INTERSECTING ROADS Sample Clauses

INTERSECTING ROADS. State Rt 142 ~ 431’ South TRAFFIC CONTROL STOP Signs on CR 600E @ State Rt 142 does not stop. ADT 75 Vehicles Per Day TRAFFIC TYPE Passenger, School Buses, Hazardous Materials, and Emergency Response all possible ADVANCE WARNING YES PAVEMENT MARKING No RAILROAD DATA: FREIGHT TRAFFIC 14 trains per day @ 25 MPH PASSENGER TRAFFIC None WARNING DEVICES Crossbucks with YIELD OTHER NOTES: EVWR will need to coordinate with the Township/County at least 60 days in advance on the roadway closure, traffic control, and detour route. Contact County Xxxxxxxx, Xxxx Xxxxxxxx at (000) 000-0000; xxxxxxxx@xxxxxxxxxxxxxxxx.xxx or Road Commissioner Xxxxx Xxxxxx at (000) 000-0000 SA 2256 Exhibit A1 OWNER INFORMATION CONTRACTOR INFORMATION Company Evansville Western Railway Contact Name Xxxxx Xxxxxx Address 000 Xxxx 0xx Xxxxxx Xxxx, Xxxxx, XXX Xxxxx Xxxxxx, IN 47620 Phone Cell Phone 000.000.0000 Company Track Tech, Inc. Contact Name Xxxxx Xxxxxxx Address 0000 Xxxxxxxxxx Xxxxxxx Xxxx, Xxxxx, XXX Xxxxxxx Xxxx, XX 00000 Phone 000.000.0000 Cell Phone 000.000.0000 Email xxxxxxx@xxxxx.xxx Email xxxxx@xxxxxxxxx.xx PROJECT NAME ICC State Crossings 2023 - CR 600E - 346415R CR 600E - 346415R Build 2 Ea. 80' track panels utilizing NEW head-hardened 136RE rail/OTM and 76 Ea. 10' ties. Establish traffic control plan and detour routing. Close and barricade road. Sawcut and remove existing asphalt and crossing material. Remove existing track panels. Excavate fouled ballast to hardpan. Install track panels. Furnish and install 8 Ea. sets of 141/132 comp bars. Furnish and install AREMA 4A trap rock ballast (150 tons). Surface track panel with HARSCO Xxxx XX HD production tamper. Regulate ballast and broom finish track. Furnish and install 48.75 track feet of full depth timber crossing surface across both tracks. Furnish and install base/binder and surface asphalt at approaches. Furnish 8 Ea. comp weld kits. Total track labor and equipment: $49,976.00 Total hotels and per diem: $4,800.00 Total track material cost: $77,942.62 Total asphalt paving and traffic control: $25,000.00 Grand Total $157,718.62 SCOPE OF WORK We, Track Tech, Inc., hereby propose to complete the scope of work above for a lump sum price of $157,718.62. None. Exclusions Company Proposal GCPF Total NTE $102,943 0000 Xxxxxxxxxx Xxxxxxx X.X. Box 5 Calvert City, KY 42029 Phone: 000-000-0000 Fax: 000-000-0000 SA 2256 EXHIBIT B OWNER INFORMATION CONTRACTOR INFORMATION Company Evansville Western Railway Contact Name Xxxxx Xxxxxx Addres...
AutoNDA by SimpleDocs
INTERSECTING ROADS. X. Xxxxxxx St., 28 Ft. North; US Route 136, 42 Ft. South TRAFFIC CONTROL Stop sign on Xxxxxxx; None at US 136 & McArthur ADT 1,200 Vehicles Per Day TRAFFIC TYPE Passenger, School Busses, Hazardous Materials, and Emergency Response ADVANCE WARNING Yes PAVEMENT MARKING No RAILROAD DATA: FREIGHT TRAFFIC 20 trains per day @ 60 MPH PASSENGER TRAFFIC 4 trains per day @ 79 MPH WARNING DEVICES Automatic Flashing Light Signals and Gates OTHER
INTERSECTING ROADS. Husband Rd., 208 Ft. East; IL Route 37., 493 Ft. West TRAFFIC CONTROL None; STOP sign on Shadow Rd ADT 175 Vehicles Per Day TRAFFIC TYPE Passenger, School Busses, Hazardous Materials, and Emergency Response ADVANCE WARNING Yes PAVEMENT MARKING No RAILROAD DATA: FREIGHT TRAFFIC 4 trains per day @ 49 MPH PASSENGER TRAFFIC None WARNING DEVICES Crossbucks with YIELD signs OTHER NOTES: Automatic Flashing Light Signals and Gates are scheduled for installation. GENERAL INFORMATION: RAILROAD Union Pacific Railroad Company USDOT#, MILEPOST 920468W; 276.52-CC STREET, CITY, COUNTY Liberty Street, Mt. Vernon, Jefferson County JURISDICTION (RDWY) City LOCATION Urban STREET SURFACE 2 Lanes – bituminous surface (E/W) CROSSING DATA: TRACK SURFACE TYPE SURFACE WIDTH SURFACE CONDITION Main (N/S) Timber Approx. 33 ft. Fair – Poor ROADWAY DATA:
INTERSECTING ROADS. Xxxxxxx St., 349 Ft. East TRAFFIC CONTROL STOP sign on Xxxxxxx St. ADT 175 Vehicles Per Day TRAFFIC TYPE Passenger, School Busses, Hazardous Materials, and Emergency Response ADVANCE WARNING Yes PAVEMENT MARKING No RAILROAD DATA: FREIGHT TRAFFIC 2 trains per day @ 10 MPH PASSENGER TRAFFIC None WARNING DEVICES Crossbucks with YIELD signs OTHER NOTES: Material And Force Account Estimate ICC SA 2041 Exhibit B1 Estimate Number: 126704 Version: 2 Standard Rates: Labor Additive = 149% Estimate Good Until 01/24/22 Location: XXXXXX SUB, SIMN, 323.06-323.1 Description of Work: 167665J Shadow Rd Marion IL 323.08 Marion Sub Prepared For: ICC Buy America: Yes COMMENTS FACILITY Description QTY ENGINEERING UOM UCST LABOR MATERIAL TOTAL UP %100 Agcy %0 Engineering 1 LS 23,500.00 23,500 0 23,500 23,500 0 Bill Prep Fee - Track Surface RECOLLECT 1 LS 900.00 900 0 900 900 0 Homeline Freight - Track Surface RECOLLECT 1 LS 900.00 0 900 900 0 900 Foreign Line Freight - Track Surface RECOLLECT 1 LS 1,044.78 0 1,045 1,045 0 1,045 TRACK CONSTRUCTION - COMPANY Sub-Total = 24,400 1,945 26,345 24,400 1,945 RDXING RDXING 136# CON10W PP PAN COMPLETE 24 TF 791.41 8,555 10,439 18,994 8,555 10,439 TRACK 136# CWRIS0 24-8'6" HWD N 16 TP 76 TF 409.37 20,438 10,674 31,112 20,438 10,674 BALAST BALAST CL1 9 CL 1,278.54 1,498 10,008 11,507 1,498 10,008 TRACK REMOVAL - COMPANY Sub-Total = 30,492 31,122 61,613 30,492 31,122 RDXING Remove road crossing - concrete 24 TF 41.19 989 0 989 989 0 TRACK Remove Track 76 TF 19.43 1,476 0 1,476 1,476 0 SITE WORK - CONTRACT Sub-Total = 2,465 0 2,465 2,465 0 Asphalt 400 LS 50.00 0 20,000 20,000 0 20,000 Traffic Control - Detour Signs & Coordination 4 LS 2,500.00 0 10,000 10,000 0 10,000 Sub-Total = 0 Total Wgt. in Tons = 1,207 Totals = 57,357 Est. Annual Mtc. Cost = $906 Grand Total = Disclaimer: The above figures are estimates only and are subject to fluctuation. In the event of an increase or decrease in cost or amount of material or labor required, Agency will pay actual costs at rates effective at the time of construction. 30,000 63,066 30,000120,423 $120,423 0 57,357 30,000 63,066 _ Material And Force Account Estimate ICC SA 2041 Exhibit B2 Estimate Number: 126452 Version: 2 Standard Rates: Labor Additive = 149% Estimate Good Until 01/24/22 Location: MT. XXXXXX SUB, SIMN, 276.45-276.55 Description of Work: DOT# 920468W-2 / LIBERTY STREET / MOUNT XXXXXX SUB MP 276.50 / MT XXXXXX, IL UPRR WILL BE REIMBURSED FOR 100% OF MATERIAL COSTS BY ICC, LABOR TO BE PAI...
INTERSECTING ROADS. X. Xxxxxxxxx Ave/X. Xxxxxxxxxx Rd < 100’ North IL 142 < 500’ South TRAFFIC CONTROL STOP Signs ADT 450 Vehicles Per Day TRAFFIC TYPE Passenger, School Busses, Hazardous Materials, and Emergency Response ADVANCE WARNING Yes PAVEMENT MARKING No RAILROAD DATA: FREIGHT TRAFFIC 2 trains per day @ 40 MPH PASSENGER TRAFFIC None WARNING DEVICES AFLS OTHER NOTES: See Page Two for Location Sketch XX 0000 Exh. A, Page 1 ■■■ ■■■■■■ ■■■■■■ DOT/AAR Inventory#: 346447W 15' 32"/-88 Location: Jefferson Co., Near Opdyke, IL ° ° 47' 18" Lat/Long: 100 swl TR1 50 25 I I I I IO q"' ,..._ : - ■ ■ �. -■":;!... .... ■■■-■.:.■■ ·�· ■ ■■■■■■■■■ -■■■■■■■■■ ■■■■■■■■■ NOTE: ALL MEASUREMENTS ARE IN FEET 50 100 I NE ...,. ...,.

