Energy metering.  Bi-directional metering is / is not required as the Generator may / is not sanctioned for export.  Metering shall be fully commissioned and in service prior to the generating plant operation. Fault level management  The Generator contributes to fault levels at the connection point and shall take the ultimate responsibility for managing the fault levels within the electrical installation including the impact the fault level contribution from the generating plant has on the assets co-located on the same site that are owned by other network users.  UE must be responsible for managing all fault levels on the distribution system other than the connection point.  UE must provide the fault level contribution from the distribution system at the connection point when requested to assist with managing the fault levels within the electrical installation.  The Generator shall provide the fault level contribution from the generating plant at the connection point when requested to assist with managing fault levels within the distribution system. Compliance with the network modelling and protection scheme assessment report  The Generator must operate and comply with the assessment of the protection and control systems contained within the report undertaken by UE titled “ To be named ” - Network modelling and protection scheme assessment”. The report is dated “00/00/0000’ Power Quality  The Generator must meet the UE automatic connection standards which encompass the Distribution Code and the National Electricity Rules.  If any breach of these standards is suspected, UE may install monitoring equipment (and charge the Generator at the Standard Rates for the work involved in installing and operating such monitoring equipment). If this monitoring equipment reveals a breach, the Generator will be required to rectify this breach and pay UE at the Standard Rates for the work undertaken by UE to investigate and supervise resolution of the problem. Other requirements  [The generating plant is non-compliant with the current AS4777 inverter standard (above 30kVA capacity limitation). The generating plant is a negotiated provision based on the proponent submitted supporting documents. UE may by notice to the Generator vary the standards with which the generating plant must comply to reflect changes in Electricity Law and accepted industry practice. This paragraph included where plant is “non- standard”]  Any subsequent generating plant system capacity increase, equipmen...
AutoNDA by SimpleDocs
Energy metering. The output of the Renewable Energy Projects will be measured by revenue grade production meters in addition to load metering, inverter monitoring, and sub-combiner monitoring meters installed by the Service Provider in accordance with industry standards. Service Provider shall conduct tests of the Meters at such times as it deems appropriate in accordance with industry standards, but not less than once in any two year period. Service Provider shall promptly repair all Meter failures or defects. Should a Meter ever be deemed to reflect inaccuracies in measurement, the Service Provider shall make corresponding adjustments to the records of the amount of Electricity being provided by the Renewable Energy Project delivered based on the period in between the date of the discovery of the inaccuracy and the last testing date of the Meter. Should the Meter ever become non-operational, but Electricity is still being provided by Service Provider to Customer hereunder, then the Parties hereto shall endeavor in good faith to address the Meter failure based upon, among other things, historical and cyclical consumption. To the extent that the Parties hereto are unable to adjust the inaccuracy, then they shall appoint their respective engineers or an independent meter consultant who, along with a third party independent engineer chosen by the Parties' engineers, shall review, examine, mediate and arbitrate the Meter adjustment. The decision of the engineers shall be final, and shall be reduced to the form of an invoice adjustment to be delivered by Service Provider to Customer. Notwithstanding the existence of any inaccuracy, or the allegation or belief of the existence of an erroneous Meter reading, Customer shall at all times pay all invoices in accordance with those time periods set forth herein, with the understanding that adjustments shall be reflected on subsequent invoices. Customer shall have no right to withhold invoice payment due to the actual or alleged existence of Meter inaccuracy except in the case when the current invoice varies by thirty percent (30%) or greater compared with historic like month data.
Energy metering. Metering boxes are stipulated in the premises of MDS (main distributing switchboards), where energy meters are installed. Electronic counters of active and reactive energy with digital outputs are installed on the inputs of MDS. Separate energy metering is stipulated for all water distributing units.

Related to Energy metering

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Electric If Customer has selected an Electricity Fixed Rate on the Application, Customer’s Price will be based on the Fixed Rate(s) which includes Local and State taxes, Gross Receipts Tax (GRT), PJM Adjustment (defined below) charges and adjustments and Utility applied charges and/or fees related to generation, plus the Administration Charge, which includes, Electricity Balancing Amount and third party utility and billing charges. Customer understands and agrees that included in the Administration Charge is the cost of the Energy Balancing Amount (defined below). Customer understands that in order for RITERATE ENERGY to be able to supply Energy to its existing and prospective customers, RITERATE ENERGY enters into supply arrangements to meet the forecasted consumption of its various groups of customers. These forecasts are based on historical data, load shapes and/or estimates. To the extent that actual pooled consumption of RITERATE ENERGY’s Energy customers varies from supply arrangements and/or Customer’s Utility delivery requirements, RITERATE ENERGY incurs a cost in balancing and settling its supply arrangements with such pooled consumption. To ensure a fixed all-inclusive Rate, RITERATE ENERGY has included in the Administration charge, the Energy Balancing Amount, to balance and settle the variance between pooled consumption and supply arrangements (the “Energy Balancing Amount”). In respect of Electricity, Customer understands that there are certain estimated pass through costs, made up of charges to RITERATE ENERGY by the PJM Interconnection (“PJM”) and/or Customer’s Utility, including but not limited to ancillary service charges, the cost of unaccounted for electricity, capacity charges and any replacement or recharacterization of these charges. In this regard, the “PJM Adjustment”, is included in the Fixed Price Rate. Customer acknowledges and agrees that by entering into this Agreement, Customer will not be eligible to receive any net metering credits and other incentives to which Customer would otherwise be entitled. Further, included in the Rate are the amounts charged or billed to RITERATE ENERGY or Customer by Customer’s Utility, the PUC or any other regulatory or government entity, including any taxes, delivery, regulated transmission, regulated distribution, pipeline, compressor fuel, uplift, congestion, locational marginal pricing, invoice market participant, service, billing, or similar or related changes and any, deposits, interest or late payment fees or other amounts in connection with the supply and delivery of Energy to the Premises (collectively, “Regulatory Charges”). Customer agrees to pay the monthly Administration charge for Energy supply (the “Administration” charge).

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from CBB to Verizon, CBB, at CBB’s own expense, shall:

  • Points of Interconnection and Trunk Types 2.1 Point(s) of Interconnection.

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Interconnection Service Interconnection Service allows the Interconnection Customer to connect the Large Generating Facility to the Participating TO’s Transmission System and be eligible to deliver the Large Generating Facility’s output using the available capacity of the CAISO Controlled Grid. To the extent the Interconnection Customer wants to receive Interconnection Service, the Participating TO shall construct facilities identified in Appendices A and C that the Participating TO is responsible to construct. Interconnection Service does not necessarily provide the Interconnection Customer with the capability to physically deliver the output of its Large Generating Facility to any particular load on the CAISO Controlled Grid without incurring congestion costs. In the event of transmission constraints on the CAISO Controlled Grid, the Interconnection Customer's Large Generating Facility shall be subject to the applicable congestion management procedures in the CAISO Tariff in the same manner as all other resources.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Fuel 28.1 The Vehicle must be returned with the amount of fuel equal to that at the time of the commencement of the rental. If the Vehicle is returned with less fuel, the difference will be charged to You at a rate of $5.00 including GST per litre (which includes a service component).

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and ICG, ICG shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks, and the Entrance Facility on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.