Design Review Consumer shall provide Holy Cross an electrical one-line diagram and a relaying and metering one-line diagram prior to completion of detailed designs, unless the Consumer is installing a packaged system that is pre-certified to IEEE 1547.1 and UL 1741 standards. Packaged systems pre-certified under IEEE Standard 1547.1 and UL Standard 1741 will not require a relaying and metering one-line diagram. The submitted application and diagrams will be processed, reviewed, and acted upon in accordance with the Holy Cross Interconnection Policy.
Project Review A. Programmatic Allowances
REVIEW OF WORK The Consultant shall permit the City, its agents and/or employees to review, at any time, all work performed pursuant to the terms of this Agreement at any stage of the work;
Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE
Workshops During the month of September or October of each year during the term of this Agreement, there shall be held at each University a workshop for Department Chairs at which will be discussed their roles and responsibilities as such. Representatives of the University, at its election, and representatives of the Association, at its election, shall be permitted to participate jointly in such workshop.
Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.
Commissioning Commissioning tests of the Interconnection Member’s installed equipment shall be performed pursuant to applicable codes and standards. The Cooperative must be given at least five Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.
Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.
Training Program It is agreed that there shall be an Apprenticeship Training Program, the provisions of which are set forth in Exhibit "C", which is attached hereto and forms part of this Agreement.