Test and Inspection Sample Clauses

Test and Inspection. 7.1 PI shall conduct incoming inspection of the WAFERS, by WAFER TYPE, to determine the WAFERS’ conformance to the COMMON SPECIFICATIONS. The PCM DATA specified in Section 6.5 is required for the incoming inspection of the WAFERS and the omission, inaccuracy or other defect in the PCM DATA will in itself be sufficient cause to reject the WAFERS. This inspection shall be regarded as final in terms of quality, quantity and other conditions of the WAFERS supplied to PI subject to OKI’s warranty as defined in Section 11.1. All WAFERS passing the incoming inspection will be accepted by PI.
AutoNDA by SimpleDocs
Test and Inspection. 5.1 Inspection of the equipment will be done at hospital.
Test and Inspection. (a) By Toshiba. Toshiba will supply to NMI, with each Wafer shipment, ---------- process control monitor ("PCM") test results, actual Wafer sort data results, and visual quality inspection results as agreed by the parties. Toshiba will sort Wafers and "user repair" the DRAM module prior to shipment on the DRAM portions of the die.
Test and Inspection. 9.1 Testing equipment and personnel
Test and Inspection. All the cable shall be subject to routine test at the manufacturer’s works in accordance with relevant ISS mainly for its Ratings, insulation, continuity and High Voltage Tests. Acceptance tests shall be conducted in one drum of each size as per relevant ISS. All tests shall be carried out in the presence of purchaser’s representative. In addition, the cable shall be subjected to inspection at site for final acceptance. The above tests and inspections shall, however, not absolve the vendor free from his responsibility for making good any defects which may be noticed subsequently.
Test and Inspection. (a) The Contractor shall at its own expense carry out on the Site all such tests and/or inspections as needed to achieve the Services, and in accordance with the standards and procedures described in Schedule b (Scope of Services) and any test not explicitly listed but required by the Project Manager.
Test and Inspection. The soft drawn copper conductors shall be tested and inspected in accordance with the requirements of this specification, IEC 60502-1 and IEC 60228. It shall be the responsibility of the manufacturer to perform or to have performed the tests specified. The contractor shall have calibrated equipment’s by authorized party for inspection purposes * * Cross – section drawing showing each part of the cable, dimensions and thickness to be submitted with the tender document Technical specification for Low Voltage Cables Item 8: Drumming: Drumming: All cables shall be supplied on robust drums of approved materials and construction suitable to withstand very rough transport and handling and to enable conductors or cables to be pulled out smoothly. Drums shall be non- returnable and, if made from timber, shall be pressure – impregnated against fungal and insect attack. Wooden drums shall be logged with closely fitting battens in accordance with BS .1559 or such other standard as may be approved. Battens shall be firmly secured to the drum flange using steel tape not less than 25 mm wide and 2mm thick and stapled to at least every third xxxxxx. Drum spindle holes shall be reinforced by steel plates. Drum diameters and the maximum width of drums shall be suitable for the jacks provided under this contract. Each drum shall bear a distinguishing number on the outside of flange. Particulars of the conductor or cable, i.e. Voltage, conductor size and material, number of cores, length type code name and gross and net weights shall also be clearly shown on one flange, together with an approved xxxx. The xxxxx weight of cable drums shall be clearly shown on one flange. The direction of rolling shall be indicated by an arrow on each flange. The method of marking shall be by gouging, burning or other legible and indelible method approved by the Engineer. Immediately after works tests both ends of cables shall be sealed against the ingress of moisture, dirt and insects and the end projecting from the drum shall be adequately protected against mechanical damage during handling. Cut ends of bare conductors shall be also being treated in an approved manner. Where applicable, cables and conductors shall be supplied in maximum drum length, bearing in mind the transport limitations in gaining access to the site. No drum shall contain more than one length. Details of standard construction of IDECO self-supporting overhead Al. cables: IDECO cable consist of one to four XLPE insulated a...
AutoNDA by SimpleDocs
Test and Inspection. 7.1. Any tests of the Products or any act thereof undertaken by FACO at the request or on the instructions of the Customer shall be at the expense of the latter who shall reimburse to FACO the cost thereof.
Test and Inspection. 12.1 OKI shall conduct E-test and visual inspection according to the Common Specification before the delivery of the Wafers of the PI Products.
Test and Inspection. All test and inspection results of the Company have provided to any government agency pursuant to any government contract or any subcontract or as a part of the delivery to the government of any article designed, engineered or manufactured by the Company were true, complete and correct. Except as set forth in Schedule 4.8(b), the Company has provided all test and inspection results to government agencies as required by law or pursuant to government contracts or subcontracts, or may have been required as part of the delivery of any article designed, engineered or manufactured by the Company.
Time is Money Join Law Insider Premium to draft better contracts faster.