Procedure for submission and acceptance of Contractor’s design. Not applicable
AutoNDA by SimpleDocs
Procedure for submission and acceptance of Contractor’s design. The Employer’s process for designs which the Contractor has to comply with is detailed 331-86 Rev
Procedure for submission and acceptance of Contractor’s design. The Contractor submits all designs to the Project Manager for record purposes. The designs submitted are complete packages with all elements (drawings, calculations) included.  The Employer reserves the right to review any design in the detail that is deemed necessary. The Employer accepts no accountability and liability due to the review of any designs or if any acceptance is given.  The Contractor is the Design Authority. The Contractor needs to supply the Employer with a design to install the HFPSs. This must include the submission of the following design deliverables for review and acceptance.
Procedure for submission and acceptance of Contractor’s design. The Contractor submits a design package that includes the following: All designs & installation diagrams  Cable schedule  Control and Operating philosophy,  Maintenance schedule,  Alarm Response Procedures  Maintenance manual  Operating manual The Contractor shall submit the design package to the Project Manager for acceptance. The Contractor shall allow up to three weeks for the acceptance of the design package. The Contractor shall co-operate with the Employer as required during this period. The Contractor shall after refurbishment of lifts submit detailed design information of the lifts and associated drawings containing the following but not limited to:  Drawings indicating the detail of the modifications done to the lifts  Details of the design measures to ensure energy efficiency.  Detail of the corrosion protection systems used.  Confirmation that the design of the works complies with the National Building regulations.  Confirmation that the existing equipment in the building can be transported in the lift.  Submits an Operation and Maintenance Manual, where applicable;  Details of the design measures to prevent ingress of water into the new lift shaft. Other requirements of the Contractor’s Work Configuration Management Document Management The language of all documentation is in English. The Contractor includes the Employer’s drawing number in the drawing title block. This requirement only applies to design drawings developed by the Contractor and its Subcontractors. Drawing numbers are assigned by the Employer as drawings are developed.
Procedure for submission and acceptance of Contractor’s design i. Detail of Contractor’s design which is to be submitted to the Project Manager for his acceptance: All statements in this works information requiring the Contractor to submit documents, drawings or tests to the Project Manager for acceptance must be in sufficient detail for the Project Manager to make a decision without requiring further investigation.
Procedure for submission and acceptance of Contractor’s design. Not applicable as the Contractor is using the Employer’s design as set out in the drawings listed under section 7 of this Works Information.
Procedure for submission and acceptance of Contractor’s design. As stated in section 2.9.1.3 of this document.
AutoNDA by SimpleDocs

Related to Procedure for submission and acceptance of Contractor’s design

  • Deadline for Submission of Bids 19.1 Bids must be received by the Purchaser at the address specified under ITB Clause 18.2 no later than the time and date specified in the Bid Data Sheet. 19.2 The Purchaser may, at its discretion, extend this deadline for the submission of bids by amending the bidding documents in accordance with ITB Clause 7, in which case all rights and obligations of the Purchaser and bidders previously subject to the deadline will thereafter be subject to the deadline as extended.

  • CONTRACTOR’S SUBMISSION OF CONTRACT MODIFICATIONS In connection with any Contract modification, OGS reserves the right to:  request additional information  reject Contract modifications  remove Products from Contract modification requests  request additional discounts for new or existing Products

  • Notification of Acceptance of General Offer of Privacy Terms Upon execution of Exhibit “E”, General Offer of Privacy Terms, Subscribing LEA shall provide notice of such acceptance in writing and given by personal delivery, or e-mail transmission (if contact information is provided for the specific mode of delivery), or first-class mail, postage prepaid, to the designated representative below. The designated representative for notice of acceptance of the General Offer of Privacy Terms is: Name: Xxxxx Xxxxxxxx Title: Technology Director Contact Information: xxxxx.xxxxxxxx@xxxxxxxxx.x00.xx.xx (000)000-0000 xxx 000

  • Notification of Acceptance of General Offer of Terms Upon execution of Exhibit “E”, General Offer of Terms, Subscribing LEA shall provide notice of such acceptance in writing and given by personal delivery, or e-mail transmission (if contact information is provided for the specific mode of delivery), or first-class mail, postage prepaid, to the designated representative below. The designated representative for notice of acceptance of the General Office of Privacy Terms is: Name: Title: Contact Information:

  • Termination for Convenience of the County Notwithstanding any other provision of the Contract, the County may, at any time, and without cause, terminate this Contract in whole or in part, upon not less than seven (7) days' written notice to the Contractor. Such termination shall be effected by delivery to the Contractor of a notice of termination specifying the effective date of the termination and the extent of the Work to be terminated. The Contractor shall immediately stop Work in accordance with the notice and comply with any other direction as may be specified in the notice or as provided subsequently by the County. The County shall pay the Contractor for the Work completed prior to the effective date of the termination and such other payment Contractor is entitled to under Attachment A, section III. “Performance Requirements” and such payment shall be Contractor's sole remedy under this Contract. Under no circumstances will the Contractor be entitled to anticipatory or unearned profits, consequential damages, or other damages of any sort as a result of a termination or partial termination under this Paragraph. The Contractor shall insert in all subcontracts that the sub-consultant shall stop Work on the date of and to the extent specified in a notice of termination, and shall require sub-consultant’s to insert the same condition in any lower tier subcontracts.

