Site Memorandum Sample Clauses

Site Memorandum. The Design Professional agrees to comply fully with the requirements of the attached Exhibit F, Site Memorandum. The Design Professional agrees to notify the Owner, at once and in any event within ten calendar days after execution of this Contract, of the amount of money the Owner should budget in order to cover costs identified in the Site Memorandum. The Design Professional agrees that, without cost to the Owner, the Design Professional shall make such proper and reasonable changes in the Site Plan and preliminary foundation design that are either necessary or desirable as required by the Stage One statement and subsequent investigation by the geotechnical engineer (see Subparagraph 1.1.2.6.3) obtained pursuant to the Site Memorandum. All information should be incorporated into the final Site Plan and final foundation design for the Stage Two statement. The Design Professional shall file copies with the Owner and accompany them with a current Statement of Probable Construction Cost, in the format shown in the Forms Packet, as a part of the next submittal required by this Contract. (See ASTM Standard Practice E 1804-02, August 2002, Section 8.4 for guidance on information which is generally developed in site development documents.)
AutoNDA by SimpleDocs
Site Memorandum. The Site Memorandum of the Design Professional should include the information developed above in a single document reporting the following:
Site Memorandum. NOTE: See also Reference 1, The Policy, for instructions and guidelines on completing the Site Memorandum.
Site Memorandum. The Design Professional agrees to comply fully with the requirements of the attached Exhibit G, Site Memorandum. The Design Professional agrees to notify the Owner, at once and in any event within ten calendar days after execution of this Contract, of the amount of money the Owner should budget in order to cover costs identified in the Site Memorandum. The Design Professional agrees that, without cost to the Owner, the Design Professional shall make such proper and reasonable changes in the Site Plan and preliminary foundation design that are either necessary or desirable as required by the Stage One statement and subsequent investigation by the geotechnical engineer (see Subparagraph 1.1.2.6.3) obtained pursuant to the Site Memorandum. All information should be incorporated into the final Site Plan and final foundation design for the Stage Two statement. The Design Professional shall file copies with the Owner and accompany them with a current Statement of Probable Construction Cost, in the format shown at Exhibit F, as a part of the next submittal required by this Contract.
Site Memorandum. 10.4.1 The Authority and the Concessionaire shall, on a mutually agreed date and time (but not later than the timeline specified below for the execution of the Site Memorandum), inspect the Site and prepare a memorandum containing an inventory of the Site including the vacant land, buildings, structures, road works, trees and any other immovable property on or attached to the Site (as applicable), free from any Encumbrance (“Site Memorandum”). The Authority and the Concessionaire shall execute the Site Memorandum in 2 (two) counterparts (each of which shall constitute an original) within 10 (ten) days of execution of Xxxxx Xxxx. In case of any disagreement between the Concessionaire and the Authority in relation to the survey and the inventory, the decision of the Authority shall prevail.
Site Memorandum. 10.4.1 The Authority and the Concessionaire shall, on a mutually agreed date and time (but not later than the timeline specified below for the execution of the Site Memorandum), inspect the Site and prepare a memorandum containing an inventory of the Site including the vacant land, buildings, structures, road works, trees and any other immovable property on or attached to the Site (as applicable), free from any Encumbrance (“Site Memorandum”). The Authority and the Concessionaire shall execute the Site Memorandum in 2 (two) counterparts (each of which shall constitute an original) within 10 (ten) days of execution of {Lease Deed}18. In case of any disagreement between the Concessionaire and the Authority in relation to the survey and the inventory, the decision of the Authority shall prevail. 13Note: To be retained in case lease of the Site is granted . 14 Note: To be retained in case lease of the Site is granted. 15Note: To be retained in case lease of the Site is granted. 16 Note: To be retained in case lease of the Site is granted. 17 Note: To be retained in case lease of the Site is granted. 18 Note: To be retained in case lease of the Site is granted.
Site Memorandum. In furtherance of Article 6 of the present agreement, the Architect/Engineer agrees to comply fully with the requirements of the attached SITE MEMO­RANDUM. The Architect/Engineer agrees to notify the Owner at once, and in any event within ten days after execution of the present agreement, the amount of money which it shall be necessary to budget for the purpose of complying with the above­mentioned site memorandum. The Architect/Engineer agrees that without cost to the Owner he shall make such proper and reasonable changes in the design as the Stage One and Stage Two statement obtained pursuant to the site memorandum disclose are either necessary or desirable. The Archi­tect/En­gineer immediately upon their receipt shall file with the Owner copies of the Stage One and Stage Two statements of the soil engineer accompa­nied by a current budget certificate.
AutoNDA by SimpleDocs
Site Memorandum. The Design Professional agrees to comply fully with the requirements of the attached Exhibit G, Site Memorandum, and the related requirements of Reference 1, The Policy. The Design Professional agrees to notify the Owner, at once and in any event within ten calendar days after execution of this Contract, of the amount of money the Owner should budget in order to cover costs identified in the Site Memorandum. The Design Professional agrees that, without cost to the Owner, the Design Professional shall make such proper and reasonable changes in the Site Plan and preliminary foundation design that are either necessary or desirable as required by the Stage One statement and subsequent investigation by the geotechnical engineer (see Subparagraph 1.1.2.6.3) obtained pursuant to the Site Memorandum. All information should be incorporated into the final Site Plan and final foundation design for the Stage Two statement. The Design Professional shall file copies with the Owner and accompany them with a current Statement of Probable Construction Cost, in the format shown at Exhibit F, as a part of the next submittal required by this Contract. (See ASTM Standard Practice E 1804-02, August 2007, Section 8.4 for guidance on information which is generally developed in site development documents.)

