Appendix 2 definition

Appendix 2. CLASSIFICATION STRUCTURE GENERAL DUTIES OF EMPLOYEES‌‌
Appendix 2 means Appendix 2 to CITES and “Appendix 2 specimen” means a specimen of a species listed in Appendix 2;
Appendix 2 means the provisions of the Plan contained in Appendix 2, which covers Employees employed at the Kalamazoo Board Mill or the Kalamazoo Carton Plant and represented by the union identified in Appendix 2.

Examples of Appendix 2 in a sentence

  • C27726-7 Appendices 1- 4 - A8V3C0, Appendix 2 Evidence of Pegasus-Global Holdings, Inc., PDF p.

  • The analysis laboratory must fulfil the requirements in Appendix 2.

  • Ancillary Service Offers higher than corresponding Ancillary Service penalty factors, as defined in Appendix 2, Day-Ahead Market Optimization Control Parameters, of the Other Binding Document titled “Methodology for Setting Maximum Shadow Prices for Network and Power Balance Constraints,” will not be awarded.

  • See Section 8 of Appendix 2 to the Interconnection Service Agreement as well as Section 4 of PJM Manual 14D for additional information.

  • A worked example demonstrating how the rent is calculated at review is also set out in Appendix 2 of the lease.


More Definitions of Appendix 2

Appendix 2. Saved Clauses” will apply only to the particular agency to which the part refers, unless the clause otherwise provides; and clauses in any schedule in “Appendix 4: Workplace Flexibility Agreements” will apply only to the workplace specified in the schedule.
Appendix 2 contains the specifications and requirements for the System and Services;
Appendix 2. PROGRESS REPORT ON WENDELSTEIN 7-X CONSTRUCTION‌ The Wendelstein 7-X project coordinates human resources, technical activities, the technical part of industry contracts and the contributions from other research centres and takes care of the interfaces between physics and engineering. The collaboration with other institutions is of utmost importance for the Wendelstein 7-X project. KIT, FZJ and CEA provide immediate support via the supply of technical components and tests for Wendelstein 7-X subsystems. EURATOM continues to support the project with senior experts consulting on key project tasks. The collaboration with ERM/KMS and FZJ for the ICRH has been further intensified. FZJ/TEC, the Wigner Institute Budapest, and the Polish Association are strongly involved in the development of diagnostics. The cooperation with KIT on the ECRH system is running well. The collaboration with KIT regarding the design and construction of the current leads for the superconducting coils has been successfully concluded with the final delivery of the last current leads. The collaboration with Polish research institutes is running smoothly. IPJ Swierk is continuing its work on the neutral beam injection system for W7-X. Various diagnostic systems are being developed by Polish institutes and universities. Within the collaboration with US laboratories, PPPL provides the trim coils for W7-X and the respective power supplies. All five coils and the power supplies have already been delivered to Greifswald. ORNL develops the design for the divertor scraper element, an additional high-heat-flux component to protect the divertor during plasma start-up with high power discharges. LANL is developing a fast infrared camera system for divertor monitoring. ⚫ Wendelstein 7-X construction (preferential support activity) The restructuring of operational phase 1 in two separate phases OP 1.1 and OP 1.2 and the revised plan of the KiP-assembly over three installations phases are now the working basis for the project schedule. Milestone 27 “Completion of Cryostat”, which marks the start of commissioning, is now the top priority of the project. Magnet system The current leads for the superconducting coil system have been completely assembled on three modules, the preparation for the remaining four CL-pairs is progressing according to the plan. All CLs are already installed in their final position. The power supplies for the five trim coils provided by PPPL have been delivered to the IPP; four co...
Appendix 2. Accounting Policies 2019/20 Accounting Policy New policy Amended policy No change In line with Code
Appendix 2. Handover Sheet for checking and acceptance 附件三房屋所有权证等 Appendix 3: Property Ownership Certificate, etc 甲方(公章): Party A (Seal): 授权代表(签章): Appointed representative (Seal): 联系电话:000-00000000 Contact phone: 000-00000000 开户行:交通银行上海周浦支行 Bank: Bank of Communication Shanghai Branch Zhoupu sub-Branch 银行帐号:310069134018010044556 Account No: 310069134018010044556 传真:000-00000000 Fax: 000-00000000 日期: Date: 乙方(公章): Party B (Seal) 授权代表(签章): Appointed representative (Seal): Contact phone: 传真: Fax: 日期: Date: [English Translation of Attached Chinese Document] 附件一:工业厂房清单 Appendix 1: Listing of Industrial Plant Ⅰ. 场地
Appendix 2. Handover Sheet for Checking and Acceptance 序号 Serial No. 设施(设备) 名称 (mm*mm) Facility / Equipment 数量 Quantity 性能(状态) Function / Status 备注 Remark
Appendix 2. The Research Programme (Insert Research Programme)