Construction Document Phase Sample Clauses

Construction Document Phase. 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner.
AutoNDA by SimpleDocs
Construction Document Phase. 1.4.1 Based on the approved Design Development Documents and any further adjustments in the scope or quality of the Project or in the Project Construction Cost Limitation authorized by the Owner, the Project Architect shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings and Specifications in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, Owner’s Design Guidelines and any additional requirements contained in Article 14 of this Agreement. The plans, drawings and specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Construction Cost Limitation established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Project Architect will be responsible for managing the design to stay within such Guaranteed Maximum
Construction Document Phase. 2.4.1 Upon approval of the Analysis/Inspection/Schematic Phase by the Owner, the Professional shall prepare and submit to the Owner four (4) copies of working drawings and specifications detailing and prescribing the Work to be accomplished including materials; workmanship; finishes; mechanical and electrical systems; special equipment; general, special, and Supplementary Conditions of the Agreement Between the Owner and the Contractor and any and all other information required for receiving bids on the Project and subsequent preparation of Shop Drawings and detailed drawings.
Construction Document Phase. 1.4.1 Based on the approved Design Development Documents and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare utilizing BIM/3D, for approval by the Owner, Construction Documents consisting of Drawings, Schedules and Specifications in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be prepared so that the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Amount Available for the Construction Contract established by Owner. The Architect/Engineer will be responsible for managing the design to stay within the Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner at the Project site or other location specified by Owner in the State of Texas.
Construction Document Phase a. Prepare complete final working drawings which clearly define all architectural, structural, mechanical, electrical, sanitary, heating, equipment and site details, alternates and all other details necessary to complete the design and construction of the Project. The Consultant’s compensation, if any, for services in connection with alternates shall be determined in accordance with the provisions of Section D (8) of Article III hereof.
Construction Document Phase. 1.4.1 Based on the approved Design Development Documents and any further adjustments in the scope or quality of the Project or in the Project Construction Cost Limitation authorized by the Owner, the Project Architect shall prepare, for approval by the Owner, Construction Documents consisting of Drawings and Specifications in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, Owner’s Design Guidelines and any additional requirements contained in Article 14. The plans, drawings and specifications for the entire Project shall be prepared so that the construction of the building and related facilities, including built-in permanent fixtures and equipment, will cost no more than the Construction Cost Limitation established by Owner. The Project Architect is responsible for managing the design to stay within the Construction Cost Limitation.
Construction Document Phase. 2.7.1 Upon approval of the Design Development Phase by the Owner, the Professional shall prepare and submit to the Owner four (4)
AutoNDA by SimpleDocs
Construction Document Phase. (Final Plans)
Construction Document Phase. 3.3.1 Based on the approved Design Development documents and any further adjustments in the scope or quality of the Project or in the Project Construction Cost Limitation authorized by the Owner, and following approval of the Design Development submittal by the Board of Regents, the A-E shall prepare, for approval by the Owner, Construction Documents consisting of Drawings and Specifications in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, Owner’s Design Guidelines. The plans, drawings and specifications for the entire Project shall be prepared so that the construction of the building and related facilities, including built-in permanent fixtures and equipment, will cost no more than the Construction Cost Limitation established by Owner. The A-E is responsible for managing the design elements of the Project to stay within the Construction Cost Limitation based upon pricing information provided by his independent cost estimator and the Construction Manager-at-Risk (CM@R). The Owner, A-E and CM@R may agree that the Project will be constructed in phases; in that event, the requirements listed below will apply separately to each of two or more different Construction Bid Packages within the Project.
Construction Document Phase. 2.11.1 The Architect/Engineer shall solicit and obtain written authorization from the Trustees to proceed with the Construction Document Phase work. Upon receipt of written authorization, the Architect/Engineer using the approved Preliminary Phase Design Documents shall prepare the project Construction Documents. The Construction Documents shall be prepared in accordance with Exhibit D, CSU
Time is Money Join Law Insider Premium to draft better contracts faster.