Specific Project Description Sample Clauses

Specific Project Description. Contractor shall provide a new bowl assemble in accordance with Fee Schedule Item 111 and Item 1.02, hereafter. Specific pumping unit related work to be performed as part of this project is identified in the Fee Schedule-Scope of Work, Well 26 Pumping Unit Repair Special Requirements, and generally described as follows:  Provide temporary facilities as necessary for removal of pumping facilities. In the event the Vendor proposes to land the pumping unit on the top of the below grade vault during the removal process, the Vendor shall provide a temporary support system (i.e. steel beams, etc.) which bridge the top of the vault lid to provide pumping unit support without loading said vault lid. Specifically, support shall at least reach from vault side wall to vault side wall (approximately 18’-6”).  Remove existing Well 26 pumping unit equipment including 400 horsepower 480 volt 3 phase electric motor, discharge head, 647’± of column, tube and line shaft (including couplings, centering spiders, and bearings) for oil lubricated pumping unit. Tag well to determine presence of fill.  Inspect and provide comments and/or recommendations regarding serviceability of existing pump column, tube, and shaft.  Deliver the District’s existing 400 hp electric motor from the Well 26 project site to the District’s electrical repair vendor, Brithinee Electric. District will arrange and pay for Brithinee Electric to inspect and perform a full spectrum vibration analysis on the existing motor and make any repairs deemed necessary to the motor. Brithinee Electric is located at 000 Xxxxx Xxxxxx Xxxxxx in the City of Colton, Ca.  Haul Column, Tube, and Shaft and pump bowl assembly to Vendor yard for evaluation regarding condition and serviceability of the column, tube, and shaft.  Recondition (as required) 647’± of existing 12" pump column.  Disassemble and inspect pump bowl assembly. Measure and record wear and damage. Provide report and recommendations to District of bowl conditions and refurbishment options (this work is to be completed in order for the District to access the existing bowl condition only, upon completion of this work, the District will then make the decision whether to rebuild the existing bowl assembly or replace said existing bowl assembly with a new bowl assembly). In the event the District elects to replace the existing bowl assembly, said existing bowl assembly shall be delivered from the Vendors place of disassembly to the District’s Well 2 site ...
AutoNDA by SimpleDocs
Specific Project Description. Contractor shall remove existing pumping unit including discharge head, column, tube, shaft, and bowl assemble in accordance with Fee Schedule and as described in the special requirements. Specification Section is provided as a reference for work activities related to pumping unit removal and installation, and startup requirements. Specific work to be performed as part of this project is identified in the Fee Schedule-Scope of Work, Well 22 Placement of Gravel Seal, Bentonite Plug, and Cement Cap Special Requirements.
Specific Project Description. Contractor shall provide a new bowl assemble, as necessary for Well 12 and 19 in accordance with Schedule I and II, Fee Schedule Items 110 and 113 and Item 1.02, hereafter. Specific pumping unit related work to be performed as part of this project is identified in the Schedule I- Well 12 Fee Schedule-Scope of Work. Schedule II well 19 fee schedule – Scope of Work Well 12 and 19. Pumping Unit Repair Special Requirements, and generally described as follows: In the event the existing pumping unit is deemed non re-buildable Contractor shall provide up to two
Specific Project Description. A. Design Guidelines-The project shall be designed in accordance with the site, building and sign design standards set forth in the Freeway Tourist Design Standards – March 2014. Such design standards are minimal standards and may be enhanced as provided in “Urban Design Features” (C. 3. below).

Related to Specific Project Description

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • Site Description 2.5.1 If reasonably requested by the A/E as necessary for the Project, the Owner shall furnish a legal description and a certified land survey of the Site, giving, as applicable, grades and lines of streets, alleys, pavements and adjoining property; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the Site; locations, dimensions, and complete data pertaining to existing buildings, other improvements, and trees; and full information concerning available service and utility lines, both public and private, above and below grade, including inverts and depths.

