TECHNICAL TASKS Sample Clauses

TECHNICAL TASKS. Products that require a draft version are indicated by marking “(draft and final)” after the product name in the “Products” section of the task/subtask. If “(draft and final)” does not appear after the product name, only a final version of the product is required. Subtask 1.1 (Products) describes the procedure for submitting products to the CAM.
AutoNDA by SimpleDocs
TECHNICAL TASKS. The purpose of this task is successful procurement and installation of all project components identified in this Agreement. Required technology (select one): Solar photovoltaic (PV) Wind turbine Optional additional equipment (select all that apply): Battery Energy Storage Pump replacement (conversion of fossil fuel pump to electric pump) Electric Vehicle Charging Infrastructure
TECHNICAL TASKS. Deliverables that require a draft version are indicated by marking “(draft and final)” after the deliverable name in the “Deliverables” section of the task/subtask. If “(draft and final)” does not appear after the deliverable name, only a final version of the deliverable is required. Subtask
TECHNICAL TASKS. The purpose of this task is successful procurement and installation of all project components identified in this Agreement. Required technology (select one): Solar photovoltaic (PV) Wind turbine Optional additional equipment (select all that apply): Battery Energy Storage Pump replacement (conversion of fossil fuel pump to electric pump) Electric Vehicle Charging Infrastructure System 1 Project Detail Task 1: Diesel to Solar Plus Storage a. Renewable Energy System Description of where equipment will be installed on the property (For example: northeast corner by barn): The diesel conversion is located on the northeast side of parcel 000-000-000. For Solar PV, please identify the surface of installation: Rooftop If so, is the rooftop on an existing building? Yes No Parking lot (can be unpaved). If so, is it an existing parking lot? Yes No Ground-mounted or Floating (Solar Panels mounted on pontoons and floating on irrigation pond). Other: Electricity produced will be used to serve (For example: greenhouse; irrigation pumps; electric vehicle charging): 7.5 HP submersible irrigation pump. Rated Capacity of system: [19.8] kW General Description of Equipment (please include information such as number of arrays or turbines): Two ground-mounted solar arrays configured 2 panels high in portrait will support 56 solar panels and 1 inverter. The footprint of the solar system is 39’ x 48’. Expected Make and Model of Equipment to be Installed (include modules and inverter): Seraphim, SRP-355-6MA-HV (355W) modules; SE20K-USR48NNU 3-PH GRID TIED INVERTER 20KW 480VAC Expected Contractor(s), if known (include CSLB license number): Xxxxxxxx’x Energy, Inc. CSLB # 999665 b. Battery Energy Storage Description of where equipment will be installed on the property and the renewable energy source serving the charger (For example: located with solar system installed at northeast corner by greenhouse): The diesel to solar plus storage system will be located with solar system installed next to the well on the northeast corner of the parcel 000-000-000. Battery will be used for (For example, provide back up for grid outages; to regularly shift or extend hours of use for the installed solar energy system): The battery will be used to provide back-up energy for pumping when the solar system is not producing enough energy for on-demand pumping. For example, when pumping is needed on cloudy days or at night. Expected equipment to be installed: Princeton Power PEMS 30-60 Lithium Ion , 30 kW...
TECHNICAL TASKS. Phase Task Description Start Duration Month (Months) I Development of molecular biology protocols. 1 Nucleic acid probe design. Optimal E. coli and lambda 1 1 nucleic acid sequences will be determined for maximum specificity. 2 Optimization of protocols for labeled nucleotide 2 6 incorporation by polymerize target extension. Labeled oligonucleotides complementary to nucleic acid targets will be synthesized by enzymatic extension reactions. Optimal conditions for fluorescent report synthesis will be determined. 3 Optimization of sample preparation protocols. 8 3 Experiments will be performed to determine the optimal conditions for sample preparation. Various parameters such as buffer composition, extraction procedures, and hybridization conditions will be evaluated. Targets will consist of low levels of E. coli genomic DNA. Effects of interferants usually present in food samples will be evaluated. 4 Demonstration of the detection of specific sequences of 11 2 bacterial contaminants. The detection system currently in operation at LANL will be modified to perform experiments on the detection of specific sequences of bacterial contaminants. Increasingly diluted samples of E. coli genomic DNA will be analyzed. Limits of detection are expected to lie in the femtomolar (10-15 M) range. II Design and construction of a prototype instrument for the 13 detection of low levels of E. coli. 1
