Interconnection Customer Interconnection Facilities Sample Clauses

Interconnection Customer Interconnection Facilities. Interconnection Customer shall design, procure, construct, install, own and/or control Interconnection Customer Interconnection Facilities described in Appendix A, Interconnection Facilities, Network Upgrades and Distribution Upgrades, at its sole expense.
AutoNDA by SimpleDocs
Interconnection Customer Interconnection Facilities. Engineering review and compliance verification of the ICIF, including all required drawings and equipment specifications reviews, relay settings, construction and testing assistance by engineering, field verification, and witness testing $75,500 Connecting Transmission Owner Interconnection Facilities (CTO IF) Engineering, design, construction, testing and commissioning for revenue metering and EMS-RTU at Collector Station and line tap. EMS-RTU & Rev. Metering $197,500 Line 309 Tap $910,600 CTO IF Subtotal $1,108,100 Inter. Facilities Subtotal $1,183,600 Contingency $290,400 INTER. FACILITIES TOTAL $1,474,000 As described in the Facilities Study for the Small Generating Facility, the estimates provided herein: Assume: • 5X10 construction work week; • outages are available; SERVICE AGREEMENT NO. 2556 • permitting is not required; and • existing equipment to remain is functional. Exclude (as applicable): • discussions and negotiations of issued interconnection study; • application fees; • applicable surcharges; • overall project sales tax; • property taxes; • line switching; • property/easement acquisitions; • future operation and maintenance costs; • recurring monthly communications circuits’ charges, if any, responsible by the Interconnection Customer to the communications utility; • soil testing; • adverse field conditions such as rock, water, weather, and Interconnection Customer electrical equipment obstructions; • environmental mitigation; • extended engineering to minimize outage time or Connecting Transmission Owner’s public duty to serve; • extended craft labor hours, to minimize outage and/or construction time; or • any required permits. Cost adders estimated for overtime will be based on 1.5 and 2 times labor rates if required for work beyond normal business hours. Meals and equipment are also extra costs incurred for overtime labor.
Interconnection Customer Interconnection Facilities. (ICIFs) As depicted in Attachment 3, Figure 1, the ICIFs will be located on property owned or leased by the Interconnection Customer, and, will consist of two (2) 4.16 kV feeder circuits (1 for the existing plant (“Plant 1”)(generators 1-3) and 1 for the new plant (“Plant 2”) (generators 4-7) that will bring the power from both facilities to new 4.16 kV switchgear, from which the power will be stepped up through a new Plant Step Up (“PSU”) Transformer Station, and interconnect to the electric system via the 34.5 kV switchgear. The ICIFs shall be designed constructed, operated, and maintained in accordance with the Connecting Transmission Owner’s Electric Service Bulletin 750 Series (“ESB 750s”) and Good Utility Practice.
Interconnection Customer Interconnection Facilities. 11.2 Distribution Provider’s Interconnection Facilities ............................. 11.3 Network Upgrades and Distribution Upgrades ..................................
Interconnection Customer Interconnection Facilities. Engineering review and compliance verification of the ICIF, including all required drawings and equipment specifications reviews, relay settings, construction and testing assistance by engineering, field $111,800 verification, and witness testing Connecting Transmission Owner Interconnection Facilities (CTO IF) Engineering, design, construction, testing and commissioning of: Revenue Metering and RTU $223,600 Line 6 Tap $2,942,500 CTO IF Subtotal $3,166,100 Subtotal $3,277,900 Contingency $805,900 TOTAL $4,083,800 As described in the Facilities Study for the Small Generating Facility, the estimates provided herein: Assume: • 5X10 construction work week; • outages are available; • permitting is not required; and • existing equipment to remain is functional. Exclude (as applicable): • discussions and negotiations of issued interconnection study; • application fees; • applicable surcharges; • overall project sales tax; • property taxes;
Interconnection Customer Interconnection Facilities. Engineering review and compliance verification of the ICIF, including all required drawings and equipment specifications reviews, relay settings, construction and testing assistance by engineering, fiel verification, and witness testing Connecting Transmission Owner Interconne Engineering, design, construction, testing a revenue metering and EMS-RTU at Coll As described in the Facilities Study for the Small Generating Facility, the estimates provided herein: Assume: • 5X10 construction work week; • outages are available; • permitting is not required; and • existing equipment to remain is functional. Exclude (as applicable): • discussions and negotiations of issued interconnection study; • application fees; • applicable surcharges; • overall project sales tax; • property taxes; • line switching; • property/easement acquisitions; • future operation and maintenance costs; • recurring monthly communications circuits’ charges, if any, responsible by the Interconnection Customer to the communications utility; • soil testing; • adverse field conditions such as rock, water, weather, and Interconnection Customer electrical equipment obstructions; • environmental mitigation; • extended engineering to minimize outage time or Connecting Transmission Owner’s public duty to serve; • extended craft labor hours, to minimize outage and/or construction time; or • any required permits. Cost adders estimated for overtime will be based on 1.5 and 2 times labor rates if required for work beyond normal business hours. Meals and equipment are also extra costs incurred for overtime labor.
Interconnection Customer Interconnection Facilities. Metering Interconnection Customer Interconnection Facilities will include, but are not limited to, the following items:
AutoNDA by SimpleDocs
Interconnection Customer Interconnection Facilities. Engineering review and compliance verification of the ICIF, including all required drawings and equipment specifications reviews, relay settings, construction and testing assistance by engineering, field verification, and witness testing $111,800 Connecting Transmission Owner Interconnection Facilities (CTO IF) Engineering, design, construction, testing and commissioning for: Revenue metering and EMS-RTU $280,500 Line 18 Tap $1,540,400 CTO IF Subtotal $1,820,900 Subtotal $1,932,700 Contingency $330,800 TOTAL W/ ELECTIVE SUF $2,263,500 The estimates provided above assume: • outages are available; • permitting is not required; and • existing equipment to remain is functional. In addition, the estimates provided herein exclude, as applicable: • discussions and negotiations of issued interconnection study; • application fees;
Interconnection Customer Interconnection Facilities. Energy Management System Interconnection Customer Interconnection Facilities will include, but are not limited to, the following items:
Interconnection Customer Interconnection Facilities. Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer Interconnection Facilities described in Appendix A (Interconnection Facilities, Network Upgrades and Distribution Upgrades) at its sole expense. The Parties acknowledge and agree that certain Interconnection Customer Interconnection Facilities described in Appendix A are in place as of the Effective Date. To the extent that Interconnection Facilities, Stand Alone Network Upgrades, or Network Upgrades are designed, procured, constructed, or installed after the Effective Date, the provisions of this Articles 11.1 shall apply to such design, procurement, construction, and installation.