  • Project Summary The main objective of the LIFE GAIA Sense project is to demonstrate Gaiasense, an innovative “Smart Farming” (SF) solution that aims at reducing the consumption of natural resources, as a way to protect the environment and support Circular Economy (CE) models. More specifically, this project will launch 18 demonstrators across Greece, Spain and Portugal covering 9 crops (olives, peaches, cotton, pistachio, potatoes, table tomatoes, industrial tomatoes, grapes, kiwi) in various terrain and microclimatic conditions. They will demonstrate an innovative method, based on high-end technology, which is suitable for being replicated and will be accessible and affordable to Farmers either as individuals or collectively through Agricultural Cooperatives. Moreover, LIFE GAIA Sense aims to promote resource efficiency practices in SMEs of the agricultural sector and eventually, contribute to the implementation of the Roadmap to a Resource Efficient Europe. This project will demonstrate a method on how the farmer will be able to decide either to use or avoid inputs (irrigation, fertilizers, pesticides etc.) in a most efficient way, without risking the annual production. The focus is on the resource consumption reduction side of CE, and the results will be both qualitatively and quantitatively, considering the resources’ efficiency in agricultural sector.

  • Work Description T-804 Opening Roads - Removal of closure devices, cleaning ditches, removing berms, and blading the traveled-way T-811 Closing Roads - Entrance treatment for 150' cross-rip; debris block (slash, earth, berm, rocks, etc.) + seed + water bar T-811 Closing Roads - Water bar frequency per BMPs for remainder of road T-811 Closing Roads - Engineering Rep. or Construction Inspector must be notified prior to performing closeout NFSR Road No. Lane Width & Maintenance Level Mile Marker Begin End 9312 Single Lane / Level 1 NFSR 300 0.00 END 0.40

  • SERVICE LEVEL DESCRIPTION The Fund Accounting Agreement is hereby amended by deleting the Service Level Description attached thereto and replacing it in its entirety with the Service Level Description attached hereto.

  • Specific Provisions 4.1 Unless the CERT otherwise agrees, based on exceptional circumstance and sufficient justification, Implementing Agreements shall be for an initial term of up to, but no more than, five years.

  • State Specific Provisions N/A. ATTACHED EXHIBIT. The Exhibit noted below, if marked with an "X" in the space provided, is attached to this Note: X Exhibit A Modifications to Multifamily Note

  • Property Description A document prepared as an exhibit for the conveyance of a property interest, reflecting a boundary survey, signed and sealed by a Registered Professional Land Surveyor (RPLS), attached to an acquisition deed as Exhibit A, and consists of the following two (2) parts:

  • Specific Provision The grievant shall cite on the grievance form the specific article(s) and/or section(s) or combination thereof that the grievant alleges to have been violated. Failure to cite said provision(s) shall relieve the Employer of any obligation to process the grievance.

