Party Evaluator Sample Clauses

Party Evaluator. Xx. Xxxxx Xxxxxxxx Navarro (private company) Obtained a bachelor’s degree in sociology from Universidad de Antioquia. Currently working as an independent consultant. Former Director of Agencia Colombiana de Cooperacion Internacional. Specializes in social development, participatory planning, monitoring and evaluation, etc. Water Quality of Cauca River *1 Item Water Quality of Cauca River *2 Japanese Water Quality Standard for Rivers *3 2002 2003 2004 pH 7.10 6.97 6.66 6.5 - 8.5 BOD (mg/ ) 8.80 4.23 3.33 3 or less TSS (mg/ ) 172.0 84.0 115.7 25 or less DO (mg/ ) 0.60 2.17 2.14 5 or more source: Corporacion Autonoma Regional del Cauca (CVC) *1 Japanese standards are applied because Columbia has no water quality standards for rivers. *2 The measurement site was 49 km downstream from the Cali sewage treatment plant. Also, the data are based on results of spot checks, not on annual averages. *3 This standard is for “grade 3 for tap water, and grade 2 for marine products.” Results of Beneficiary Surveys (Targets: 100 households of Cali residents) Of the 100 households that participated in the beneficiary survey, 96 households mentioned “released from fetching water” as one of the positive impacts of this project. The number of households that experienced outbreaks of water-borne infectious diseases also decreased from 15 households prior to the project to 4 after the project. Therefore, it appears that the project is contributing to an improvement in the living and hygienic environment of the residents.
AutoNDA by SimpleDocs
Party Evaluator. Mr. Xxxxxxx Xxxxxxx Xx Xxxxxxx Obtained a master’s degree in economics from Pittsburgh State University. Presently holds the post of Director of the Board, Krung Thai Bank Public Company Limited, and the post of President, Thailand Development Research Institue (TDRI), specializing in finance. SOx removal efficiency 1998 SOx removal efficiency 2002 SOx removal efficiency % 100 95 80 planned level 60 40 20 0 Gen.8 Gen.9 Gen.10 Gen.11 The SOx removal efficiency in 1998 was 45.7% - 90.0% in 1998, but this improved to 97.0% - 98.1% in 2002, following the completion of the project. Sulfur Oxides (SOx) “Sulfur Oxides” is a general name for all oxides of sulfur which are produced when fossil fuels such as oil and coal are burned. Sulfur oxides cause acid rain since they display strong acidity in combination with water. In Japan, air pollution problems caused by sulfur oxides are declining due to the spread of taller smokestacks, crude oil desulphurization technology, flue gas desulphurization technology, and substitution of fuels such as natural gas. However, sulfur oxides remain a serious problem particularly in developing countries. Having both domestic and abroad inspection parties to the flue gas desulphurization equipment control room to stimulate the technology.
Party Evaluator. Xx. Xxxxx Xxxx Obtained a doctorate in urban planning from Asian Institute of Technology. Presently holds the post of Associate Professor, School of Construction Engineering, SeMyung University. Specializes in overall urban planning and urban & regional development in Southeast Asia.
Party Evaluator. Xx. Xxxxxxx Xxxxxxx Soemantri Brodjonegoro Obtained a doctorate in urban regional planning from University of Illinois. Presently holds the post of Professor, Faculty of Economics, University of Indonesia. Specializes in urban regional planning, economics of development, regional economics, etc. Layout of Bali International Airport Newly developed departure lobby in the international passenger terminal building Expansion of international passenger terminal Construction of west parallel taxiway Extension of aprons Hindu Temple temporary burial ground Relocation/extension of east parallel taxiway The project involved extensions to aprons and expansion of passenger terminals, plus the development of parallel taxiways, which improved airport safety as well as increasing flight punctuality and passenger comfort. The passenger terminal, which is the gateway to Bali, is now more spacious and comfortable for passengers as the result of this project.
