INTERCONNECT AND NET ENERGY METERING PERMITTING Sample Clauses

INTERCONNECT AND NET ENERGY METERING PERMITTING. The goal of this subtask is to ensure that the pilot deployment site’s obtains a net energy metering (NEM) permit and to set up interconnection facilities. Please note that in accordance with Task 1.8 herein, permit costs and the expenses associated with obtaining permits are not 7 See CPUC D14-12-081 - Decision Implementing Senate Bill 1122, Section 2.2.3 Bioenergy Using Byproducts of Sustainable Forest Management and Appendix B SB 1122 Forest Biomass – Forest Biomass Sustainability Byproduct Eligibility Form: Instructions and Worksheet. xxxx://xxxx.xxxx.xx.xxx/PublishedDocs/Published/G000/M143/K960/143960061.pdf reimbursable under this Agreement. The Recipient shall: ● Oversee the pilot deployment site host’s application for a NEM Permit; ● Prepare a NEM Permit Status Report once the NEM permit has been secured that includes, but is not limited to: ● A copy of the NEM permit ● A mitigation plan for any issues that may arise. ● Prepare an Interconnection Installation Plan that includes, but is not limited to: ● Goals and methods for installation of interconnection equipment; ● Interconnection schematic; ● Contracting of licensed electrical engineer for inspection and sign off; and ● Final interconnection approval and hookup. ● Carry out Interconnection Installation Plan ● Prepare Interconnection Installation Report that includes, but is not limited to: ● Results of interconnection equipment installation; ● Final interconnection schematic; ● Copy of the electrical engineer interconnection report; ● Copy of utility certification of proper interconnection approval and hookup; and ● Issues, concerns and mitigation plans. Products: ● NEM Permit Status Report ● Interconnection Installation Plan (draft and final) ● Interconnection Installation Report (draft and final)
AutoNDA by SimpleDocs
INTERCONNECT AND NET ENERGY METERING PERMITTING. The goal of this subtask is to ensure that the pilot deployment site’s obtain a net energy metering (NEM) permit and to set up interconnection facilities. Please note that in accordance with Task 1.8 herein, permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement. The Recipient shall: ● Oversee the pilot deployment site host’s application for a NEM Permit. ● Prepare a NEM Permit Status Report once the NEM permit has been secured that includes, but is not limited to: ○ A copy of the NEM permit; and ○ A mitigation plan for any issues that may arise. ● Prepare an Interconnection Installation Plan that includes, but is not limited to: ○ Goals and methods for installation of interconnection equipment; ○ Interconnection schematic; ○ Contracting of licensed electrical engineer for inspection and sign off; and ○ Final interconnection approval and hookup. ● Carry out Interconnection Installation Plan. ● Prepare Interconnection Installation Report that includes, but is not limited to: ○ Results of interconnection equipment installation; ○ Final interconnection schematic; ○ Copy of the electrical engineer interconnection report; ○ Copy of utility certification of proper interconnection approval and hookup; and ○ Issues, concerns and mitigation plans. Products: ● NEM Permit Status Report ● Interconnection Installation Plan (draft and final) ● Interconnection Installation Report (draft and final)

Related to INTERCONNECT AND NET ENERGY METERING PERMITTING

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Interconnection Customer Interconnection Facilities Interconnection Customer shall design, procure, construct, install, own and/or control Interconnection Customer Interconnection Facilities described in Appendix A, Interconnection Facilities, Network Upgrades and Distribution Upgrades, at its sole expense.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • SS7 Network Interconnection 9.7.1 SS7 Network Interconnection is the interconnection of Global Connection local signaling transfer point switches or Global Connection local or tandem switching systems with BellSouth signaling transfer point switches. This interconnection provides connectivity that enables the exchange of SS7 messages among BellSouth switching systems and databases, Global Connection local or tandem switching systems, and other third-party switching systems directly connected to the XxxxXxxxx XX0 network.

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

  • Interconnection Point The Service Provider is responsible for connecting to the LFC Network at the Interconnection Point. The LFC may only change an Interconnection Point if a change is necessary to protect the security or integrity of that Interconnection Point in order to maintain the continuity of supply of the Wholesale Services. In the event of any such change:

  • Network Interconnection 26.1 Interconnection between the networks of different SERVICE PROVIDERs shall be as per National Standards of CCS No.7 issued from time to time by Telecom Engineering Centre (TEC) and also subject to technical feasibility and technical integrity of the Networks and shall be within the overall framework of interconnection regulations issued by the TRAI from time to time. However, if situation so arises, INTERCONNECTION with R2MF signaling may be permitted by LICENSOR.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall: