Employer’s requirements Sample Clauses

Employer’s requirements. 2.11 Subject to clause 2.15, the Contractor shall not be responsible for the contents of the Employer’s Requirements or for verifying the adequacy of any design contained within them.
AutoNDA by SimpleDocs
Employer’s requirements inadequacy
Employer’s requirements for the service Supply chemical suitable for treatment process. The supply of feed water treatment chemical Ammonia Solution chemical 10%-35% to Hendrina Power Station. Technical performance of the chemical treatment must maintain the pH control of (9.2 – 9.3) in the feed water system. Certificate of analysis of the chemicals to be provided with every delivery. Material Safety Data Sheets (MSDS) of the chemicals to be provided with every delivery SCOPE OF WORK FOR WATER TREATMENT PLANT BULK CHEMICALS (Coagulant - 0209529 & Polyamine Flocculant – 0157272 ) Supply and delivery of the Water treatment Chemicals Flocculant and Coagulant dosing.
Employer’s requirements for the service Supply, deliver, install, commission and maintain dosing equipment suitable for chemical treatment process. Supply and monitor the coagulant and flocculant treatment process. Technical performance of the chemical treatment must maintain the Total organic carbon (TOC) percentage removal of greater than 35% and Turbidity (NTU) of <2 across the clarifiers. The turbidity on the outlet of the sand filters must be less than 0.2NTU. Both chemicals must be dosed separately. Both chemicals must not have negative impact on the demineralized plant resins Dosing Regime: • Both chemicals Coagulant and Flocculant dosing to be continuouslyMaterial Safety Data Sheets (MSDS) of the chemicals to be provided with every delivery • Add a clearly visible MSDS label in front of the tanks • Certificate of analysis of the chemicals to be provided with every delivery. • Supply chemical dosing system /equipment. There should be two pumps for every chemical, one in service and one on standby. • Supply storage bulk tanks facilities including a suitable bund to contain any spillages and a level indicator for each tank. The bunds should be sized such that it can contain at least 110% of the volume of the chemical. • Split dosing of chemicals (Coagulant and Flocculant) • The system must be installed to ensure pot drop tests can be done both systems • The plant must fully labelled, indicating KKS numbers as well as the description of the equipment • Clearly display product name and summarized safety precautions on the storage tanks • Ensure continuity of treatment from start of contract up to end date as decided by Hendrina • Supply offloading facility/equipment for bulk chemical transfer, including a proper bund to contain spillages and proper supports for the transfer pipes. • Respond on breakdown as per notification • Be available 24hrs/day for any technical back-up assistance on emergencies that might be needed • Monitor the system and status performance of treatment (site visits) and submit weekly reports containing as a minimum: -stock levels of chemicals at all dosing stations -availability of dosing equipment: indicating which pumps are in service, dosing rate of each pump -condition of all equipment -consumption of chemicals at each dosing station -safety inspection -proposed delivery dates to top up chemical stocks • Supply remedial actions on findings of unsatisfactory performance • Perform Jar Test monthly, as monitoring control for the effectiveness of the ...
Employer’s requirements a) General Requirements b) General Conditions of Contract (See (2) above) c) Particular Conditions of Contract (See (3) above) d) Design Brief
Employer’s requirements. The Employer’s Requirements are specified and defined by the documents and drawings detailed within the list entitled Frozen Basic Design Drawings & Documents dated 30/06/2014 and by the document entitled User Requirement Specification (URS) For MosaiQ Consumable Manufacturing Facility URS0023.R01, attached hereto. For the avoidance of doubt the definition “Employer’s Requirements” shall be deemed to include both: the above referenced and attached documents, and the documents and drawings referred to therein. Each document referenced shall each be considered to be documents forming part of the Agreement (either by inclusion or by reference), and are intended to be mutually explanatory. In the event of any conflict or ambiguity between them:
Employer’s requirements for the service The scope includes the provision of the following facilities management services:  Supervision Service  Cleaner Service  Supply of Cleaning Consumables and Hygiene Consumables  Pest Control and Rodent Control Service  Dedicated Carwash Service at Specific Corporate Sites  Gardener and Odd Jobs Service for these sites: o Graaf Reinet CNC o Uitenhage CNC o Uitenhage Complex o Cradock CNC o Joubertina CNC o Kareedouw CNC o Albany CNC o Humansdorp CNC and Humansdorp WIC o Alexandria CNC o Patensie CNC o Kirkwood CNC o Grahamstown WIC  External Window Cleaning exceeding a height of 3.3m The Contractor shall provide all labour, supervision, administration and management, equipment, tools, supplies and material required to perform the facilities management services specified herein. Working times Monday - Friday: 7am to 15:30pm Saturday & Sunday: 7am to 15:30pm (if required)
AutoNDA by SimpleDocs
Employer’s requirements. The Consultant is expected to complying with all the requirements governing Kusile site and other Eskom sites. Some of these requirements are: • Emergency preparedness procedure; • Eskom Cardinal rules and values; • Access control procedure; • Vehicle access control procedure; and • SHE requirements
Employer’s requirements. Employer’s Requirements for ... xxxx://xxxxxxxxxxxxxxxx.xxx/images/stories/mirsi/pdf/employersreq.pdf Standard Employment Contract (can be obtained at Philippine All of the above documents should be verified by Philippine Embassy/ POLO. For Saudi Embassy: DEPARTMENT OF LABOR & EMPLOYMENT PHILIPPINE OVERSEAS ... xxxx://xxx.xxxxxx.xxx/uploads/images/MasterContract.pdf STANDARD EMPLOYMENT CONTRACT FOR OVERSEAS FILIPINO WORKERS (VARIOUS SKILLS) Administration or the Philippine Embassy and without written consent of Related Documents:
Employer’s requirements for the service The Contractor is responsible for providing skills mentioned in the service information on an as and when required basis in Grootvlei Power Station. The contractor shall be responsible for: • Attending meetings when required • Staffing and management • Ensure compliance with OSHAct and national standards • Ensure compliance with Eskom policies and procedures • Compliance to all legal requirements • The Contractor shall make the plant available immediately after Task Order issue. • The breakdown turnaround time is 48hours, refer to low performance service table (X17) on C1 2a (data by the Employer). • Qualified mechanic (s) should be provided to attend to all machine breakdown within the specified duration (48 hours) as specified on X17 Table (low performance Service). • All machines shall be in good working order and safety equipment /tools shall be provided where applicable at all times (i.e fire extinguishers and first aid box etc). • The C.O.C’s/operating licences for the equipment operators shall be provided and they shall be in line with the requirements of this contract? • Plant Mechanic(s) shall be qualified and trade tested on the (Diesel Mechanic).