Manual on Uniform Traffic Control Devices Sample Clauses

Manual on Uniform Traffic Control Devices. Local traffic and access to private driveways shall be maintained at all times. SC-8 CURB & GUTTER, COMBINED (TYPE B) SC-8.1 " Curb & Gutter, Combined (Type B)" shall be measured by the lineal foot of acceptable curb and gutter in place and shall include subgrade preparation, forming, reinforcing steel, pouring and backfilling. SC-8.2 Payment shall be made at the contract unit price bid as shown in the Bid Form for “Curb & Gutter, Combined (Type B)”. Payment shall be full compensation for furnishing and installing all materials and appurtenant work.
AutoNDA by SimpleDocs
Manual on Uniform Traffic Control Devices. Local traffic and access to private driveways shall be maintained at all times. CURB & GUTTER, COMBINED (TYPE B) " Curb & Gutter, Combined (Type B)" shall be measured by the lineal foot of acceptable curb and gutter in place and shall include subgrade preparation, forming, reinforcing steel, pouring and backfilling. Payment shall be made at the contract unit price bid as shown in the Bid Form for “Curb & Gutter, Combined (Type B)”. Payment shall be full compensation for furnishing and installing all materials and appurtenant work. SIDEWALK CONSTRUCTION (4") “Sidewalk Construction (4")” shall be measured by the square foot of acceptably installed sidewalk in place and shall include all required grading to return area to original or better condition and related work to provide a finished product as intended by the Contract Documents. Payment shall be made at the contract unit price bid as shown in the proposal for “Sidewalk Construction (4")”. Payment shall be full compensation for furnishing and installing all materials and appurtenant work.
Manual on Uniform Traffic Control Devices. If proper traffic control is not in place, TDOT may order Licensee to stop work until proper traffic control is put in place.
Manual on Uniform Traffic Control Devices published by FHWA Table 1 shows the inscribed circle diameter ranges design standard: Site Category Typical Design Vehicle Inscribed Circle Diameter Range* Rural Single Xxxx XX-67 180-200 feet Rural Double Xxxx XX-67 180-200 feet * Assumes 90 degree angles between entries and no more than four legs. Intersections of roadway facility types will consider all forms of intersection to ensure safe operating environment. A modern roundabout is the required form of intersection between two or more major collectors otherwise allowed by City of Madras.
Manual on Uniform Traffic Control Devices. The Consultant understands and agrees that the above references are not comprehensive. Consultant shall verify and add to the list as needed to complete the Project to industry care and standards.
Manual on Uniform Traffic Control Devices. The traffic control plan will be submitted to the City for review and approval prior to inclusion in the Final Design construction plans.
Manual on Uniform Traffic Control Devices. The road agency from whom you are applying for a permit should have a copy of the "Manual on Uniform Traffic Control Devices. "It is also available on the Internet at: xxxx://XXXXX.xxxx.xxx.xxx/)
AutoNDA by SimpleDocs
Manual on Uniform Traffic Control Devices published by FHWA Table 1 shows the inscribed circle diameter ranges design standard: Site Category Typical Design Vehicle Inscribed Circle Diameter Range* Rural Single Xxxx XX-67 180-200 feet Rural Double Xxxx XX-67 180-200 feet * Assumes 90 degree angles between entries and no more than four legs. Intersections of roadway facility types will consider all forms of intersection to ensure safe operating environment. A modern roundabout is the required form of intersection between two or more major collectors otherwise allowed by City of Madras. Standard roundabout design consists of an inscribed circle diameter of one hundred ninety feet (190’). Two hundred sixty feet (260’) minimum diameter right of way shall be dedicated as default. A right of way with a larger diameter may be required to accommodate an intersection due to various site-specific constraints. A safety and operational analysis will be conducted at proposed/planned roundabouts before a final design is approved when conditioned by the City. In some cases, a lesser standard roundabout design can be approved at the discretion of the Public Works Director but only if it can be proven that a WB-678 design vehicle will not need use of the intersection.