  • Delivery and Acceptance of the Manuscript The Author shall deliver the Contribution to the Editor (or, if requested by the Publisher, to the Publisher) on or before Delivery Date (the “Delivery Date”) electronically in the Publisher's standard requested format or in such other form as may be agreed in writing with the Publisher. The Author shall retain a duplicate copy of the Contribution. The Contribution shall be in a form acceptable to the Publisher (acting reasonably) and in line with the instructions contained in the Publisher’s guidelines as provided to the Author by the Publisher. The Author shall provide at the same time, or earlier if the Publisher reasonably requests, any editorial, publicity or other information (and in such form or format) reasonably required by the Publisher. The Publisher may exercise such additional quality control of the manuscript as it may decide at its sole discretion including through the use of plagiarism checking systems and/or peer review by internal or external reviewers of its choice. If the Publisher decides at its sole discretion that the final manuscript does not conform in quality, content, structure, level or form to the stated requirements of the Publisher, the Publisher shall be entitled to terminate this Agreement in accordance with the provisions of this Clause. The Author must inform the Publisher at the latest on the Delivery Date if the sequence of the naming of any co-authors entering into this Agreement shall be changed. If there are any changes in the authorship (e.g. a co-author joining or leaving), then the Publisher must be notified by the Author in writing immediately and the Parties will amend this Agreement accordingly. The Publisher shall have no obligation to consider publication under this Agreement in the absence of such agreed amendment. If the Author fails to deliver the Contribution in accordance with the provisions of this Clause above by the Delivery Date (or within any extension period given by the Publisher at its sole discretion) or if the Author (or any co-author) dies or becomes incapacitated or otherwise incapable of performing the Author’s obligations under this Agreement, the Publisher shall be entitled to either: (a) elect to continue to perform this Agreement in accordance with its terms and the Publisher may commission an appropriate and competent person (who, in the case of co-authors having entered into this Agreement, may be a co-author) to complete the Contribution; or (b) terminate this Agreement with immediate effect by written notice to the Author or the Author's successors, in which case all rights granted by the Author to the Publisher under this Agreement shall revert to the Author/Author's successors (subject to the provisions of the Clause "Termination"). The Author agrees, at the request of the Publisher, to execute all documents and do all things reasonably required by the Publisher in order to confer to the Publisher all rights intended to be granted under this Agreement. The Author warrants that the Contribution is original except for any excerpts from other works including pre-published illustrations, tables, animations, text quotations, photographs, diagrams, graphs or maps, and whether reproduced from print or electronic or other sources ("Third Party Material") and that any such Third Party Material is in the public domain (or otherwise unprotected by copyright/other rights) or has been included with written permission from or on behalf of the rights holder (and if requested in a form prescribed or approved by the Publisher) at the Author's expense unless otherwise agreed in writing, or is otherwise used in accordance with applicable law. On request from the Publisher, the Author shall in writing indicate the precise sources of these excerpts and their location in the manuscript. The Author shall also retain the written permissions and make them available to the Publisher on request.

  • Termination for Convenience of County County may terminate this Contract at any time by providing a notice in writing to Contractor that the Contract is terminated. Said Contract shall then be deemed terminated and no further work shall be performed by Contractor. If the Contract is so terminated, the Contractor shall be paid for that percentage of the phase of work actually completed, based on a pro rata portion of the compensation for said phase satisfactorily completed at the time of notice of termination is received.

  • Updated Information Submission by Interconnection Customer The updated information submission by the Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. The Interconnection Customer shall submit a completed copy of the Electric Generating Unit data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to the Participating TO and the CAISO for the Interconnection Studies. Information in this submission shall be the most current Electric Generating Unit design or expected performance data. Information submitted for stability models shall be compatible with the Participating TO and CAISO standard models. If there is no compatible model, the Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If the Interconnection Customer's data is materially different from what was originally provided to the Participating TO and the CAISO for the Interconnection Studies, then the Participating TO and the CAISO will conduct appropriate studies pursuant to the LGIP to determine the impact on the Participating TO’s Transmission System and affected portions of the CAISO Controlled Grid based on the actual data submitted pursuant to this Article 24.3. The Interconnection Customer shall not begin Trial Operation until such studies are completed and all other requirements of this LGIA are satisfied.

  • TERMINATION FOR NON-ADHERENCE OF COUNTY LOBBYIST ORDINANCE The Contractor, and each County Lobbyist or County Lobbying firm as defined in County Code Section 2.160.010 retained by the Contractor, shall fully comply with the County’s Lobbyist Ordinance, County Code Chapter

Time is Money Join Law Insider Premium to draft better contracts faster.