Partially Measured Retrofit Isolation Sample Clauses

Partially Measured Retrofit Isolation. Savings are determined by partial field measurement of the energy use of the system(s) to which an ECM was applied; separate from the energy use of the rest of the facility. Measurements may be either short-term or continuous of the error they may introduce. Partial measurement means that some but not all parameter(s) may be stipulated, if the total impact of possible stipulation error(s) is not significant to the resultant savings. Careful review of ECM design and installation will ensure that stipulated values fairly represent the probable actual value. Stipulations should be shown in the M&V Plan along with analysis of the significance of the error they may introduce. Engineering calculations using short- term or continuous post-retrofit measurements and stipulations. Lighting retrofit where power draw is measured periodically. Operating hours of the lights are stipulated.
AutoNDA by SimpleDocs
Partially Measured Retrofit Isolation. Measured Project Benefits are determined by partial field measurement and verification of the energy use of the system(s) to which an Improvement Measure was applied separate from the energy use of the rest of the facility or system(s). Partial measurement means that some but not all parameters will be measured. Careful review of the design and installation of Improvement Measures is intended to demonstrate that the stipulated values fairly represent the probable actual values. Agreed-upon values will be shown in the Performance Contract Agreement. Engineering calculations which include pre-retrofit and post-retrofit measurements and stipulations are used to calculate Measured Project Benefits for the duration of the Guarantee Term. Solar PV Pre-Retrofit:  No pre-retrofit measurements are required. Post-Retrofit:  Utility production sub-meter will be continuously monitored through the FMS. Adjustments will be made based on compliance with the preventative maintenance schedule.  Post-Installation trends of solar insolation and energy output (KWh) will be used in accordance with FEMP M&V Guidelines. Trend data will be used to capture changes in efficiency and performance. City will be notified if it is determined the equipment is not performing as specified or if the trends indicate the Solar PV systems are not operating as intended. Any notifications and resolutions will be included in the annual M&V report. CHANGES IN USE OR CONDITION; ADJUSTMENT TO BASELINE AND/OR ANNUAL PROJECT BENEFITS City agrees to notify Consultant, within fourteen (14) days, of (i) any actual or intended change, whether before or during the Guarantee Term, in the use of any facility, equipment, or Improvement Measure to which this Schedule applies; (ii) any proposed or actual expansions or additions to the premises or any building or facility at the premises; (iii) a change to utility services to all or any portion of the premises; or (iv) any other change or condition arising before or during the Guarantee Term that reasonably could be expected to change the amount of Project Benefits realized under this Attachment. Such a change, expansion, addition, or condition would include, but is not limited to: (a) changes in the primary use of any facility, Improvement Measure, or portion of the premises; (b) changes to the hours of operation of any facility, Improvement Measure, or portion of the premises; (c) changes or modifications to the Improvement Measures or any related equipment...
Partially Measured Retrofit Isolation. Measured Project Benefits are determined by partial field measurement of the energy use of the system(s) to which an ECM was applied separate from the energy use of the rest of the facility. Measurements will be short-term with only one-time measurements before and after the Installation Period. Partial measurement means that some but not all parameters will be measured. Careful review of the design and installation of ECMs is intended to demonstrate that the stipulated values fairly represent the probable actual values. Agreed-upon values will be shown in the measurement and verification plan, along with analysis of the significance of the error they may introduce. Engineering calculations using short-term pre and post-retrofit measurements and stipulations are used to calculate Measured Project Benefits for the duration of the Guarantee Term.
Partially Measured Retrofit Isolation. Careful review of the design and installation of Improvement Measures is intended to demonstrate that the stipulated values fairly represent the probable actual values. Agreed-upon values will be shown in the Performance Contract Agreement. Engineering calculations which include pre-retrofit and post-retrofit measurements and stipulations are used to calculate Measured Project Benefits for the duration of the Guarantee Term. .

Related to Partially Measured Retrofit Isolation

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Abnormally High Tenders 36.4 An abnormally high price is one where the tender price, in combination with other constituent elements of the Tender, appears unreasonably too high to the extent that the Procuring Entity is concerned that it (the Procuring Entity) may not be getting value for money or it may be paying too high a price for the contract compared with market prices or that genuine competition between Tenderers is compromised.

