PERCENTAGE OF CONSTRUCTION COST Sample Clauses

PERCENTAGE OF CONSTRUCTION COST. 6.2.1 When the Project fee is based on a percentage of construction cost, the basic building shall be classified as one (1) of five
AutoNDA by SimpleDocs
PERCENTAGE OF CONSTRUCTION COST. 6.2.1 When the Project fee is based on a percentage of construction cost, the basic building shall be classified as one (1) of five (5) types. Only the Owner shall be responsible for deciding in which classification the Project falls as indicated in Subparagraph 1.2.2. The building classifications are: Type A: Projects of simple, utilitarian character without complication or detail and with a high degree of repetition, such as parking structures, garages, loft type structures, warehouses (exclusive of automated equipment), industrial buildings and farm structures. Type B: Project of simple character requiring normal attention to design, detail, and with moderate repetition, such as armories, apartments, bakeries, cold storage facilities, exhibition halls, freight facilities, hangers, manufacturing, industrial plants, motels, office buildings (without tenant improvements), packaging and processing plants, printing plants, public markets, roads, skating rinks, and service garages. Type C: Projects of conventional character requiring normal attention to design and detail, complete with complete mechanical and electrical systems, such as bridges, cinema, college classroom facilities, convention facilities, dining halls (institutional), dormitories, fire stations, gymnasiums*, hotels, laundries and cleaning facilities, marinas, nursing homes, office buildings (with tenant improvements), parks, playground and recreational facilities, police stations, post offices, publishing plants, restaurants, schools (elementary and secondary), specialty shops, stadiums, transportation terminals, welfare buildings, neighborhood centers and similar recreational facilities, banks, exchanges and other financial institutions, extended care facilities, libraries, medical schools, medical office facilities and clinics, mental institutions, mortuaries, public health centers, religions facilities, research facilities, central utilities plants, water supply and distribution plants, sewage treatment and underground systems, electrical sub-station and primary and secondary distribution systems. * Simple, prefabricated-pre-engineered, minimum types shall be classified under Classification B. Type D: Projects of specialized character requiring a high degree of skill in design, containing large amounts of complex scientific mechanical and electrical equipment, such as aquariums, auditoriums, airport control towers, art galleries, breweries, college buildings with special facilities, commun...
PERCENTAGE OF CONSTRUCTION COST. 6.2.1 When the Project fee is based on a percentage of construction cost, the basic project shall be classified as one (1) of six (6) types. Only the Owner shall be responsible for deciding in which classification the Project falls as indicated in Subparagraph 1.2.2. The project classifications are: Type A (Cx): Projects of ordinary complexity for which commissioning will be limited to mechanical, controls, electrical, life safety and conveying systems. Type B (Cx): Projects of moderate complexity for which commissioning will be limited to mechanical, controls, electrical, life safety and conveying systems. Projects of this type include one or more non-standard system to be commissioned or include one standard system of higher than ordinary complexity. Type C (Cx): Projects of high complexity for which commissioning will be limited to mechanical, controls, electrical, life safety and conveying systems. Projects of this type include multiple non-standard systems to be commissioned or include several systems of high complexity. Type D (Cx): Projects of ordinary complexity for which commissioning will be “total building type” including mechanical, controls, electrical, life safety and conveying systems as well as building envelope. Type E (Cx): Projects of moderate complexity for which commissioning will be “total building type” including mechanical, controls, electrical, life safety and conveying systems as well as building envelope. Projects of this type include one or more non-standard system to be commissioned or include one standard system of higher than ordinary complexity. Type F (Cx): Projects of high complexity for which commissioning will be “total building type” including mechanical, controls, electrical, life safety and conveying systems as well as building envelope. Projects of this type include multiple non- standard systems to be commissioned or include several systems of high complexity.