Related to Manual on Uniform Traffic Control Devices

  • Traffic Control The Surveyor shall control traffic in and near surveying operations adequately to comply with provisions of the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI which can be found on the State’s internet site. In the event field crew personnel must divert traffic or close traveled lanes, a Traffic Control Plan based upon principles outlined in the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI shall be prepared by the Surveyor and approved by the State prior to commencement of field work. A copy of the approved plan shall be in the possession of field crew personnel on the job site at all times and shall be made available to the State’s personnel for inspection upon request.

  • Originating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

  • Export Control Compliance User acknowledges that Center is an open laboratory for fundamental research that has many foreign persons as its employees and students. User understands and agrees that under no circumstances will User bring export control-listed items, or unpublished software source code or technical information in the form of defense articles or technical data regulated by the International Traffic in Arms Regulations (ITAR), to Center. Use of Center or facilities for activity subject to the ITAR, including the development, assembly or fabrication of defense articles identified on the US Munitions List, is prohibited.

  • Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.

  • State Approval of Replacement Personnel The Engineer may not replace the project manager or key personnel without prior consent of the State. The State must be satisfied that the new project manager or other key personnel is qualified to provide the authorized services. If the State determines that the new project manager or key personnel is not acceptable, the Engineer may not use that person in that capacity and shall replace him or her with one satisfactory to the State within forty-five (45) days.

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

  • Data Access Control Persons entitled to use data processing systems gain access only to the Personal Data that they have a right to access, and Personal Data must not be read, copied, modified or removed without authorization in the course of processing, use and storage. Measures: • As part of the SAP Security Policy, Personal Data requires at least the same protection level as “confidential” information according to the SAP Information Classification standard. • Access to Personal Data is granted on a need-to-know basis. Personnel have access to the information that they require in order to fulfill their duty. SAP uses authorization concepts that document grant processes and assigned roles per account (user ID). All Customer Data is protected in accordance with the SAP Security Policy. • All production servers are operated in the Data Centers or in secure server rooms. Security measures that protect applications processing Personal Data are regularly checked. To this end, SAP conducts internal and external security checks and penetration tests on its IT systems. • SAP does not allow the installation of software that has not been approved by SAP. • An SAP security standard governs how data and data carriers are deleted or destroyed once they are no longer required.

  • Benchmarks for Measuring Accessibility For the purposes of this Agreement, the accessibility of online content and functionality will be measured according to the W3C’s Web Content Accessibility Guidelines (WCAG) 2.0 Level AA and the Web Accessibility Initiative Accessible Rich Internet Applications Suite (WAI-ARIA) 1.0 for web content, which are incorporated by reference. Adherence to these accessible technology standards is one way to ensure compliance with the College’s underlying legal obligations to ensure that people with disabilities are able to acquire the same information, engage in the same interactions, and enjoy the same benefits and services within the same timeframe as their nondisabled peers, with substantially equivalent ease of use; that they are not excluded from participation in, denied the benefits of, or otherwise subjected to discrimination in any College programs, services, and activities delivered online, as required by Section 504 and the ADA and their implementing regulations; and that they receive effective communication of the College’s programs, services, and activities delivered online.

  • Data Input Control It will be possible to retrospectively examine and establish whether and by whom Personal Data have been entered, modified or removed from SAP data processing systems. Measures: • SAP only allows authorized personnel to access Personal Data as required in the course of their duty. • SAP has implemented a logging system for input, modification and deletion, or blocking of Personal Data by SAP or its subprocessors within the Cloud Service to the extent technically possible.

  • DRUG AND ALCOHOL TESTING Employees may be tested for drugs and/or alcohol pursuant to the provisions of the Employer's Drug and Alcohol Testing Policy which is attached hereto and made a part of this Agreement as if more fully set forth herein.

Time is Money Join Law Insider Premium to draft better contracts faster.