  • CORRECTIVE MEASURE The contractor shall repair any deficiencies in excess of the performance guideline.

  • Building Safety There shall be a Labor/Management Committee concerning the safety of State Buildings. The Committee shall be made up of one representative from each of the following bargaining units: Representing Labor - Administrative Services; Operations, Maintenance and Support Services; Law Enforcement; Professional and Technical Services; Supervisory Services; Institutional Services; and State Police Unit and an equal number of management representatives selected by the Governor. Committee members may participate in the work of the committee during working hours without loss of pay or benefits.

  • Revenue Metering The Connecting Transmission Owner’s revenue metering will be located on the generator side of the 115kV breaker at the Xxxxx Solar Collector Substation and will consist of: • three (3) combination current/voltage transformer (“CT/VT”) units (manufacturer and model ABB/Xxxxxxx KXM-550, GE Grid Solutions KOTEF 000.XX, or other equivalent specified by Connecting Transmission Owner); and • one (1) revenue meter. The ratios of the CTs and VTs will be provided by Connecting Transmission Owner upon its review of the Interconnection Customer’s design documents. (Note: Connecting Transmission Owner’s revenue metering CTs and VTs cannot be used to feed the Interconnection Customer’s check meter.) SERVICE AGREEMENT NO. 2556

  • Community Based Adult Intensive Service (AIS) and Child and Family Intensive Treatment (CFIT) – AIS/CFIT programs offer services primarily based in the home and community for qualifying adults and children with moderate- to-severe mental health conditions. These programs consist at a minimum of ongoing emergency/crisis evaluations, psychiatric assessment, medication evaluation and management, case management, psychiatric nursing services, and individual, group, and family therapy. In a Provider’s Office/In Your Home This plan covers individual psychotherapy, group psychotherapy, and family therapy when rendered by: • Psychiatrists; • Licensed Clinical Psychologists; • Licensed Independent Clinical Social Workers; • Advance Practice Registered Nurses (Clinical Nurse Specialists/Nurse Practitioners- Behavioral Health); • Licensed Mental Health Counselors; and • Licensed Marriage and Family Therapists. Psychological Testing This plan covers psychological testing as a behavioral health benefit when rendered by: • neuropsychologists; • psychologists; or • pediatric neurodevelopmental specialists. This plan covers neuropsychological testing as described in the Tests, Labs and Imaging section.

  • STATEWIDE ACHIEVEMENT TESTING When CONTRACTOR is an NPS, per implementation of Senate Bill 484, CONTRACTOR shall administer all Statewide assessments within the California Assessment of Student Performance and Progress (“CAASP”), Desired Results Developmental Profile (“DRDP”), California Alternative Assessment (“CAA”), achievement and abilities tests (using LEA-authorized assessment instruments), the Fitness Gram with the exception of the English Language Proficiency Assessments for California (“ELPAC”) to be completed by the LEA, and as appropriate to the student, and mandated by XXX xxxxxxxx to LEA and state and federal guidelines. CONTRACTOR is subject to the alternative accountability system developed pursuant to Education Code section 52052, in the same manner as public schools. Each LEA student placed with CONTRACTOR by the LEA shall be tested by qualified staff of CONTRACTOR in accordance with that accountability program. XXX shall provide test administration training to CONTRACTOR’S qualified staff. CONTRACTOR shall attend LEA test training and comply with completion of all coding requirements as required by XXX.

  • Corrective Measures If the Participating Generator fails to meet or maintain the requirements set forth in this Agreement and/or the CAISO Tariff, the CAISO shall be permitted to take any of the measures, contained or referenced in the CAISO Tariff, which the CAISO deems to be necessary to correct the situation.

  • Progressive Discipline The Employer will follow the principles of progressive discipline. Disciplinary action shall be commensurate with the offense. Disciplinary action shall include:

  • Performance Excused The Affected Party, to the extent rendered unable to perform its obligations or part thereof under this Agreement as a consequence of the Force Majeure Event shall be excused from performance of the obligations. Provided that, the excuse from performance shall be of no greater scope and of no longer duration than is reasonably warranted by the Force Majeure Event. Provided further, nothing contained herein shall absolve the Affected Party from any payment obligations accrued prior to the occurrence of the underlying Force Majeure Event.

Time is Money Join Law Insider Premium to draft better contracts faster.