GENERATING FACILITY INTERCONNECTION AND DESIGN REQUIREMENTS Sample Clauses

GENERATING FACILITY INTERCONNECTION AND DESIGN REQUIREMENTS. 3.1 Member shall be responsible for the design, installation, operation, and maintenance of the Generating Facility and shall obtain and maintain any required governmental authorizations and/or permits.
AutoNDA by SimpleDocs
GENERATING FACILITY INTERCONNECTION AND DESIGN REQUIREMENTS. 4.1 Customer shall be responsible for the design, installation, operation, and maintenance of the Generating Facility and shall obtain and maintain any required governmental authorizations and/or permits.
GENERATING FACILITY INTERCONNECTION AND DESIGN REQUIREMENTS. 3.1 CG shall be responsible for the design, installation, operation, and maintenance of the Generating Facility and shall obtain and maintain any required governmental authorizations and/or permits.
GENERATING FACILITY INTERCONNECTION AND DESIGN REQUIREMENTS. 3.1 Customer will be responsible for the design, installation, operation, and maintenance of the Generating Facility and will obtain and maintain any required governmental authorizations and/or permits. 3.2 The Generating Facility must meet all applicable safety and performance standards established by the National Electrical Code, the Institute of Electrical and Electronics Engineers (“IEEE”), and accredited testing laboratories such as Underwriters Laboratories (“UL”), and, where applicable, rules of the Commission regarding safety and reliability. This requirement includes, but is not limited to the provisions of IEEE Standard 929, UL Standard 1741 and SCE’s Electric Rule 21. 3.3 For Customers interconnecting a Generating Facility under the provisions of Schedule NEM-V-ST, the Generating Facility must have a warranty of at least 10 years for all equipment and the associated installation from the system provider. In appropriate circumstances conforming to industry practice, this requirement may rely on and be satisfied by manufacturers’ warranties for equipment and separate contractors’ warranties for workmanship (i.e., installation). Warranties or service agreements conforming to requirements applicable to the Self-Generation Incentive Program (“SGIP”) may also be used for technologies eligible for the SGIP. 3.4 For Customers interconnecting a solar Generating Facility under the provisions of Schedule NEM-V-ST, all major solar system components (including PV panels and other generation equipment, inverters and meters) must be on the verified equipment list maintained by the California Energy Commission (“CEC”). For all NEM-V-ST Generating Facilities, any other equipment, as determined by SCE, must be verified as having safety certification from a Nationally Recognized Testing Laboratory (“NRTL”). 3.5 Customer cannot commence parallel operation of the Generating Facility until written approval has been provided to it by SCE. SCE shall normally provide such written approval no later than 30 business days following SCE’s receipt of (1) a completed Net Energy Metering Application including all supporting documents and required payments, (2) a completed signed Virtual Net Energy Metering Interconnection Agreement, and (3) evidence of the Application’s final electric inspection clearance from the Local Authority having jurisdiction over the Generating Facility. If the 30-day period cannot be met, SCE shall notify Applicant and the Commission of the reason for...

Related to GENERATING FACILITY INTERCONNECTION AND DESIGN REQUIREMENTS

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Interconnection Customer Interconnection Facilities Interconnection Customer shall design, procure, construct, install, own and/or control Interconnection Customer Interconnection Facilities described in Appendix A, Interconnection Facilities, Network Upgrades and Distribution Upgrades, at its sole expense.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • Technical and Interconnection Requirements 2.1 Consumer agrees that his Rooftop Solar PV System and Net Metering System will conform to the standards and requirements specified in the Policy, Regulations and Supply Code as amended from time to time.

  • CONNECTING TRANSMISSION OWNER’S INTERCONNECTION FACILITIES As depicted on the one-line diagram in Attachment 3, the Connecting Transmission Owner’s Interconnection Facilities consist of the following constructed or installed between the POI and PCO, as well as metering and telecommunications located at the Xxxxxx Road Collector Substation.