Related to INTERSECTING ROADS

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Routes All bus stops and bus routes will be mutually agreed upon prior to the start of the school year. Additional stops will be not be added until approved by SSAS and reviewed for safety and approved by the School Board’s Transportation Department. Route changes, if approved, will require 7 calendar days from the date of request to the date of implementation. Special needs transportation requests must be made a minimum of 14 days prior to the requested date of implementation.

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • Roads 16. (1) The Joint Venturers shall —

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • Number Resources, Rate Center Areas and Routing Points 13.1 Nothing in this Agreement shall be construed to limit or otherwise adversely affect in any manner either Party’s right to employ or to request and be assigned any Central Office Codes (“NXX”) pursuant to the Central Office Code Assignment Guidelines and any relevant FCC or Commission orders, as may be amended from time to time, or to establish, by Tariff or otherwise, Rate Center Areas and Routing Points corresponding to such NXX codes.

  • Meters 7.1.1 For installation of Meters, Meter testing, Meter calibration and Meter reading and all matters incidental thereto, the SPD and SECI shall follow and be bound by the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006, the Grid Code, as amended and revised from time to time.

  • Bypass Any of the steps in this procedure may be bypassed with mutual written consent of the parties involved at the time the bypass is sought.

Time is Money Join Law Insider Premium to draft better contracts faster.