Pipelines Sample Clauses

Pipelines. Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.
Pipelines. The down payment will be deducted from the calculation of the total payment. The balance of the consideration due, if any, will be paid within thirty (30) days of the completion of a final survey of the pipelines as installed. In the event it is necessary to place an additional line or lines, not to exceed four (4) lines, in a new lateral Right of Way, then Grantee agrees to pay Owner $ per rod for the placement of each additional pipeline that is placed in the lateral Right of Way. Grantee agrees to pay, in addition to the aforementioned payment, either (i) One Thousand Dollars and no/100 ($1,000.00) per mile, or (ii) the established yield as determined by the Farm Service Agency office per mile of growing or planted crops, or hay land, where applicable, within the right of way under the ROW Agreement which were destroyed as a direct result of the initial construction and installation of the Facilities. If said Grantor owns less interest in the above described land than the entire and undivided fee simple estate therein, then the payments herein provided for shall be paid the said Grantor only in the proportion which Grantor’s interest bears to the whole and undivided fee. It is expressly understood and agreed that the above specified payment for the ROW Agreement is contingent upon construction. SPECIFIC TERMS IN THIS EXHIBIT HAVE BEEN REDACTED BECAUSE CONFIDENTIAL TREATMENT FOR THOSE TERMS HAS BEEN GRANTED. THE REDACTED MATERIAL HAS BEEN SEPARATELY FILED WITH THE SECURITIES AND EXCHANGE COMMISSION, AND THE TERMS HAVE BEEN MARKED AT THE APPROPRIATE PLACE WITH BRACKETS AND THREE ASTERISKS [***] Owner: Grantee: Oasis Midstream Services LLC Name: Title: Oasis Midstream Partners LP Name: Title: SPECIFIC TERMS IN THIS EXHIBIT HAVE BEEN REDACTED BECAUSE CONFIDENTIAL TREATMENT FOR THOSE TERMS HAS BEEN GRANTED. THE REDACTED MATERIAL HAS BEEN SEPARATELY FILED WITH THE SECURITIES AND EXCHANGE COMMISSION, AND THE TERMS HAVE BEEN MARKED AT THE APPROPRIATE PLACE WITH BRACKETS AND THREE ASTERISKS [***] EXHIBIT D FORM OF MEMORANDUM OF AGREEMENT MEMORANDUM OF AGREEMENT This MEMORANDUM OF PRODUCED AND FLOWBACK WATER GATHERING AND DISPOSAL AGREEMENT (this “Memorandum”) is entered into effective [ ], 2017 (the “Effective Date”), by and among OASIS PETROLEUM NORTH AMERICA LLC (“Producer”), with an address of 1001 Fannin, Suite 1500 Houston TX 77002, OASIS MIDSTREAM SERVICES LLC (“OMS”), with an address of 1001 Fannin, Suite 1500 Houston TX 77002, and OASIS MIDSTREAM PARTNER...
Pipelines. Quantities delivered into or out of pipelines shall be measured by pipeline meters if available. Tank Truck/Cars: Quantities delivered into or out of tank trucks/cars shall be based on meters or shore tanks or scales located at or near the delivery point. Seller shall permit Buyer to review and copy relevant meter proving records and witness proving tests as requested. Samples of Product transferred hereunder shall be retained for ninety (90) days.
Pipelines. The pipelines listed on Exhibit “A” to this Schedule 2.1 (the “Pipelines”).
Pipelines. Safely operates Driox transfer pumps, fills 02 and N2 TS tanks. Understands pipeline pressure control scheme. Understands significance of customer supply. Hot Water System Understands boiler operation and can troubleshoot basic system problems. Understands water treatment system including theory and can maintain within limits. Miscellaneous Understands operation and maintenance of all above equipment so as to be able to recognize problems, and perform emergency repairs as required. Assigned housekeeping area is kept up to date. Is familiar with the Stores/Inventory system. Can understand all plant P & ID drawings and has an understanding of the FIX32 OIU and the different process controls. Level 2 - Successful completion of Praxair Operating Training Manual Modules 6, 9, 10, 11, 12 and 13. BLOC's/BOC’s Understands design and layout. Can safely start up and place them on line without purity upset. Can run in on nitrogen per procedure. Is completely knowledgeable on all compressor indications and their significance to the machine. Variances from normal are noted and acted upon. Has complete knowledge of all oil and cooling systems. Understands ROCPASS theory and can perform normal manipulation of same. BLNC's Understands design and layout. Can safely start up and place on line without purity upset. Is completely knowledgeable on all compressor indications and their significance to the machine. Variances from normal are noted and acted upon. Has complete knowledge of all oil and cooling systems. TURBINE/GENERATORS Understands design and layout. Can safely start up and place on line. Is completely knowledgeable on all turbine and generator indications and their significance to the machine. Variances from normal are noted and acted upon. Has complete knowledge of all oil and cooling systems. WARM END AIR Understands ASFH operation including filter changes and PP bed system Understands PHX operation, significance of midpoint control, balancing scheme, streams through the PHX, can troubleshoot problems and understands operation of the pre-purifiers. COOLING WATER Understands system including pump and fan switching, and can troubleshoot. Understands water treatment system and its theory, performs tests and reports problems. CHILLED WATER SYSTEM Understands the theory and operation including the starting, stopping and adjusting for optimization. MISCELLANEOUS Understands fire water system. Understands water systems and supplies. Understands effluent systems. Unders...
Pipelines. 18.01 Lessee shall refill to contour all ditches or other excavations caused by the construction, operation, and maintenance, or removal of pipelines; construct cross ditches; lime, fertilize, and seed or replant the right-of-way; keep the pipeline and right-of-way in good repair and appearance, and take such other measures as may be deemed necessary by Department to control erosion and sedimentation and to maintain or restore the natural and aesthetic values as directed by Department.
Pipelines. If a transportation pipeline, including a pipeline for the transportation of natural gas, natural gas liquids, synthetic gas, liquefied petroleum gas, petroleum or a petroleum product or hazardous substance, is located on or within the Real Property, Seller shall give Buyer statutory notice regarding such pipeline(s) as required by Section 5.010 of the Texas Property Code.
Pipelines. An undivided 50% interest in the portion of that 8-inch petroleum product pipeline generally known as Line 88 that runs from the intersection of Sepulveda Boulevard and Figueroa Street, in the City of Los Angeles, to Los Angeles International Airport (the other 50% interest being owned by Phillips 66 Company) further described as follows: Line # Section From To Product Line Size (Nominal Diameter) Length (Feet) Miles Liq. Line Fill Status 88 088C Phillips 66 Conn. @ Sepulveda & Figueroa – Vault #109 V-2634 LA International Airport (LAX Fuels) Vault #112 (V-0477) Product 8 89,896 17.03 5562.4 Active
Pipelines. 33.1 The GOVERNMENT shall obtain any required Permits for the transportation of Petroleum in the Kurdistan Region and in Iraq, as well as any necessary Permits and easement rights for the construction of any pipelines and related facilities required for the Petroleum Operations, as provided in Article 33.2.