Drug Testing (A) The state and the PBA agree to drug testing of employees in accordance with section 112.0455, F.S., the Drug-Free Workplace Act.
Test The outer surface of the lamp lenses shall be subjected once or more than once to the action of the sand jet produced as described above. The jet shall be sprayed almost perpendicular to the surface to be tested. The deterioration shall be checked by means of one or more samples of glass placed as a reference near the lenses to be tested. The mixture shall be sprayed until the variation in the diffusion of light on the sample or samples measured by the method described in Appendix 2, is such that: Δ d = (T5 - T4) / T2 ≤ 0.0250 ± 0.0025 Several reference samples may be used to check that the whole surface to be tested has deteriorated homogeneously. Annex 6 - Appendix 4
Drug Test The compulsory production and submission of urine and/or blood, in accordance with departmental procedures, by an employee for chemical analysis to detect prohibited drug usage.
Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.
Drug Test Results 1. All records pertaining to department-required drug tests shall remain confidential, and shall not be provided to other employers or agencies without the written permission of the person whose records are sought. However, medical, administrative, and immediate supervisory personnel may have access to relevant portions of the records as necessary to insure the acceptable performance of the officer's job duties.
Tests on Completion (i) At least 30 (thirty) days prior to the likely completion of the Project Highway, or a Section thereof, the Contractor shall notify the Authority’s Engineer of its intent to subject the Project Highway or a Section thereof, to Tests. The date and time of each of the Tests shall be determined by the Authority’s Engineer in consultation with the Contractor, and notified to the Authority who may designate its representative to witness the Tests. The Contractor shall either conduct the Tests as directed by the Authority’s Engineer or provide such assistance as the Authority’s Engineer may reasonably require for conducting the Tests. In the event of the Contractor and the Authority’s Engineer failing to mutually agree on the dates for conducting the Tests, the Contractor shall fix the dates by giving not less than 10 (ten) days’ notice to the Authority’s Engineer.
Minimum Shipping Requirements for TIPS Sales Vendor shall ship, deliver, or provide ordered goods and services within a commercially reasonable time after acceptance of the order. If a delay in delivery is anticipated, Vendor shall notify the TIPS Member as to why delivery is delayed and provide an updated estimated time for completion. The TIPS Member may cancel the order if the delay is not commercially acceptable or not consistent with the Supplemental Agreement applicable to the order.
ODUF Testing 6.6.1 Upon request from TWTC, AT&T shall send ODUF test files to TWTC. The Parties agree to review and discuss the ODUF file content and/or format. For testing of usage results, AT&T shall request that TWTC set up a production (live) file. The live test may consist of TWTC’s employees making test calls for the types of services TWTC requests on ODUF. These test calls are logged by TWTC, and the logs are provided to AT&T. These logs will be used to verify the files. Testing will be completed within thirty (30) days from the date on which the initial test file was sent.
Training Purpose Type Insert the purpose for taking this course or program using the appropriate training purpose type code. Code 01
Ongoing Trunk Forecast Requirements Where the Parties have already established interconnection in a LATA, Onvoy shall provide a new or revised traffic forecast that complies with the Frontier Interconnection Trunking Forecast Guide when Xxxxx develops plans or becomes aware of information that will materially affect the Parties’ interconnection in that LATA. Instances that require a new or revised forecast include, but are not limited to: (a) Onvoy plans to deploy a new switch; (b) Onvoy plans to implement a new POI or network architecture; (c) Onvoy plans to rearrange its network; (d) Onvoy plans to convert a One-Way Interconnection Trunk group to a Two-Way Interconnection Trunk group; (e) Onvoy plans to convert a Two-Way Interconnection Trunk group to a One-Way Interconnection Trunk group; or (f) Onvoy expects a significant change in interconnection traffic volume. In addition, upon request by either Party, the Parties shall meet to: (i) review traffic and usage data on End Office and Tandem Interconnection Trunk groups and (ii) determine whether the Parties should establish new Interconnection Trunk groups, augment existing Interconnection Trunk groups, or disconnect existing Interconnection Trunks.