Grid Connection Sample Clauses

Grid Connection. If the Generator specified in the FiT CfD Application that it is, or will be, an Islanded Generator, it shall not make a Grid Connection Application, or otherwise obtain access to a Grid Connection (including by way of a Private Network Use Agreement) other than where it has ceased to have a Route to Market.
AutoNDA by SimpleDocs
Grid Connection. If the Generator specified in the FiT CfD Application that it is, or will be, an Islanded Generator, it shall not make a Grid Connection Application, 22 Drafting note: Clause to be retained if the Facility Generation Technology is Advanced Conversion Technology Anaerobic Digestion Landfill Gas or Sewage Gas. 23 Drafting note: This is to apply where it is specified to apply in Table F of the CfD Standard Terms Notice issued on 25 November 2021 by the Secretary of State for Business, Energy and Industrial Strategy.
Grid Connection. Any termination of Part C: Grid Connection is deemed to terminate this Part.
Grid Connection. The plant will be connected to the grid via the proposed Carriewerloo substation (to be constructed on the site) which connects into the existing 275kV Dxxxxxxxx to Mt Gxxxxx South transmission line (H2H) owned and operated by ElectraNet as a dedicated connection asset to supply Oz Minerals mining facilities.
Grid Connection. This is not a contract to connect the system to the electricity grid or network. (a) Captain Xxxxx will endeavour to obtain an approval to connect the system to the relevant Network Utility prior to installing the system. (b) Failure to make final payment after installation will allow Captain Xxxxx to proceed with engaging third party collection CGS_T&C of Trading_June2021 Page | 2 agencies to assist in collection of outstanding dues (c) In some states only, Captain Xxxxx may include the cost of the Net Bi-directional Meter in the quote. In this case, we will appoint a electrical contractor who is accredited with the Network Utility in your area and charge you the relevant cost associated with installing the Net Bi-directional Meter. This process may take up to 10 business days.
Grid Connection. 15. In case the Grid Connection as defined in art. 17 has not yet been achieved, the Seller shall be obliged to perform the required planning and/or construction obligations according to the Construction Process as defined in this Chapter in order to achieve Grid Connection.
Grid Connection. The Power Producer shall be responsible for synchronization of the Project with licensee’s network under [Insert Name of State] Policy for XXXXXXXXXXXXXX, 20XX as amended from time to time. The Power Producer shall also suggest the Project Group of operation of the system mentioned in above policy and intimate the Nodal Agency; Connectivity of Project with the licensee’s network; Commissioning of the project as applicable. Metering and grid connectivity: Metering and grid connectivity of the Projects would be the responsibility of the Power Producer in accordance with the prevailing guidelines of the concerned distribution licensee and / or CEA and net metering provisions in the state of [insert the name of the State]. Nodal Agency and Procurer may facilitate in the process; however the entire responsibility lies only with the Power Producer. The cost of required meters shall be borne by Successful Bidder. This includes purchase of net meters in case of supply through Category I under [Insert Name of State] Policy for XXXXXXXXXXXXXX, 20XX. In case of Category I and Category III systems, the Power Producer shall install the Generation Meter separately near the output of Inverter of both the Category systems and Net-Meter shall be located in place of present discom’s metering system. Meters and metering equipment shall be tested as per provision of SERC and as per IS 14697 at CPRI or at any NABL accredited lab before installation at site on the cost of power producer and should be properly sealed in the presence of designated authority from [Insert Name of State Nodal Agency] at the time of installation. The accuracy class, current rating and certifications of the net meter and generation meter shall confirm with the standards for net meter and standards for generation meter as provided [Insert Name of State] Policy for XXXXXXXXXXXXXX, 20XX and any subsequent amendment. Insurance: The Power Producer shall also take insurance for third party liability covering loss of human life, engineers and workmen and also covering the risks of damage, theft of material/ equipment/ properties after completion of the work(s). Before commencement of the work, the Power Producer shall ensure that all its employees and representatives are covered by suitable insurance against any damage, loss, injury or death arising out of the execution of the work. Liquidation, Death, Bankruptcy etc., shall be the responsibility of Power Producer. Warranty and guarantees:
AutoNDA by SimpleDocs
Grid Connection. This is not a contract to connect the system to the electricity grid or network.
Grid Connection. Pursuant to the Honorable Commission's Decision dated 17 November 2014 in ERC Case No. 2014-060 RC 1, the National Grid Corporation of the Philippines (NGCP) was authorized to construct the 230 xX Xxxxxx-Matanao Transmission Line in Malita, Davao del Sur. Upon completion of the said Transmission Line, SMCPCwill execute the necessary Service Agreement with NGCP and undertakes to submit the same to the Honorable Commission;
Grid Connection. The producer of the Biogas is connected to the European natural gas network.