Meter Failure. Should the metering equipment at any time fail to register proper amounts or should the registration thereof be so erratic as to be meaningless, the capacity and energy delivered shall be determined by the Cooperative from the best information available.
Meter Failure. If at any time any Metering Equipment ceases to function or is found to be outside the prescribed limits of accuracy referred to in paragraph 7.3.1 of Schedule 21 for whatever reason then, except in the circumstances referred to in Clause 60.10.2:-
Meter Failure. If the Meter fails to register for a period of fourteen (14) or fewer days , the amount of wastewater furnished during such a period shall be deemed to be the amount of wastewater delivered in the corresponding period immediately prior to the failure. If the Meter fails to register for a period greater than 14 calendar days, the amount of wastewater furnished after the initial 14-day period shall be billed an amount for a volume equal to the rated capacity of the wastewater pump(s), multiplied by the total time pumped. If the replacement of the meter is deemed necessary by Sanford, Pittsboro shall replace the Meter at its expense.
Meter Failure. Should the recording meter installed pursuant to
Section 11.1 hereof fail to register during any period of time, the NET ELECTRIC OUTPUT purchased by PECO ENERGY during such period shall be estimated by PECO ENERGY . SELLER shall cooperate in making such estimates by providing to PECO ENERGY , upon PECO ENERGY 's request, registration data from any recording meter maintained by SELLER at the PROJECT SITE or other relevant data.
Meter Failure. If any meter listed in’Exhibit A fails to register, or if any meter registers an error greater than prescribed in Section- 6(b), the Party owning such inaccurate meter shall use commercially responsible efforts to immediately repair or replace it.
Meter Failure. In the case of the failure of any measurement meter of a Plant with multiple Gas suppliers, the residue stream attributable to Equity Gas production shall be determined and allotted to Producers according to the provisions of either the applicable agreement controlling the construction and operation of the Plant involved or according to related agreements executed between the owners of the Plant and the owners of any Upstream Pipeline.
Meter Failure. In case any meter shall stop or for any reason fail to register properly, or upon failure to read any meter, the superintendent may estimate the monthly bill on the basis of the average monthly qu antity consumed during the past six (6) months. (1980 Code, § 13-305)
Meter Failure. 60.10.1 if at any time any Metering Equipment ceases to function or is found to be outside the prescribed limits of accuracy referred to in paragraph 7.3.1 of Schedule 21 for whatever reason then, except in those circumstances referred to in Clause 60.10.2:
(a) in the case of Metering Equipment ceasing to function, during the period from the date of such cessation; or
(b) in any other case, during the period from the time when such inaccuracy first occurred or, if such time is unknown, from the midnight preceding the day during which the disputed reading occurred.
Meter Failure. Should any Metering Equipment fail to register during any period of time, the amount of Thermal Energy or electricity delivered or consumed, as the case may be during such period, will be estimated based on the amounts previously delivered or consumed, as the case may be, during similar periods under substantial similar conditions, unless meter readings are available from other meters at the Site.