Related to Site Memorandum

  • PARTIES TO MEMORANDUM OF UNDERSTANDING This Memorandum of Understanding (hereinafter referred to as "MOU") is entered into on April 6, 2014, and amended on March 31, 2016 between the City Administrative Officer (CAO), as authorized management representative of the City Council, and the authorized management representatives of any City Departments in which classifications listed in the Appendices may be employed (hereinafter referred to as "Management") and authorized representatives of the Engineers and Architects Association (“EAA” or "Association") as the exclusive recognized employee organization for the Supervisory Administrative Unit.

  • TERM OF MEMORANDUM An employee who has properly withdrawn membership as provided herein shall not be subject to the provisions of this section.

  • Disclosure Documents 6.3 You and your agents shall not give any information or make any representations or statements on behalf of the Trust or concerning the Trust, the Underwriter or an Adviser, other than information or representations contained in and accurately derived from the registration statement or prospectus for the Trust shares (as such registration statement and prospectus may be amended or supplemented from time to time), annual and semi-annual reports of the Trust, Trust-sponsored proxy statements, or in Sales Literature/Promotional Material created by us for the Trust and provided by the Trust or its designee to you, except as required by legal process or regulatory authorities or with the written permission of the Trust or its designee.

  • TERM OF MEMORANDUM OF UNDERSTANDING This MOU shall be effective July 1, 2020 and together with all the terms, conditions and effects thereof, shall expire as of midnight on June 30, 2021.

