Obtain A Building Approval Sample Clauses

Obtain A Building Approval. Upon receipt of your approval from the Developer, an application can be made to the Local Government Authority or a registered building certifier for assessment to receive approval for building. DRAFT THE DESIGN GUIDELINES Site Planning and Building Location • Homes are sited in accordance with the approved setbacks as per local authority approval. • Only one (1) dwelling is permitted per lot. Front Elevation and Facade • Homes are designed to face the street and deliver a strong street address to primary and secondary streets. • Architectural features such as verandas, porticos, feature windows, façade detailing, roof features and articulated building form are required. • The primary entry is to incorporate a covered roof area of at least 2.5m2 with a minimum depth of 1.5m. • Homes must avoid long blank walls with small windows facing the street. Primary and Secondary Facade Articulation • Walls exceeding 8m in length are to be stepped a minimum of 450mm. Minimum Floor AreaThe home must have a minimum internal floor area of 160m2. • This includes garages and alfresco outdoor living areas (under roof) and excludes verandas and any outbuildings. Height of Buildings • The height must not exceed 8.5m above the natural ground level. • A maximum of 2 storeys is permitted. Minimise Overlooking • Screening must be provided to upper floor windows that overlook windows of adjacent dwellings. Glazing to the Street • Entries must incorporate an element of glazing in the form of a side light, glazing above the door or glazing elements in the door itself. • A minimum of 10% of the façade area (excluding the garage door) facing a street or public area is to be glazed. Design for Slope • Homes should be designed to prevent unsightly earthworks and retaining walls, and be sympathetic to the topography and landscape. • Homes developed on sloping sites should consider suspended floor construction methods which minimise the need for significant earthworks. • Undercroft areas must be suitably screened and designed to minimise viewing from the street and neighbouring properties. • Where earthworks do not permit traditional single plane ‘slab on ground’ construction, homes shall be constructed as ‘Hillside Homes’. Nominated Level Change • Works associated with any building construction shall limit earthworks (e.g. building platforms) to a maximum level change of 400mm to the main dwelling and a maximum of 1.0 metre level change to garages from the finished surface levels app...
AutoNDA by SimpleDocs

Related to Obtain A Building Approval

  • FAA APPROVAL This Agreement may be subject to approval of the FAA. If the FAA disapproves this Agreement, it will become null and void, and both Parties will bear their own expenses relative to this Agreement, up to the date of disapproval.

  • Regulatory Approval 25.1 The Parties understand and agree that this Agreement and any amendment or modification hereto will be filed with the Commission for approval in accordance with Section 252 of the Act and may thereafter be filed with the FCC. The Parties believe in good faith and agree that the services to be provided under this Agreement are in the public interest. Each Party covenants and agrees to fully support approval of this Agreement by the Commission or the FCC under Section 252 of the Act without modification.

  • Landlord Approval (Check one) ☐ Tenant requires Landlord’s written approval to sublet the Premises. In the event that the Original Lease requires the approval of Landlord prior to any subletting of the Premises by Tenant, then the validity of this Sublease is subject to securing the approval of Landlord. Tenant shall supply Subtenant a copy of Landlord’s written approval at least days prior to the start date of the Term. Should Tenant fail to secure approval of this Sublease by Landlord prior such date, this Sublease shall be null and void. Landlord may require information from Subtenant such as a bank statement or may seek to do a background and credit check on Subtenant and, in such case, Subtenant agrees to reasonably cooperate in all such matters. ☐ Tenant does NOT require Landlord’s written approval to sublet the Premises.

  • Application and Approval (a) 1. An employee shall make written application to her Employer on or before January 31st of the year in which the deferment is to commence, requesting permission to participate in the Plan.

  • Regulatory Approvals All Requisite Regulatory Approvals shall have been obtained and shall remain in full force and effect and all statutory waiting periods in respect thereof shall have expired, and no such Requisite Regulatory Approval shall have resulted in the imposition of any Materially Burdensome Regulatory Condition.

  • Application Approval Our representative will notify you (or one of you, if there are co-applicants) of the Application approval, execute the Lease agreements for signature prior to occupancy, and, once complete, credit the application deposit of all applicants toward the required security deposit.

  • NOTICE, APPLICATION, AND APPROVALS 12.1 - Any notice to Lessor or Lessee required by this Lease shall be complete if submitted in writing and transmitted by personal delivery (with signed delivery receipt), or certified or registered mail return receipt request, or by a nationally recognized overnight delivery service. Unless either party notifies the other in writing of a different mailing address, notice to the Lessor and/or Lessee shall be transmitted to:

  • Building Permit As soon as the Final Interior Plans have been approved by Landlord and Tenant, Landlord shall apply for a building permit for the Interior Improvements, and shall diligently prosecute to completion such approval process.

  • Project Approval The County may issue a Job Order Authorization for the Work, to include the firm-fixed-price of the Job Order and the project duration. Contractor agrees that all clauses of this Contract are applicable to any Job Order issued hereunder. The County reserves the right to reject a Contractor’s Quote based on unjustifiable quantities and/or methods, performance periods, inadequate documentation, or other inconsistencies or deficiencies on the Contractor’s part in the sole opinion of the County. The County reserves the right to issue a unilateral Job Order authorization for the Work if a Quote price cannot be mutually agreed upon. This is based upon unjustifiable quantities in the sole opinion of the County. The County also reserves the right to not issue a Job Order Authorization if the County’s requirement is no longer valid or the project is not funded. In these instances, the Contractor has no right of claim to recover Quote expenses. The County may pursue continuing valid requirements by other means where Contract was not reached with the Contractor.

  • Submission and Approval The Contractor’s Submittals must comply with the Contract Documents. The Contractor shall review and approve all Submittals prior to submission. The Contract Documents shall specify when shop drawings or submittals require the seal of a specialty consultant. The Contractor shall submit copies of Submittals as required by the Contract Documents for the Work of the various trades. The Design Professional shall review, approve, or take other appropriate action with respect to shop drawings, samples, or other submissions of the Contractor, including, but not limited to, confirming conformance with the design concept of the Project and with the Contract Documents. The Design Professional shall respond to and return said items to the Contractor within fourteen calendar days from receipt provided that the Submittals are submitted by the Contractor in accordance with the required Submittal schedule. The Design Professional shall review and give comment or approval to Submittal schedule within fourteen calendar days from receipt. Large submittal documents may require longer review times, e.g., submittals with over fifty sheets of drawings. If, because of events beyond its reasonable control, the Design Professional is not able to meet the specified time period, then it is entitled to ask for additional time from the Owner. The Contractor shall make all corrections required by the Design Professional and furnish such corrected copies as may be needed. If the Contractor believes that any corrections required by the Design Professional constitute a change to the contract, the Contractor shall immediately notify the Design Professional and Owner and request instructions. By forwarding the approved Submittals to the Design Professional, the Contractor represents that the Contractor has determined and verified materials, field measurements, and field construction criteria related thereto, or will do so, and has checked and coordinated the information contained within such Submittals with the requirements of the Work and of the Contract Documents. The Design Professional’s approval of Submittals shall not relieve the Contractor from the responsibility for errors of any sort in Submittals or schedules. The Contractor shall perform no portion of the Work for which the Contract Documents require Submittals until the Design Professional has approved the respective Submittal. The Contractor shall maintain at the Site one copy of all approved Submittals.

Time is Money Join Law Insider Premium to draft better contracts faster.