PILOT DEPLOYMENT SITE PREPARATION Sample Clauses

PILOT DEPLOYMENT SITE PREPARATION. The goals of this subtask are to prepare the electrical, mechanical, and physical infrastructure of the pilot deployment site for PT+ operation. The Recipient shall: ● Prepare a Pilot Deployment Site Preparation Plan that includes, but is not limited to: ● Team kickoff meetingElectrical energy integration plan and design schematics; ● Thermal energy integration plan and design schematics; ● PT+ pad preparation plan; ● Schedule of activities ● Carry out preparation activities for the site as described in Pilot Deployment Site Preparation Plan; and ● Prepare Pilot Deployment Site Preparation Report that includes, but is not limited to: ● Team kickoff meeting minutes; ● Photographs and written documentation of electrical and thermal energy integration; ● Photographs and written documentation of PT+ pad preparation; ● Electrical engineer sign-off for electrical system; ● Mechanical engineer sign-off for thermal system; ● Issues, concerns and mitigation plans. Products: ● Pilot Deployment Site Preparation Plan (draft and final) ● Pilot Deployment Site Preparation Report (draft and final)
AutoNDA by SimpleDocs

Related to PILOT DEPLOYMENT SITE PREPARATION

  • Site Preparation Contractor shall not begin a project for which the site has not been prepared, unless Contractor does the preparation work at no cost, or until Region 4 ESC includes the cost of site preparation in a purchase order. Site preparation includes, but is not limited to: moving furniture, installing wiring for networks or power, and similar pre-installation requirements.

  • Surface Preparation Clean the surface to be treated of all dust, dirt, clay, grass, sod and any other deleterious matter before application of the asphalt surface treatment.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Preconstruction Phase Services Preconstruction Phase Services shall mean all services described in Article 3.1, and any similar services described in the Request for Proposals, including such similar services as are described in the Construction Manager at Risk’s Response to the Request for Proposals to the extent they are accepted by Owner, but excluding any Early Work. Early Work shall be considered part of Construction Phase Services.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

Time is Money Join Law Insider Premium to draft better contracts faster.