  • MEMORANDUM At the sale by Public Auction this 14th day of March, 2022 of the Property comprised in the foregoing particulars that is to say the rights, title, interest and benefits to the said Property pursuant to the Sale & Purchase Agreement dated the 28th day of December, 2015 and made between CHAMPION PRIORITY SDN BHD (1024429- U) (The Vendor) and XXX XXXXX BENG (The Purchaser) absolutely assigned to the Assignee/Lender pursuant to and under the Facilities Agreement, Deed of Assignment and Power of Attorney all dated 19th day of January, 2016 entered into between AmBank (M) Berhad [196901000166 (8515-D)] and the Assignor/Borrower in relation to the Subject Property identified as Developer’s Parcel No. SG/D/28/05, Storey No. Twenty Eight Floor, Building No. Block D, Seasons Garden and bearing postal address Unit No. D-28-5, Block D, Residensi Lot 7 (Seasons Garden), Xxxxx 0/00X, Xxxxxxx 00, Xxxxxx Xxxx, 00000 Xxxxx Xxxxxx, developed by CHAMPION PRIORITY SDN BHD (1024429- U) and the highest bidder for the said Property shall be declared as the Purchaser of the said Property for the sum of RM and a sum of RM has been paid to the Assignee/Lender by way of deposit and agrees to pay the balance of the Purchase Money and complete and purchase according to the conditions and the said Auctioneer hereby confirms the said purchase and the Assignee/Xxxxxx acknowledge the receipt of the said deposit. Purchase Money : RM Deposit Paid : RM Balance Due : RM ‌‌ SIGNATURE OF PURCHASER(S)/AUTHORISED AGENT SIGNATURE SIGNATURE For Messrs. Ehsan Auctioneers Sdn. Bhd. For Messrs. Zain Megat & Xxxxx Xxxx’ Xxxx Xxxxx Xxxxx Bin X.X. Xxxx (D.I.M.P) SOLICITOR FOR THE ASSIGNEE / Xxxxx Xxxxx Bin Xxxxxx LICENSED AUCTIONEERS ONLINE TERMS AND CONDITIONS The Terms and Conditions specified herein shall govern all members of xxx.xxxxxxxxxxxxxxxx.xxx (“EHSAN AUCTIONEERS SDN. BHD. website”).

  • Offering Circular The Xxxxxxx Mac STACR® Debt Notes, Series 2015-HQ2 Offering Circular dated June 2, 2015 (including any related Supplement thereto).

  • CALENDAR FOR SUCCESSOR MEMORANDUM OF UNDERSTANDING In the event Union or Management desires a successor MOU, said party shall serve upon the other between April 1, 2018 and April 30, 2018, its written proposals for such successor MOU. Meet and confer sessions shall begin no later than thirty (30) calendar days following submittal of the proposals.

  • Construction Schedules 10.1 Within seven (7) days of the University’s issuance of a purchase order, the Contractor shall submit to the Project Coordinator three (3) copies of a Construction Schedule for this Project. The Schedule shall be in bar chart form and shall include all aspects of the work, the interrelationship of the various trades and the critical path of the job. The schedule shall include a timeline for the submission, review and approval of shop drawings for critical path items and delivery and installation dates for those same critical path, or long lead time items, (such as electrical transformers and elevator). The Schedule shall coincide with the Contractor’s approved Schedule of Values. The Schedule shall indicate a completion date in advance of the date established for Substantial Completion. The Schedule shall be acceptable to the Architect/Engineer and the Project Coordinator. It shall be revised and reissued at the beginning of every month for the duration of the project. This monthly update progress Schedule shall include a summary comparison of the original schedule and the latest updated schedule (previous month) showing all activity description and dates. These comparison schedules shall be in the form of a summary bar chart, an activity listing report and actual to target comparisons. The reports may include critical activities, float time, duration of each activity, dates of each activity and the network logic (including successors and predecessors of each activity). Included with the written report and electronic copy of the schedule submission noting the above referenced requirements. Failure to provide the Architect/Engineer, or the Project Coordinator with an acceptable, revised Schedule, within seven (7) days of the receipt of a written request, may result in the withholding of the Contractor’s monthly progress payments until such a Schedule is received.

  • Preliminary Engineering In order to receive City review and approval of the Extensions, Developer shall furnish two (2) copies of the plat map, topographic map and proposed roads profile sheets in electronic format prior to the City’s ordering of the engineering plans from its Engineer. The contour elevation and road profile elevations shall be referenced to NAVD ‘88 datum. In the event Developer’s engineer prepares the construction plans and specifications, the above information shall be a part of the extension construction plans to be reviewed and approved by the City’s Engineer. The final plat map shall be to the scale of 1-inch = 20 feet. The contour map shall have a scale of 1-inch = 20 feet and contour intervals of two (2) feet or less. The road profile sheets shall be to the scale of 1-inch = 20 feet. Developer shall provide a minimum of one benchmark, datum being NAVD ‘88, on the project site; and the elevation and location of the benchmark shall be indicated on the maps furnished by Developer.

  • Construction Schedule The progress schedule of construction of the Project as provided by Developer and approved by District.

Time is Money Join Law Insider Premium to draft better contracts faster.