Submittal Procedures. 10.19.4.1 Before submitting each Shop Drawing or Sample, Contractor shall have determined and verified:
AutoNDA by SimpleDocs
Submittal Procedures. Contractor shall transmit each item using Owner’s standard format. Contractor shall identify the project by Owner’s assigned project number, Contractor, Subcontractor and supplier. Contractor shall identify pertinent drawing sheet and detail number and specification section number as appropriate. Contractor shall transmit submittals to Owner and Architect/Engineer as determined in the Pre-Construction Conference.
Submittal Procedures. 1. Before submitting each Shop Drawing or Sample, CONTRACTOR shall have determined and verified:
Submittal Procedures. In consultation with the District and the Project Manager, Architect shall assist in the development and implementation of forms, documents and procedures for the handling, review and processing of Submittals required for the Work.
Submittal Procedures. The Construction Manager shall establish and implement procedures with the Architect and coordinate and review shop drawing submittals, requests for information, samples, product data, change orders, payment requests, material delivery dates and other procedures; and maintain logs, files and other necessary documentation. Construction Manager shall assist the Architect and the District’s inspector with monitoring the certified payroll for the Project. The Construction Manager shall coordinate the dissemination of any information regarding submittals and consult with the Architect and the District if any Contractor requests interpretations of the meaning and intent of the Contract Documents, and assist in the resolution of questions which may arise.
Submittal Procedures. The Construction Manager shall establish and implement procedures with the Architect and coordinate and review shop drawing submittals, requests for information, samples, product data, change orders, payment requests, material delivery dates and other procedures; and maintain logs, files and other necessary documentation. Construction Manager shall assist the Architect and the District’s inspector with confirming all contractors and subcontractors submit certified payroll records to the Labor Commissioner in accordance with Labor Code section on at least on a monthly basis (or more frequently if required by the District or the Labor Commissioner). The Construction Manager shall coordinate the dissemination of any information regarding submittals and consult with the Architect and the District if any Contractor requests interpretations of the meaning and intent of the Contract Documents, and assist in the resolution of questions which may arise.
Submittal Procedures. A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
AutoNDA by SimpleDocs
Submittal Procedures. A. General Submittal Procedure Requirements: Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual Specification Sections.
Submittal Procedures l. Preparation of record documents.
Submittal Procedures. Preliminary Shop Drawing Data: Within 20 days after the Award of the Contract the Design-Build Firm shall submit to the Project Manager a complete listing of manufacturers for all items for which shop drawings are to be submitted. Shop Drawing Submittal Schedule: Within 30 days after the Notice to Proceed, the Design-Build Firm shall submit to the Project Manager a complete schedule of shop drawing submittals fixing the respective dates for submission, the beginning of manufacture, testing, and installation of materials, supplies and equipment, noting those submittals critical to the progress schedule. Submittal Log: An accurate updated log of submittals maintained by the Design-Build Firm and subject to review by the City at each scheduled progress meeting. When reviewed by the City each of the shop drawings will be identified as having received such review, being so stamped and dated. Shop drawings stamped "REJECTED" will be returned to the Design-Build Firm for correction and re-submittal with the required correction indicated on the shop drawing or listed on a "Shop Drawing Review sheet”. If submitted drawings or schedules show a departure or variation from the Contract Requirements which are in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. If the Design-Build Firm makes a determination that conflicts with any part of the Design Criteria Package, the Design-Build Firm shall give written notice thereof to the Project Manager. This does not constitute a change order until accepted by the City. Re-submittals will be handled in the same manner as first submittals. On re-submittals, the Design-Build Firm shall direct specific attention on the transmittal and on re-submitted shop drawings to revisions other than the corrections requested by the Project Manager on previous submissions. The Design-Build Firm shall make any corrections required by the Project Manager. The Project Manager will review a Submittal/re-submittal a maximum of two (2) times after which the cost of review will be borne by the Design-Build Firm at the Project Manager’s standard hourly rate. No partial submittals will be reviewed. Submittals not complete will be returned to the Design-Build Firm, and will be considered "Rejected" until properly resubmitted. Design-Build Firm shall submit a minimum of five (5) sets, plus additional sets as required by ...