the purpose of this Sub-Clause 10.8. The Contractor shall provide 2 (two) copies of as built records to the Authority prior to the commencement of the Tests on Completion.
AutoNDA by SimpleDocs
As-Built Records. Maintain/develop at the project site one set of full-size contract drawings and specifications marked to show any deviations which have been made from the Contract Task Order drawings or specifications including buried or concealed structures and utility features revealed during the course of site work. Record the horizontal and vertical location of buried utilities that differ from the contract drawings. The drawings shall be available for review by the Contracting Officer at all times. Upon completion of the work, deliver the marked set of prints to the Contracting Officer or designated representative.
As-Built Records. At the end of the project, the Contractor will submit to the City a certified as built site survey showing coordinates and elevations of the completed work.
As-Built Records. The Project QC Manager is required to review the as-built records to ensure that as-built records are kept current on a daily basis and marked to show deviations that have been made from the contract drawings. The Project QC Manager shall initial each deviation or revision. Upon completion of work, the Project QC Manger shall submit a certificate attesting to the accuracy of the as-build records prior to submission to the Ordering Officer or designated representative.
As-Built Records. Company, without expense to Township, shall, upon 48 hours' notice, give Township access to all "as-built" maps, records, plans and specifications showing the Small Wireless Facilities or portions thereof in the ROW.
As-Built Records. The Project QC Manager is required to review the as-built records required by paragraph
As-Built Records. ‌ The Contractor shall prepare, and keep up-to-date, a complete set of as built records of the execution of the Works, showing the exact as built locations, sizes and details on the Works as executed with cross references to all relevant specifications and data sheets. These records shall be kept on the Site and shall be used exclusively for the purpose of this Sub-Clause 10.8. The Contractor shall provide 2 (two) copies of as Improvement/Widening to 2 Lane with Earthen Shoulder of Ranikor- Maheshkola-Baghmara road section from Rongara to Panda, existing chainage from km 102+345 to km 119.810 (design Chainage from km 96+000 to km 112.300) design length-16.30km on EPC Mode under SARD-NE ‘Phase-A’ in the State of Meghalaya” June 2020 built records to the Authority prior to the commencement of the Tests on Completion.
AutoNDA by SimpleDocs
As-Built Records. Contractor shall maintain a current and accurate record of the work completed during the course of this contract. This may be in the form of “as-built” drawings kept by accurately marking a designated set of the contract plans with the specified information as the Work proceeds. Accurate, complete. and current “as-built” drawings are a specified requirement for full payment of the work completed. At project completion and as a condition of final payment, the Contractor shall deliver to the Project Manager a complete and legible set of “as-built” drawings. The “as-built” drawings must show the information listed below. Where the term “locate” or “location” is used, it shall mean record of position with respect to both the construction vertical datum and either construction horizontal datum or a nearby permanent improvement.
As-Built Records. The Contractor shall record all amendments and deviations from the drawings issued at the start of the Contract. This shall be done on a set of drawings specially issued for this purpose. These shall be handed to the Employer on completion of the Works. The Certificate of Completion will not be issued without this information having been submitted to the Employer.
As-Built Records. A. The Contractor shall keep at the site of work an accurately marked record set of drawings and specifications as the job progresses, with all changes or deviations from the original Contract Documents recorded thereon for work under the Contract. Ensure entries are complete and accurate, enabling future reference by Owner.