PERCENTAGE OF CONSTRUCTION COST. This is a percentage fee based on the Total Authorized Design Value of a project said percentage being hereinafter called the "Base Fee," as mutually agreed upon in writing by the City and the Consultant and stated in a Work Order or Notice to Proceed Fee Computation: The Total Authorized Design Value shall be used and identified in the Work Order as the basis for establishing the compensatory fee for all phases identified as part of Basic Services. If the actual construction cost is increased during the construction phase, the "Actual Construction Cost" shall be used as the basis for determining the fee for Construction Administration Phase if included in Basic Services. The term "Actual Construction Cost" does not include any compensation to the Consultant, the cost of the land, rights-of-way, works of art, permit fees or other costs which are the responsibility of the City.
PERCENTAGE OF CONSTRUCTION COST. 6.2.1 When the Project fee is based on a percentage of construction cost, the basic project shall be classified as one (1) of six (6) types. Only the Owner shall be responsible for deciding in which classification the Project falls as indicated in Subparagraph
PERCENTAGE OF CONSTRUCTION COST n/a 3/26/2020 Page 2 of 3 LABORATORY TESTING PROGRAM DETAIL Project Name Foresthill Road Xxxxxxxx Wall Stabilization Caltrans Certified Materials Testing Services Geocon Proposal No. LS-20-85 Fed Aid Proj. No. STPL-5919(139) Embankment, Subgrade Soil, Structure Backfill, Class 2 AB Test Material Tested Test Name Test Frequency Number of Tests Unit Cost Total CT 216 Subgrade Soil Cal Impact Curve As needed, per Test Procedur 6 $225 $1,350 ASTM D 1557 3/4" Class 2 AB Compaction Curve As needed, per Test Procedur 4 $225 $900 CAL 202 3/4" Class 2 AB Gradation Per QAP 1 $115 $115 CAL 301 3/4" Class 2 AB R-Value Per QAP 1 $300 $300 CAL 217 3/4" Class 2 AB Sand Equivalent Per QAP 1 $100 $100 CAL 229 3/4" Class 2 AB Durability Index Per QAP 1 $290 $290 Subtotal $3,055 Hot Mix Asphalt (HMA) 3/4" Type A - 1,360 Tons Test Material Tested Test Name Test Frequency Number of Tests Unit Cost Total CT 202 HMA (Field Sample) Extraction/Gradation 1 each 1,000 tons 2 $215 $430 CT 382 Aggregate + Oil Ignition Oven Calibration 1 per Mix or Project 1 $530 $530 CT 382 HMA (Field Sample) Oil Content 1 each 1,000 tons 2 $215 $430 CT 366 HMA (Field Sample) Stabilometer 1 each day HMA paving 2 $300 $600 CT 367,304 HMA (Field Sample) XXXXX, Air Voids Content 1 per Mix or Project 1 $600 $600 CT 309 HMA (Field Sample) Theo. Max. Density (Rice) 1 each day HMA paving 2 $175 $350 CT 202 HMA Aggregate Gradation (Combined) 1 set of 4 per Mix or Project 4 $115 $460 CT 211 HMA Aggregate Los Angeles Rattler (100, 500 rev 1 per Mix or Project 1 $260 $260 CT 205 HMA Aggregate % Crushed Particles (Coarse) 1 per Mix or Project 1 $190 $190 CT 205 HMA Aggregate % Crushed Particles (Fine) 1 per Mix or Project 1 $190 $190 CT 234 HMA Aggregate Fine Aggregate Angularity 1 per Mix or Project 1 $220 $220 CT 235 HMA Aggregate Flat/Elongated Particles 1 per Mix or Project 1 $230 $230 CT 229 HMA Aggregate Durability Index 1 per Mix or Project 1 $290 $290 CT 217 HMA Aggregate Sand Equivalent 1 per 1000 tons 2 $100 $200 LP-2 HMA (Field Sample) VMA - Calculation 1 per Project 1 $75 $75 LP-3 HMA (Field Sample) VFA - Calculation 1 per Project 1 $75 $75 LP-3 HMA (Field Sample) Dust Proportion - Calculation 1 per Project 1 $75 $75 Subtotal $5,205 FORM 10-H1 Local Assistance Procedures Manual Cost Proposal Cost Proposal Date: 27-Mar-20 Project Name: Placer County Foresthill Xxxxxxxx Project No.: Consultant: Contract Administrative Services, Inc, Hours Actual Hourly Rate Total 130 @ $53.00 * $6,890.00 @ $0.00 @ $0.00...
PERCENTAGE OF CONSTRUCTION COST 
AutoNDA by SimpleDocs

Related to PERCENTAGE OF CONSTRUCTION COST

  • ICIF Construction The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider and Transmission Owner “as-built” drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer’s step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. Interconnection Customer shall provide Transmission Provider and Transmission Owner with Interconnection Customer’s specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • Commencement of Construction Construction of the Project will start within thirty (30) days after notification to the Developer by the Owner, or as soon thereafter as weather and ground conditions permit.

  • Early Construction of Base Case Facilities Developer may request Connecting Transmission Owner to construct, and Connecting Transmission Owner shall construct, subject to a binding cost allocation agreement reached in accordance with Attachment S to the ISO OATT, including Section 25.8.7 thereof, using Reasonable Efforts to accommodate Developer’s In-Service Date, all or any portion of any System Upgrade Facilities or System Deliverability Upgrades required for Developer to be interconnected to the New York State Transmission System which are included in the Base Case of the Class Year Study for the Developer, and which also are required to be constructed for another Developer, but where such construction is not scheduled to be completed in time to achieve Developer’s In-Service Date.

Time is Money Join Law Insider Premium to draft better contracts faster.