Quality of Materials Sample Clauses

Quality of Materials. In order to establish standards of quality, the Engineer has, in the detailed specifications, referred to certain products by name and catalog number. This procedure is not to be construed as eliminating from competition other products of equal or better quality by other manufacturers where fully suitable in design.
AutoNDA by SimpleDocs
Quality of Materials. In the absence of detailed Specifications, all Materials and Equipment shall conform to the latest standards of the American Society for Testing Materials available at the time notice inviting Contractors to Bid is published (the Advertisement For Bids) unless otherwise indicated.
Quality of Materials andworkmanship The Contractor shall ensure that the Construction, Materials and workmanship are in accordance with the requirements specified in this Agreement, Specifications and Standards and Good Industry Practice. 11.2 Quality controlsystem (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or“QAP”). (ii) The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority’s Engineer its Quality Assurance Plan which shall include thefollowing: (a) organisation, duties and responsibilities, procedures, inspections and documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice;and (c) internal quality auditsystem. The Authority’s Engineer shall convey its approval to the Contractor within a period of21(twenty-one)daysofreceiptoftheQAPstatingthemodifications, if any,required, and the Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause11.2. (iii) The Contractor shall procure all documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets and workmanship in accordance with the Quality AssurancePlan. (iv) The cost of testing of Construction, Materials and workmanship under this Article 11 shall be borne by theContractor. 11.3 Methodology The Contractor shall, at least 15 (fifteen) days prior to the commencement of the construction, submit to the Authority’s Engineer for review and consent the Contract AgreementPage 74 of 154 “Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Xxxxxxxxx Pt.-I Village in the State of Assam on EPC Mode under Xxxxxxxxxx Xxxxxxxxxx in Economic Corridors (Project Length – 11.8 km)” (4th Call) Mar 2023
Quality of Materials. It is the intent of these specifications that first class materials shall be used throughout the work, . and that they shall be incorporated in such a manner as to produce completed construction which is workmanlike and acceptable to the Superintending Engineer in every detail. Only materials which conform to the requirements of these specification shall be furnished or incorporated in the work. The contract shall upon the request of the Superintending Engineer furnish him with the vouchers to prove that the materials are such as specified. Samples of materials with test certificate have to be furnished at the contractors expenses for the approval of the SE. I E.E. prior to the execution of any work.
Quality of Materials. The Construction Manager shall furnish goods, products, materials, equipment and systems which:
Quality of Materials. Contractor warrants that all materials used in the construction of the Project shall be new or repaired as indicated and all workmanship and materials used in the construction of the Project shall be of good quality, free from faults and defects and, in conformity with the Contract documents unless otherwise specified in the Contract. All Work not conforming to these standards shall be considered defective.
Quality of Materials. The General Contractor shall furnish goods, products, materials, equipment and systems which:
AutoNDA by SimpleDocs
Quality of Materials. SSA Orangewood Children & Family Center Facilities Manager may require Contractor to furnish data and/or samples of chemicals or cleaning agents that Contractor is using or intends to use on the premises. SSA Orangewood Children & Family Center Facilities Manager, at its sole discretion, may prohibit use of any such chemical or cleaning agent and Contractor will be required to provide an alternate chemical or agent that is acceptable.
Quality of Materials. The DB shall furnish goods, products, materials, equipment and systems which:
Quality of Materials. Franchisee shall construct and maintain its System using materials of good and durable quality, and all work involved in the construction, installation, maintenance and repair of the Cable System shall be performed in a safe, thorough and reliable manner.
Time is Money Join Law Insider Premium to draft better contracts faster.