TECHNICAL TASKS. 4.1 Air Force Activity will be responsible for the following tasks: - Provide suitable demonstration items for the length of the demonstration - Provide technical data/support for the purpose of developing the necessary database for the demonstration. - Review and acceptance of the design of the system for the length of the demonstration - Procure/make available necessary explosives for the demonstration - Provide personnel and support activities necessary for the length of the demonstration - Agree to and coordinate demonstration execution criteria - Execute the agreed demonstration plans - Prepare an after initiative report
TECHNICAL TASKS. The purpose of this task is successful procurement and installation of all project components identified in this Agreement. Required technology (select one): Solar photovoltaic (PV) Wind turbine Optional additional equipment (select all that apply): Battery Energy Storage Pump replacement (conversion of fossil fuel pump to electric pump) Electric Vehicle Charging Infrastructure System 1 Project Detail a. Renewable Energy System Description of where equipment will be installed on the property (For example: northeast corner by barn): The array will be located on the ground in the storage area between the shop and house at 00000 Xxx 0, Xxxxxx, XX 00000. For Solar PV, please identify the surface of installation: Rooftop If so, is the rooftop on an existing building? Yes No Parking lot (can be unpaved). If so, is it an existing parking lot? Yes No Ground-mounted or Floating (Solar Panels mounted on pontoons and floating on irrigation pond). Other: Electricity produced will be used to power (For example: greenhouse; irrigation pumps; electric vehicle charging): 4 pumps which irrigate the 300 acres of property, 1 shop, and 2 homes Rated Capacity of system: [_244.11_] kW General Description of Equipment (please include information such as number of arrays or turbines): 6 rows of modules stacked 2 high Expected Make and Model of Equipment to be Installed (include modules and inverter): Modules: (618) Sunpower SPR-395-com Inverters: (3) Delta Products Corp M36U-120 Expected Contractor(s), if known (include Contractor State License Board (CSLB) license number): Trinity Construction Enterprises Inc. DBA Trinity Power: CSLB# 853740
AutoNDA by SimpleDocs
TECHNICAL TASKS. Unless otherwise provided in the individual Task, the Contractor shall prepare all deliverables in accordance with the requirements in Task 1.5.
TECHNICAL TASKS. The purpose of this task is successful procurement and installation of all project components identified in this Agreement. Required technology (select one): Solar photovoltaic (PV) Wind turbine Optional additional equipment (select all that apply): Battery Energy Storage Pump replacement (conversion of fossil fuel pump to electric pump) Electric Vehicle Charging Infrastructure System 1 Project Detail a. Renewable Energy System Description of where equipment will be installed on the property (For example: northeast corner by barn): The solar project will be installed on the northeast corner of the 8th Avenue property on APN 002-060- 004 near the transformer, in a field previously used for producing walnuts. For Solar PV, please identify the surface of installation: Rooftop If so, is the rooftop on an existing building? Yes No Parking lot (can be unpaved). If so, is it an existing parking lot? Yes No Ground-mounted or Floating (Solar Panels mounted on pontoons and floating on irrigation pond). Other: Electricity produced will be used to power (For example: greenhouse; irrigation pumps; electric vehicle charging): Irrigation Pumps Rated Capacity of system: [ 32.94 ] kW General Description of Equipment (please include information such as number of arrays or turbines): 1 array consisting of 85 solar panels and 1 inverter Expected Make and Model of Equipment to be Installed (include modules and inverter): Solar Panels: (85) Q Cells ® Q Peak Duo L-G5.3 390 Watt Inverters (1) SMA America STP33-US-41 Expected Contractor(s), if known (include Contractor State License Board (CSLB) license number): Xxxxx Xxxxxxx, Xxxxxxx Construction Inc. CSLB # 533350
TECHNICAL TASKS. The purpose of this task is successful procurement and installation of all project components identified in this Agreement. Required technology (select one): Solar photovoltaic (PV) Wind turbine Optional additional equipment (select all that apply): Battery Energy Storage Pump replacement (conversion of fossil fuel pump to electric pump) Electric Vehicle Charging Infrastructure System 1 Project Detail a. Renewable Energy System Description of where equipment will be installed on the property (For example: northeast corner by barn): South corner of the northeast set of growing rooms. It is located just north of the chiller and cooling tower. The total solar system will cover about 1/4th of the building’s rooftop. The APN is 017-140-003-000. For Solar PV, please identify the surface of installation: Rooftop If so, is the rooftop on an existing building? Yes No Parking lot (can be unpaved). If so, is it an existing parking lot? Yes No Ground-mounted or Floating (Solar Panels mounted on pontoons and floating on irrigation pond). Other: Electricity produced will be used to serve (For example: greenhouse; irrigation pumps; electric vehicle charging): Mushroom growing rooms and supporting grow-room climate control infrastructure (HVAC, Pumps, Compressors, Growing Control Systems, Air Handlers, Etc.) Rated Capacity of system: [125] kW
Time is Money Join Law Insider Premium to draft better contracts faster.