Potholing Sample Clauses

Potholing. 4.1 The Consultant shall excavate sufficient potholes to verify locations and elevations at utility crossings and existing piping to be removed or replaced in the Project. These potholes may be made using small diameter vacuum-type equipment, if appropriate.
AutoNDA by SimpleDocs
Potholing. Desired information outlined below shall be provided in table format to the District upon completion of potholing work.
Potholing. The quantity, location and depth of potholes will be determined during the design phase. The potholing sub-consultant will be immediately contracted for disposal of hazardous soils associated with the 3 borings near the I-8 crossing. The Consultant shall obtain all necessary encroachment permits for subsurface investigations.
Potholing. Upon City written notice, and in accordance with the City’s schedule for a City improvement project, NPG shall determine horizontal and vertical location of its facilities and provide such information to City for City design purposes.
Potholing. It is assumed that potholing will be completed by the Contractor. If potholing is required during design, Xxxx Xxxxxxx will subcontract with a potholing firm to perform the required work.
Potholing. Where surface features cannot be found to confirm actual utility locations, a list of suggested potholing locations will be developed for critical systems. A potholing contractor will then be utilized (Badger) to locate key utilities to determine if relocation is necessary to accommodate infrastructure improvements. Potholing activities will involve vacuum excavating pothole locations to confirm underground utilities per the conceptual drawings. The horizontal and vertical location of the potholed utilities will be surveyed in the field. The results of potholing activities will be incorporated into the utility plans. Potholing at ten locations is assumed for budgetary purposes.
Potholing. Identify location to pothole to confirm existing facility elevations, and document potholes with photos and survey information. Coordinate with the CMGC on requested location and findings.
AutoNDA by SimpleDocs
Potholing. The Xxxxxx-Xxxx team will perform pothole investigations for utilities determined to be in potential conflict with the proposed improvements, up to 5 potholes. A Pothole Data Report identifying the location, depth, material and size of utilities in question will be developed and used for design considerations. Deliverables □ One electronic copy of the final Concept Plan (PDF Format). □ One electronic copy of the Preliminary Engineering Drawings (PDF Format). □ One electronic copy of Roundabout Performance Memorandum (PDF Format) □ One electronic copy of the 30% OPCC. □ One electronic copy of the Kiosk and Gateway Sign Conceptual Design (PDF Format). □ One electronic copy of the Pothole Report (PDF Format) TASK 4: STAKEHOLDER COORDINATION Task 4.1: Public Outreach and Coordination Xxxxxx-Xxxx will facilitate up to three (3) stakeholder meetings with the community and merchant/stakeholder working groups. It is anticipated that parking, fences, schedule, construction operations and construction phasing will be covered as part of these meetings, including other topics as necessary. It is assumed that each meeting will be one (1) hour and require up to two (2) hours of preparation and will have up to two (2) Xxxxxx-Xxxx team members in attendance. Deliverables □ Electronic copy of the meeting minutes (PDF Format). Photo documentation of current site conditions and project milestone (such as workshops, community meetings, presentation to community groups). Assumptions □ City to secure meeting location. □ City to coordinate advertising and invites for the community meetings. □ City responsible for posting information on the City website, if desired. Task 5: 60% PLANS, SPECIFICATIONS AND OPINION OF PROBABLE CONSTRUCTION COST (PS&E) Task 5.1: 60% Plans Xxxxxx-Xxxx will prepare 60% plans based on the approval of Task 3 for City’s review andcomment. The design will be based on the following standards: City of Escondido Design Standards, San Diego Regional Standards, San Diego County Design Standards, Caltrans Highway Design Manual and the 2014 California Manual on Uniform Traffic Control Devices (CA-MUTCD). Xxxxxx-Xxxx’x design will consist of the followingsheets: Sheet Description No. of Sheets Scale 2 Legend, Abbreviations and General Notes Sheets 2 NTS 3 Demolition Plans 2 1’ = 20’ 4 Sidewalk Improvement Plans 3 1’ = 20’ 5 Roundabout Improvement Plans 3 1’ = 10’ 6 Sidewalk Horizontal & Vertical Control Plans 6 1’ = 10’ 7 Roundabout Horizontal & Vertical Control Pl...
Potholing. The Construction Management Professional shall review construction contractor's potholing plan including monitoring of construction contractor's potholing plan and provide a quality control check of the proposed sequence of potholing and resolution of any mismarked utilities. Should the construction contractor discover a mismarked utility or conflict, the Construction Management Professional shall coordinate resolution with the Design Engineer.
Potholing. RMC will identify utilities or other buried structures along the pipeline alignment whose location may significantly impact the project design, could potentially result in costly change orders, or poses a safety hazard during construction. Such facilities may include but are not limited to large diameter or high pressure gas mains, large electrical or communication ducts, and large water pipelines (greater than 16” diameter). In general, gravity pipelines (sewer and storm sewers) will be accurately located using surveyed invert elevations at manholes and other structures and will not require potholing. The fee estimate assumes up to 5 potholes will be performed. The horizontal and vertical location of potholed facilities will be depicted on the Drawings. RMC assumes that BWP will pay for potholing permit and lane closure fees separately. Task 4: Project Implementation Schedule. RMC will update the project implementation schedule, including an estimate for completion of design, bidding, award and construction. The schedule will be refined and submitted to BWP at 50%, 90% and Final Design.