  • Overtime Description Overtime Wage paid at time and one half the regular rate For "A" rated Apprentices (work in excess of 7 hours per day) For "M" rated Apprentices (work in excess of 8 hours per day) (Local #3) ELEVATOR CONSTRUCTOR‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 2) Elevator (Constructor) - First Year Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $26.94 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $28.41 Elevator (Constructor) - Second Year Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Rate Per Hour: $27.35 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Rate Per Hour: $28.84 Elevator (Constructor) - Third Year Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Rate Per Hour: $28.17 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Rate Per Hour: $29.69 Elevator (Constructor) - Fourth Year Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Rate Per Hour: $29.00 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Rate Per Hour: $30.54 (Local #1) ELEVATOR REPAIR & MAINTENANCE‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 2) Elevator Service/Modernization Mechanic (First Year) Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Benefit Per Hour: $26.87 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Benefit Per Hour: $28.34 Elevator Service/Modernization Mechanic (Second Year) Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Benefit Per Hour: $27.27 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Benefit Per Hour: $28.76 Elevator Service/Modernization Mechanic (Third Year) Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Benefit Per Hour: $28.08 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Benefit Per Hour: $29.60 Elevator Service/Modernization Mechanic (Fourth Year) Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Benefit Per Hour: $28.89 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Benefit Per Hour: $30.43 (Local #1) ENGINEER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 5) Engineer - First Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $23.68 Supplemental Benefit Rate per Hour: $22.55 Engineer - Second Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $29.60 Supplemental Benefit Rate per Hour: $22.55 Engineer - Third Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $32.56 Supplemental Benefit Rate per Hour: $22.55 Engineer - Fourth Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $35.52 Supplemental Benefit Rate per Hour: $22.55 (Local #15) ENGINEER - OPERATING‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 5) Operating Engineer - First Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour 40% of Journeyperson's Rate Supplemental Benefit Per Hour: $20.15 Operating Engineer - Second Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's Rate Supplemental Benefit Per Hour: $20.15 Operating Engineer - Third Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 60% of Journeyperson's Rate Supplemental Benefit Per Hour: $20.15 (Local #14) FLOOR COVERER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Floor Coverer (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 40% of Journeyperson's rate Supplemental Rate Per Hour: $31.14 Floor Coverer (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $31.14 Floor Coverer (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Rate Per Hour: $31.14 Floor Coverer (Fourth Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 80% of Journeyperson's rate Supplemental Rate Per Hour: $31.14 (Carpenters District Council) XXXXXXX‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Xxxxxxx (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 40% of Journeyperson's rate Supplemental Rate Per Hour: $13.64 Effective 11/1/2015 - Supplemental Rate Per Hour: $13.79 Xxxxxxx (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $22.97 Effective 11/1/2015 - Supplemental Rate Per Hour: $23.13 Xxxxxxx (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 60% of Journeyperson's rate Supplemental Rate Per Hour: $25.87 Effective 11/1/2015 - Supplemental Rate Per Hour: $26.03 Xxxxxxx (Fourth Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 80% of Journeyperson's rate Supplemental Rate Per Hour: $31.04 Effective 11/1/2015 - Supplemental Rate Per Hour: $31.29 (Local #1281) HEAT & FROST INSULATOR‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Heat & Frost Insulator (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 40% of Journeyperson's rate Heat & Frost Insulator (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 60% of Journeyperson's rate Heat & Frost Insulator (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 70% of Journeyperson's rate Heat & Frost Insulator (Fourth Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 80% of Journeyperson's rate (Local #12) HOUSE WRECKER‌ (TOTAL DEMOLITION) (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) House Wrecker - First Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $21.17 Supplemental Benefit Rate per Hour: $17.33 House Wrecker - Second Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $22.32 Supplemental Benefit Rate per Hour: $17.33 House Wrecker - Third Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $23.97 Supplemental Benefit Rate per Hour: $17.33 House Wrecker - Fourth Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $26.53 Supplemental Benefit Rate per Hour: $17.33 (Xxxxx Tenders District Council) IRON WORKER - ORNAMENTAL‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Iron Worker (Ornamental) - 1st Ten Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $36.50 Iron Worker (Ornamental) - 11 -16 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Rate Per Hour: $37.62 Iron Worker (Ornamental) - 17 - 22 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 60% of Journeyperson's rate Supplemental Rate Per Hour: $38.73 Iron Worker (Ornamental) - 23 - 28 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 70% of Journeyperson's rate Supplemental Rate Per Hour: $40.97 Iron Worker (Ornamental) - 29 - 36 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 80% of Journeyperson's rate Supplemental Rate Per Hour: $43.20 (Local #580) IRON WORKER - STRUCTURAL‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 6) Iron Worker (Structural) - 1st Six Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $25.48 