Plant Systems Sample Clauses
The 'Plant Systems' clause defines the requirements and standards for the design, installation, and operation of systems and equipment within a facility or plant. It typically outlines the types of systems covered, such as electrical, mechanical, or process systems, and may specify performance criteria, compliance with regulations, and responsibilities for maintenance. By clearly delineating these expectations, the clause ensures that all plant systems are safe, efficient, and meet the necessary operational standards, thereby reducing the risk of system failures and ensuring regulatory compliance.
Plant Systems. The Existing Facility currently has the following plant systems (each an “Existing Plant System”):
1. OPS-SPLNG-8120-PSP_LNG Storage Tanks
Plant Systems. The Existing Facility currently has the following plant systems (each an “Existing Plant System”):
Plant Systems. The plant systems for the Liquefaction Facility are referred to herein as the “New Plant Systems.” Thirty-four (34) potential New Plant Systems have been identified for possible development, depending on final design of the Liquefaction Facility:
1. OPS-CCL-8120-PSP_LNG Storage Tanks
2. OPS-CCL-8130-PSP_LNG In-tank Pumps
3. OPS-CCL-8140-PSP_LNG Circulation System
Plant Systems. The Existing Facility currently has the following plant systems (each an “Existing Plant System”):
1. OPS-SPLNG-8120-PSP_LNG Storage Tanks
2. OPS-SPLNG-8130-PSP_LNG In-tank Pumps
3. OPS-SPLNG-8140-PSP_LNG Circulation System
4. OPS-SPLNG-8150-PSP_Vapor System
5. OPS-SPLNG-8160-PSP_Ship Unloading
6. OPS-SPLNG-8170-PSP_Vapor Return Blowers
7. OPS-SPLNG-8180-PSP_BOG Compressors
8. OPS-SPLNG-8190-PSP_BOG Recondensers
9. OPS-SPLNG-8200-PSP_Vent and LNG Recovery Systems
10. OPS-SPLNG-8210-PSP_Fuel Gas System
11. OPS-SPLNG-8220-PSP_High Pressure Sendout Pumps
12. OPS-SPLNG-8230-PSP_Submerged Combustion Vaporizers
13. OPS-SPLNG-8240-PSP_Natural Gas Sendout
14. OPS-SPLNG-8250-PSP_Distributed Control System
15. OPS-SPLNG-8260-PSP_Pipeline Compressor
16. OPS-SPLNG-8270-PSP_Ambient Air Vaporizers
17. OPS-SPLNG-8310-PSU_Power Generation
18. OPS-SPLNG-8320-PSU_Standby Diesel Generator-UPS
19. OPS-SPLNG-8330-PSU_Air Compression and Distribution
20. OPS-SPLNG-8340-PSU_Nitrogen System
Plant Systems. The plant systems for the Liquefaction Facility are referred to herein as the “Plant Systems.” Twenty one (21) potential Plant Systems have been identified for possible development, depending on final design of the Liquefaction Facility:
1. Inlet Gas Recieving (Unit 11)
2. Acid Gas Removal/ Amine Regeneration/H2S Removal/Thermal Oxidizer (Unit 12)
3. Dehydration and Mercury Removal (Unit 13)
4. Heavy Hydrocarbon Removal (Unit 57)
5. Liquefaction/MR Compressor (Unit 54)
6. Condensate Stabilization (Unit 18)
7. Flares/Blowdown (Unit 19)
8. Refrigerant Storage (Unit 20)
9. Condensate Storage and Loading (Unit 23)