Power Producer’s Obligations Sample Clauses

Power Producer’s Obligations. 4.4.1 The Power Producer undertakes to be responsible, at its own cost and risk, for:
AutoNDA by SimpleDocs
Power Producer’s Obligations. The Power Producer shall be responsible for all income taxes and any and all franchise fees or similar fees assessed against it due to its ownership of the System. The Power Producer shall not be obligated for any taxes payable by or assessed against Purchaser based on or related to Purchasers overall income or revenues.
Power Producer’s Obligations. The Power Producer undertakes to be responsible, at its own cost and risk, for: all approvals including Consents required under local regulations, building codes and approvals required from Discom(s) etc. relating to installation and operation of the Project and generation and supply of solar power from the Project to Procurer and maintain the same in full force and effect during the Term of this PPA and Indian Law, as required and relevant. Power Producer shall update SNA each month on the status of the approvals. In case the Power Producer is facing any difficulties in obtaining any approval it can request SNA for timeline extension for the same. supply to Procurer promptly with copies of each application that it submits to relevant authorities, and copy/ies of each Consent/ license which it obtains. For the avoidance of doubt, it is clarified that the Power Producer shall be solely responsible for maintaining/ renewing any Consents and for fulfilling all conditions specified therein during the Term of the PPA. design, engineering, supply, erection, testing and Commissioning along with Comprehensive Operation & Maintenance of the grid interactive rooftop solar PV Project along with supply of power, with desired level of performance, for a period of twenty five (25) Operational Years of Project in accordance with the applicable Law, the Grid Code and the terms and conditions of this PPA and those prescribed in RFP. providing a timely basis relevant information on Project specifications which may be required for interconnecting Project with the Grid. However, any capital expenses incurred towards grid connection of the Projects shall be borne by Procurer and shall be carried out by Power Producer in accordance with technical requirement of relevant rules, regulations and procedures. save for Force Majeure events, commencing the supply of power for the PPA Capacity to Procurer no later than the SCOD and continuance of the supply of power throughout the Term of PPA. operate and maintain the Project throughout the Term of PPA free and clear of encumbrances, except those expressly permitted under ARTICLE 14:. maintaining its controlling shareholding prevalent at the time of signing of PPA up to a period of one (1) Operational Year after COD in accordance with the RfP. fulfilling all obligations undertaken by the Power Producer under this PPA, read in conjunction with terms and conditions of RFP; upon Termination, it shall be the responsibility of the Power Pro...

Related to Power Producer’s Obligations

  • Developer’s Obligations (a) Upon the expiry of the Agreement Period by efflux of time and in the normal course, the Developer shall on the Expiry Date, hand back vacant and peaceful possession of Project Site and the Project Facilities to the Authority free of cost and in good operable condition.

  • Developer's Obligation The Developer shall bear the total cost and expense of all the obligations and duties created by this Contract unless otherwise explicitly stated in this Contract. Those obligations and duties are, generally, to create all Improvements as may be required by the City in accordance with this Contract and with City Requirements. Such Improvements include but are not limited to: i) all Improvements within the Project; ii) all Improvements connecting to water, sewer, or stormwater infrastructure outside the Project, whether existing or planned; iii) modifications to any existing water, sewer, or stormwater infrastructure outside the Project that facilitate provision of utility service to the Project, or compliance with City Requirements, or integration of the Improvements with the surrounding existing or planned water, sewer, or stormwater system; and iv) new streets or alterations to existing streets or rights of way within which the Improvements are located. The Developer's obligations also include all costs, including but not limited to legal costs, of acquiring all fees or easements within which the Improvements will be located.

  • SUPPLIER’S OBLIGATIONS 6.1 The Supplier undertakes that the Services will be performed substantially in accordance with the Documentation and with reasonable skill and care.

  • USER’S OBLIGATIONS In order to receive the benefits of this Warranty, the End-user must use the Product in a normal way; follow the Product's operation and maintenance manual; and protect against further damage to the Product if there is a covered defect. OTHER LIMITATIONS: Company's obligations under this Warranty are expressly conditioned upon receipt by Company of all payments due to it (including interest charges, if any). During such time as Company has not received payment of any amount due to it for the Product, in accordance with the contract terms under which the Product is sold, Company shall have no obligation under this Warranty. Also during such time, the period of this Warranty shall continue to run and the expiration of this Warranty shall not be extended upon payment of any overdue or unpaid amounts. COSTS NOT RELATED TO WARRANTY: The End-user shall be invoiced for, and shall pay for, all services not expressly provided for by the terms of this Warranty, including without limitation, site calls involving an inspection that determines no corrective maintenance is required. Any costs for replacement equipment, installation, materials, freight charges, travel expenses or labor of Company representatives outside the terms of this Warranty will be borne by the End-user. OBTAINING WARRANTY SERVICE: In the USA, call the Customer Reliability Center 7x24 at 800.356.5737. Outside of the USA, contact your local Xxxxx product sales or service representative for units purchased from those countries, or call the Customer Reliability Center in the USA at 919.845.3683 for units purchased in the USA that were shipped overseas. For comments or questions about this Warranty, write to the Customer Quality Representative, 0000 Xxx Xxxxx Xxxx, Xxxxxxx, Xxxxx Xxxxxxxx 00000 XXX.

  • Customer’s Obligations 8.1 The Customer shall:

  • The Supplier's Obligations The Supplier will in writing, by the time and date specified by the Contracting Body in accordance with paragraph 3.1.3(b) provide the Contracting Body with either:

  • HIRER’S OBLIGATIONS a) The Hirer acknowledges having received the Vehicle in a clean condition, with a full fuel tank and full bottle of gas (if applicable). The Hirer will return the Vehicle in a clean condition with a full fuel tank and a full bottle of gas (if applicable, and subject to any pre-purchase fuel and/or pre- purchase gas option being taken), on the Return Date at the time and at the Return Point set out in the Rental Agreement.

  • Seller’s Obligations At Closing, Seller shall deliver or cause to be delivered to Buyer the following:

  • OWNER’S OBLIGATIONS 5.1 The Owners shall pay all sums due to the Managers punctually in accordance with the terms of this Agreement.

  • Subscriber’s Obligations It is the responsibility of the Subscriber to purchase computer hardware and software and/or make modifications to their existing equipment that are necessary for access to the Database. The Subscriber is responsible for ensuring that unauthorized personnel do not use the Subscriber’s computer. Information accessed from the Database is for the use of the Subscriber.

Time is Money Join Law Insider Premium to draft better contracts faster.