Mining Plan means a mining plan drawn in accordance with clause (b) of sub-section
Project Implementation Plan means the detail plan submitted by the Developer with regard to development of Project Facilities and its operation and management thereof in accordance with this Agreement and to be appended as Schedule 9 to this Agreement.
Training Plan means the plan that outlines what training and assessment will be conducted off-the- job and what will be conducted on-the-job and how the Registered Training Organisation will assist in ensuring the integrity of both aspects of the training and assessment process.
service delivery and budget implementation plan means a detailed plan approved by the executive mayor of a municipality in terms of section 53(l)(c)(ii) of the MFMA for implementing the municipality's delivery of municipal services and its annual budget, and which must indicate
engineering services means infrastructure for –
Decommissioning Plan means the document containing detailed information on the proposed decommissioning and covering the following: the selected decommissioning strategy; the schedule, type and sequence of decommissioning activities; the waste management strategy applied, including clearance; the proposed end state; the storage and disposal of the waste from decommissioning; the timeframe for decommissioning; the cost estimates for the completion of decommissioning; and the objectives, expected results, milestones, target dates, as well as the corresponding key performance indicators, including, as appropriate, earned value based indicators. The plan is prepared by the nuclear facility license holder and is reflected in the multiannual work programmes of the Programme;
Initial Engineering Report means the engineering report dated as of December 31, 2014, prepared by Xxx Xxxxxxx & Associates, Inc.
Operating Plan means a plan adopted or amended under this section for the development, redevelopment, maintenance, operation and promotion of a business improvement district, including all of the following:
Improvement Plan means the plan required by the Authority from the Supplier which shall detail how the Supplier will improve the provision of the Goods and/or Services pursuant to Clause 29.1.1 (Authority Remedies);
external engineering service means an engineering service situated outside the boundaries of a land area and that is necessary to serve the use and development of the land area;
Engineering means the application of scientific knowledge for the design, control, or use of building structures, equipment, or apparatus.
Redevelopment Plan means the “Lincoln Center Redevelopment Plan” passed, adopted and approved by the City pursuant to the Resolution, and shall include any amendment of said Redevelopment Plan heretofore or hereafter made by the City pursuant to law.
Development Plan means that information and those requirements for a development set forth in section 16.
Marketing Plan means a plan or system concerning a material aspect of conducting business. Indicia of a marketing plan include any of the following:
Geotechnical engineer means a professional engineer registered with the Association of Professional Engineers, Geologists, and Geophysicists of the Northwest Territories and whose principal field of specialization is the design and construction of earthworks in a permafrost environment;
Numbering Plan Area (NPA) , also called area code, means the three (3)-digit code that occupies the A, B, C positions in the ten (10)-digit NANP format that applies throughout the NANP Area. NPAs are of the form NXX, where N represents the digits two (2) through nine (9) and X represents any digit zero (0) through nine (9). In the NANP, NPAs are classified as either geographic or non-geographic. Geographic NPAs are NPAs which correspond to discrete geographic areas within the NANP Area. Non-geographic NPAs are NPAs that do not correspond to discrete geographic areas, but which are instead assigned for services with attributes, functionalities, or requirements that transcend specific geographic boundaries. For example, NPAs in the N00 format, (e.g., 800, 900) are non- geographic.
site development plan means a dimensioned plan drawn to scale that indicates details of the proposed land development, including the site layout, positioning of buildings and structures, property access, building designs and landscaping;
Numbering Plan Area (“NPA”) (sometimes referred to as an area code) is the three- digit indicator which is designated by the first three digits of each 10-digit telephone number within the NANP. Each NPA contains 800 possible NXX Codes. There are two general categories of NPA, “Geographic NPAs” and “Non-Geographic NPAs.” A “Geographic NPA” is associated with a defined geographic area, and all telephone numbers bearing such NPA are associated with services provided within that geographic area. A “Non-Geographic NPA,” also known as a “Service Access Code (SAC Code)” is typically associated with a specialized Telecommunications Service which may be provided across multiple geographic NPA areas; 500, 800, 900, 700, and 888 are examples of Non-Geographic NPAs.
Engineering Report means either an Independent Engineering Report or an Internal Engineering Report.
Good engineering practice (GEP) stack height means the greater of:
Work Plan means a plan that describes each individual activity to be conducted to complete eligible activities and the associated costs of each individual activity.
Project Plan means the document to be developed by the Contractor and approved by Webel Technology Ltd., based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalized Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by Webel Technology Ltd. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.
Construction Plan means a representation of a project site and all activities associated with the project. The plan includes the location of the project site, buildings and other infrastructure, grading activities, schedules for implementation, and other pertinent information related to the project site. A storm water pollution prevention plan is a part of the construction plan.
Procurement Plan means the Borrower’s procurement plan for the Project, dated September 22, 2008 and referred to in paragraph 1.16 of the Procurement Guidelines and paragraph 1.24 of the Consultant Guidelines, as the same shall be updated from time to time in accordance with the provisions of said paragraphs.
Systems Engineering means preparing specifications, identifying and resolving interface problems, developing test requirements, evaluating test data, and supervising design.
Good Engineering Practice means, Works carried out in accordance with the following standards/ specifications,