Examples of Portion of the work in a sentence
The contractor shall take full responsibility for the adequacy and safety of all site operations and methods of construction.SECTION-IIIPART - I AERECTION CONDITIONS OF CONTRACT (ECC)- GENERAL REQUIREMENT 1.0 GENERAL: 1.1 The following shall supplement the conditions already contained in the other parts of the Specification and documents and shall govern the Portion of the work of this Contract to be performed at Site.
Portion of the work covered by each volume (if more than one volume in the set).
The Engineer and his duly authorised representative shall have at all reasonable times access to the contractors premises of works and shall have the power at all reasonable time to inspect drawing of any Portion of the work or examine the materials and workmanship of the plant is being manufactured on other premises, the contractor shall obtain for the Engineer and for his duly authorised representative permission to inspect it as if the plant was manufactured on the contractor’s own premises.
S&T Portion of the work involves design and detailed drawings icluding Bill of Quantities and preparation of Detailed Estimate, Technical Specifications, Signalling Plans, etc.
Portion of the work (XPS measurements, GAATR- FT-IR) was performed at the Joint Center for Artificial Photosynthesis, a DOE Energy Innovation Hub, supported through the Office of Science of the U.S. Department of Energy under Award No. DE-SC0004993.
The Contractor shall keep on the Site and have available for inspection by the Superintendent at any time a log book in which is recorded the following information regarding each placement of concrete: ⚫ Date of placing concrete; ⚫ Portion of the work constructed; ⚫ Specified grade of concrete and source; ⚫ Slump measurements taken; ⚫ Volume of concrete placed; and ⚫ Test cylinders made.
Portion of the work are to be bid as an optional add alternate, and the Owner may or may not choose to execute this work under the contract.
Portion of the work means a part of the work or section of the work.1.20.
Portion of the work falls within specific categories for which a category factor in terms of the fee scales will be applicable when the account amount is determined.
Description and essentiality of the extra work for the project.b. Portion of the work or project and its approximate contract cost where suspension of work may be involved on account of the proposed extra work.