Party Evaluator. Xx. Xxxxxxx Xxxxx Xxxxxxx Obtained a doctorate in economics from Indian Statistical Institute. Presently holds the post of Chief Economist, National Council of Applied Economic Research, specializing in developing economies. The power plant and the power generator control room constructed under the project Power plant Power generator control room The staff of the power plant and the outsourcing company carry out daily operation and maintenance of the power plant. The local residents, who can now use electric appliances thanks to the project, enjoy the benefit of the project such as the mechanization of farm works and TV watching.
Party Evaluator. Xx. Xxxxxxxx Xxxxxxxxxx Third-Party Evaluator: Obtained a doctorate in Infrastructure Systems Engineering from Saitama University. Presently holds the post of Senior Lecturer, Department of Building Economics, Faculty of Architecture, University of Moratuwa. Specialize in infrastructure development and management. Changes in Subscriber Lines (1994-2000) lines 900,000 Project Area Entire Sri Lanka 800,000 764,407 704,095 700,000 650,488 600,000 579,202 500,000 400,000 460,468 315,865 300,000 254,523 205,963 200,000 180,729 100,000 0 33,264 38,109 43,507 62,166 110,349 153,488 181,723 213,777 225,643 0000 0000 0000 1997 1998 1999 2000 2001 2002 The switching equipment procured under the project in Kalutara, where the number of subscriber lines has increased sharply from 4,000 in 1994 to 32,000 in 2002. The project helps deal with the ever-increasing demand for telephone service. Source: SLTL
Party Evaluator. Xx. Xxxxxxx Xxxxxxx Soemantri Brodjonegoro Obtained a doctorate in urban regional planning from University of Illinois. Presently holds the post of Professor, Faculty of Economics, University of Indonesia. Specializes in urban regional planning, economics of development, regional economics, etc. DMU equipment and current road maintenance conditions Changes in the number of traffic accidents thousands No. of accidents 30 15 10 5 0 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 Source: Central Bureau of Statistics In the beneficiary survey, respondents stated that disaster recovery work takes less time and that roads have become smoother. Traffic accidents declined throughout the 1990s, with the decreases being particularly marked from 1997 onwards.
AutoNDA by SimpleDocs
Party Evaluator. Xx. Xxxxxxx Xxxxxxx Soemantri Brodjonegoro Obtained a doctorate in urban regional planning from University of Illinois. Presently holds the post of Professor, Faculty of Economics, University of Indonesia. Specializes in urban regional planning, economics of development, regional economics, etc. Infrastructure constructed through the project Mains water supply facilities An access road The water being supplied from the mains water facilities that were installed via this project is serving various purposes and is being used for drinking and lifestyle- related uses. Further, the development of access roads has shortened travel times to main markets and reduced the costs of transporting produce to the markets as compared to pre-project levels. In addition, the development of this infrastructure has lessened the volume of household labor performed by the women of the villages, which has enabled them to devote time to the production of handicrafts and is having positive impacts, including bringing them higher earnings.
Party Evaluator. Mr. Xxxxxx Xxxxxx-ngavej (academia) Obtained a doctoral degree in management research from Ohio State University. Presently holds the post of Deputy Xxxx, School of Management, Xxxxxxxxxx University. Specializes in business administration and industrial engineering. 49.5 37.0 6.5 7.0 43.5 42.0 7.5 7.0 30
Party Evaluator. Xx. Xxxxxxxx Xxxxxx Xxxxxx (mass communication) Obtained a master’s degree in Urdu literature from Bhauddin Zikria University. Currently senior reporter, anchor, and producer for AAJ Television. Specializes in journalism. Contribution of the Rehabilitated and Manufactured Locomotives for Railway Transport Locomotive Distance Passenger Transport Traveled Volume (km) (US-made locomotives only) (persons-km) 12% 11% 23% 65% 59% 30% Freight Transport Volume (tons-km) 17% 83% 48 rehabilitated locomotives 30 manufactured locomotives Other locomotives US-made locomotive in rehabilitation Rawalpindi Central Repair Shop
Time is Money Join Law Insider Premium to draft better contracts faster.