Traffic Control Plan Sample Clauses

Traffic Control Plan. For Section 150 for Traffic Control in Table 6, attach the special provision and/or you may provide additional traffic control requirements in this section. DELETE this note after traffic control requirements are decided.
AutoNDA by SimpleDocs
Traffic Control Plan. For any work that is to take place in or near roadways, the contractor shall submit a traffic control plan for acceptance prior to commencing any work. Contractor shall develop traffic control plan IAW EM 385- 1-1, State-specific guidelines and regulations, and installation-specific requirements.
Traffic Control Plan. 1.2.6.3 Any other applicable permits regarding work in the Right-of-way.
Traffic Control Plan. All permit applications which involve work on, in, under, across or along any Public Ways shall be accompanied by a traffic control plan demonstrating the protective measures and devices that will be employed, consistent with applicable local, state and federal laws and regulations, to prevent injury or damage to persons or property and to minimize disruptions to efficient pedestrian and vehicular traffic.
Traffic Control Plan. Xxxxxx-Xxxx will design a safe and effective (Level I) Traffic Control Plan, consisting of notes and details, to move vehicular and pedestrian traffic during construction. Maintenance of Traffic requirements for the construction of this project will be provided through the use of typical sections, plans, general notes and reference to the appropriate FDOT Design Standards (600 Series). In addition, a conceptual MOT phasing plan depicting detour routes and phase segments of pavement lane closures and traffic shifts will be prepared.
Traffic Control Plan. A traffic control plan to support the Contractor's operations shall be submitted at least 72 hours prior to commencing work that shall conform to the Florida Department of Transportation's "Manual on Traffic Control and Safe Practices" which shall be obtained by the Contractor at his expense.
Traffic Control Plan. The ENGINEER shall prepare traffic control and sequence of construction plans at a scale of 1" = 100’. The TCP plan will show staged construction of the cross streets improvements to maintain local access. The plans shall identify work areas, temporary paving, temporary shoring, signing, detour alignments, barricades, temporary drainage and other traffic control related items as required. A narrative will be prepared and submitted to the COUNTY for review and incorporation into the plans. Traffic control will utilize TxDOT standard details and meet the requirements of the Texas Manual on Uniform Traffic Control Devices (TMUTCD).
AutoNDA by SimpleDocs
Traffic Control Plan. Contractor shall work together with Owner to develop a comprehensive traffic control plan for the Project (“Traffic Control Plan”), to assure all persons supplying the Work prompt and safe access for deliveries to the Site, while minimizing disruption to the surrounding area its regular activities or scheduled events. Without limitation, the Traffic Control Plan shall provide, as required by the surrounding areas and its activities: (a) for off-site parking for construction personnel and transport of such personnel to the Site; (b) a general prohibition on deliveries of Major Equipment to the Site during the hours of 9pm to 4am; (c) that Contractor shall use its reasonable efforts to arrange for deliveries of Major Equipment during Business Days between 7am to 5pm; and (d) that it shall be consistent with any traffic control requirements set forth in any Governmental Authorization. Owner shall use good faith efforts to assist Contractor in the development of this plan and to assist in gaining for Contractor access to roads and other transportation facilities necessary for timely and cost-effective completion of the Project. When available, the draft traffic control plan shall be presented to Owner for review and approval. Contractor acknowledges that it has studied the Site, railroads, surrounding streets and highways and Contractor can transport all equipment to the Site and all costs associated with the transportation and unloading of the equipment are included in the EPC Price, provided that access to the Site is available to Contractor and the Subcontractors at all reasonable times and in accordance with the Traffic Control Plan.
Traffic Control Plan. The Municipality shall implement a Traffic Control Plan in compliance with the Manual on Uniform Traffic control Devices (“MUTCD”) including a provision for Municipal employees and/or contractors entering the State’s right-of-way for long- term maintenance.
Traffic Control Plan. Activity Code 1254) Contractor will perform the following tasks according to District 7 Traffic Guidelines, the Minnesota Manual on Uniform Control Devices (MUTCD), and the State’s Signing and Traffic Engineering Manuals. Contractor will: