Verification of Dimensions Sample Clauses

Verification of Dimensions. Contractor shall verify all dimensions before laying out and performing any particular portion of the Work and shall be responsible for any errors which might have been avoided thereby. Contractor shall promptly notify Owner of any such errors by using a Request for Information Form (“RFI”). Dimensions of Work as indicated on Drawings are not guaranteed to be as built dimensions. No measurements shall be scaled from Drawings and used as definite dimensions for layout or fitting Work in place. Dimensions for items to be fitted into constructed conditions or improvements at the Project Site shall be taken at the Project Site. Whenever a stock size, manufactured item or piece of equipment is specified by its nominal size or dimensions, Contractor shall be responsible to verify measurements thereof and assure proper incorporation into the Work.
AutoNDA by SimpleDocs
Verification of Dimensions. The Construction Manager shall verify all dimensions before laying out and performing any particular portion of the Work and shall be responsible for any errors, which might have been avoided thereby. Dimensions of Work as indicated on Drawings are not guaranteed to be as built dimensions. No measurements shall be scaled from Drawings and used as definite dimensions for layout or fitting Work in place. Whenever inaccuracies or discrepancies are found, the Construction Manager shall inform the Owner and the Architect and obtain clarification prior to any construction or demolition. Should any dimensions be missing, Construction Manager shall consult with the Owner and the Architect and shall obtain such dimensions prior to execution of the Work. Dimensions for items to be fitted into constructed conditions at the Site will be taken at the Site. Whenever a stock size, manufactured item or piece of equipment is specified by its nominal size, it is the responsibility of the Construction Manager to determine the actual space requirements for setting or entrance to the setting space. No extension of the Completion Date(s) or Milestone Dates or increase in the GMP or Separate GMP, as applicable, will be allowed by reason of Work requiring adjustments in order to accommodate the particular item of equipment.
Verification of Dimensions. The Contractor shall visit the job site to thoroughly familiarize himself with all the details of the work and working conditions. The Contractor shall also verify all dimensions in the field and shall advise the Contracting Officer of any discrepancy before performing any work. The Contractor shall be specifically responsible for the coordination and proper relation of his work to the building, structure, phasing and ensure the safety of employees and workmen.
Verification of Dimensions. The Employer’s drawings include a general arrangement of pipe routes and structural support systems. The Contractor shall verify all dimensions on site and confirm the actual length of pipework and closure pieces prior to fabrication, structural support system dimensions and positions on a case by case basis. b)
Verification of Dimensions. The contractor is required to certify via a certificate of compliance that all dimensions, threads, angles, and finishes comply with drawing or specification requirements. All approved deviation/waivers shall be listed as part of the certificate of compliance.

Related to Verification of Dimensions

  • Verification Bank may, from time to time, verify directly with the respective Account Debtors the validity, amount and other matters relating to the Accounts, either in the name of Borrower or Bank or such other name as Bank may choose.

  • Verifications If Partner acquires Red Hat Products and/or Services directly from Red Hat, during the Term and for at least two (2) years thereafter, Partner will keep and maintain commercially reasonable written records regarding Partner’s use and distribution of the Red Hat Products and Services and business activities related to the Program(s) ("Records"). Red Hat may, at its own expense, verify the Records to determine Partner’s compliance with this Agreement. This verification may take the form of requests for information, documents or records (to which Partner will respond promptly), on-site visits (for which Partner shall grant Red Hat the requisite access), or both. The Parties will act reasonably and cooperate with each other in respect of such verifications. Any on-site visit will occur during regular business hours and will not interfere unreasonably with Partner’s business. For an on-site visit, Red Hat will give Partner at least thirty (30) day’s prior written notice.

  • Response/Compliance with Audit or Inspection Findings A. Grantee must act to ensure its and its Subcontractors’ compliance with all corrections necessary to address any finding of noncompliance with any law, regulation, audit requirement, or generally accepted accounting principle, or any other deficiency identified in any audit, review, or inspection of the Contract and the services and Deliverables provided. Any such correction will be at Grantee’s or its Subcontractor's sole expense. Whether Xxxxxxx's action corrects the noncompliance shall be solely the decision of the System Agency.

  • MEASUREMENT AND VERIFICATION The goal of this task is to report the benefits resulting from this project. Project team may use in- house expertise of the project demonstration site or use third party vendor for measurement and verification (M&V) of GHG and energy consumption reduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration sites • Develop M&V protocol for pre-installation measurement (and calculation): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o Description of the monitoring equipment and instrumentation which will be used. o Description of the key input parameters and output metrics which will be measured. o Description of the M&V protocol and analysis methods to be employed. o Description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified  Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare a CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting #2.

  • Verification Procedure (1) The signature file of each processed file is validated.

  • E-Verification If applicable, Contractor represents and warrants that it will ensure its compliance with the Mississippi Employment Protection Act of 2008, and will register and participate in the status verification system for all newly hired employees. Mississippi Code Annotated §§ 71-11-1 et seq. The term “employee” as used herein means any person that is hired to perform work within the State of Mississippi. As used herein, “status verification system” means the Illegal Immigration Reform and Immigration Responsibility Act of 1996 that is operated by the United States Department of Homeland Security, also known as the E-Verify Program, or any other successor electronic verification system replacing the E-Verify Program. Contractor agrees to maintain records of such compliance. Upon request of the State and after approval of the Social Security Administration or Department of Homeland Security when required, Contractor agrees to provide a copy of each such verification. Contractor further represents and warrants that any person assigned to perform services hereafter meets the employment eligibility requirements of all immigration laws. The breach of this agreement may subject Contractor to the following:

  • How to Update Your Records You agree to promptly update your registration records if your e-mail address or other information changes. You may update your records, such as your e-mail address, by using the Profile page.

  • Inspection and Verification The Secured Parties and such persons as the Secured Parties may reasonably designate shall have the right to inspect the Collateral, all records related thereto (and to make extracts and copies from such records) and the premises upon which any of the Collateral is located, to discuss the Grantor’s affairs with the officers of the Grantor and its independent accountants and to verify under reasonable procedures the validity, amount, quality, quantity, value, condition and status of, or any other matter relating to, the Collateral, including, in the case of collateral in the possession of any third Person, by contacting any account debtor or third Person possessing such Collateral for the purpose of making such a verification. Out-of-pocket expenses in connection with any inspections by representatives of the Secured Parties shall be (a) the obligations of the Grantor with respect to any inspection after the Secured Parties’ demand payment of the Notes or (b) the obligation of the Secured Parties in any other case.

  • Verification of Coverage Prior to beginning any work under this Agreement, Consultant shall furnish City with certificates of insurance and with original endorsements effecting coverage required herein. The certificates and endorsements for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. The City reserves the right to require complete, certified copies of all required insurance policies at any time.

  • Electronic Visit Verification ("EVV Provider shall cooperate with State requirements for electronic visit verification for personal care services and home health services, as applicable.