Supplemental Benefit Rate per Hour: $46.83 Iron Worker (Structural) - 7- 18 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $26.08 Supplemental Benefit Rate per Hour: $46.83 Iron Worker (Structural) - 19 - 36 months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $26.68 Supplemental Benefit Rate per Hour: $46.83 (Local #40 and #361) LABORER (FOUNDATION, CONCRETE, EXCAVATING, STREET PIPE LAYER & COMMON)‌ (Ratio Apprentice to Journeyperson: 1 to 1, 1 to 3) Laborer (Foundation, Concrete, Excavating, Street Pipe Layer & Common) - First 1000 hours Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $36.53 Laborer (Foundation, Concrete, Excavating, Street Pipe Layer & Common) - Second 1000 hours Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 60% of Journeyperson's rate Supplemental Rate Per Hour: $36.53 Laborer (Foundation, Concrete, Excavating, Street Pipe Layer & Common) - Third 1000 hours Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Rate Per Hour: $36.53 Laborer (Foundation, Concrete, Excavating, Street Pipe Layer & Common) - Fourth 1000 hours Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 90% of Journeyperson's rate Supplemental Rate Per Hour: $36.53 (Local #731) MARBLE MECHANICS‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Cutters & Setters - First 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 50% of Journeyperson's rate NO BENEFITS PAID DURING THE FIRST TWO MONTHS (PROBATIONARY PERIOD) Cutters & Setters - Second 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 55% of Journeyperson's rate Cutters & Setters - Third 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 65% of Journeyperson's rate Cutters & Setters - Fourth 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 75% of Journeyperson's rate Cutters & Setters - Fifth 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 85% of Journeyperson's rate Cutters & Setters - Sixth 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 95% of Journeyperson's rate Polishers & Finishers - First 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 50% of Journeyperson's rate NO BENEFITS PAID DURING THE FIRST TWO MONTHS (PROBATIONARY PERIOD) Polishers & Finishers - Second 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 60% of Journeyperson's rate Polishers & Finishers - Third 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 75% of Journeyperson's rate Polishers & Finishers - Fourth 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 90% of Journeyperson's rate (Local #7) XXXXX TENDER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Xxxxx Xxxxxx - First Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $21.39 Supplemental Benefit Rate per Hour: $18.44 Xxxxx Xxxxxx - Second Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $22.54 Supplemental Benefit Rate per Hour: $18.44 Xxxxx Xxxxxx - Third Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $24.29 Supplemental Benefit Rate per Hour: $18.49 Xxxxx Xxxxxx - Fourth Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $26.95 Supplemental Benefit Rate per Hour: $18.49 (Local #79) METALLIC LATHER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Metallic Lather (First Year -Called Prior to 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $29.41 Supplemental Benefit Rate per Hour: $22.89 Metallic Lather (Second Year - Called Prior to 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $34.01 Supplemental Benefit Rate per Hour: $24.54 Metallic Lather (Third Year - Called Prior to 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $39.07 Supplemental Benefit Rate per Hour: $25.69 Metallic Lather (First Year -Called On Or After 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $23.01 Supplemental Benefit Rate per Hour: $17.95 Metallic Lather (Second Year - Called On Or After 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $28.11 Supplemental Benefit Rate per Hour: $17.95 Metallic Lather (Third Year - Called On Or After 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $33.21 Supplemental Benefit Rate per Hour: $17.95 (Local #46) MILLWRIGHT‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Xxxxxxxxxx (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $27.23 Supplemental Benefit Rate per Hour: $34.06 Xxxxxxxxxx (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $32.18 Supplemental Benefit Rate per Hour: $37.62 Xxxxxxxxxx (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $37.13 Supplemental Benefit Rate per Hour: $41.83 Xxxxxxxxxx (Fourth Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $47.03 Supplemental Benefit Rate per Hour: $48.31 (Local #740) PAVER AND ROADBUILDER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Paver and Roadbuilder - First Year (Minimum 1000 hours) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $27.05 Supplemental Benefit Rate per Hour: $17.12 Paver and Roadbuilder - Second Year (Minimum 1000 hours) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $28.69 Supplemental Benefit Rate per Hour: $17.12 (Local #1010) PAINTER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Painter - Brush & Roller - First Year Effective Period: 7/1/2015 - 10/31/2015 Wage Rate per Hour: $15.80 Supplemental Benefit Rate per Hour: $11.88 Effective Period: 11/1/2015 - 6/30/2016 Wage Rate per Hour: $16.40 Supplemental Benefit Rate per Hour: $12.13 Painter - Brush & Roller - Second Year Effective Period: 7/1/2015 - 10/31/2015 Wage Rate per Hour: $19.75 Supplemental Benefit Rate per Hour: $15.73 Effective Period: 11/1/2015 - 6/30/2016 Wage Rate per Hour: $20.50 Supplemental Benefit Rate per Hour: $15.98 Painter - Brush & Roller - Third Year Effective Period: 7/1/2015 - 10/31/2015 Wage Rate per Hour: $23.70 Supplemental Benefit Rate per Hour: $18.64 Effective Period: 11/1/2015 - 6/30/2016 Wage Rate per Hour: $24.60 Supplemental Benefit Rate per Hour: $18.89 Painter - Brush & Roller - Fourth Year Effective Period: 7/1/2015 - 10/31/2015 Wage Rate per Hour: $31.60 Supplemental Benefit Rate per Hour: $24.02 Effective Period: 11/1/2015 - 6/30/2016 Wage Rate per Hour: $32.80 Supplemental Benefit Rate per Hour: $24.27 (District Council of Painters) PAINTER - STRUCTURAL STEEL‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Painters - Structural Steel (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 40% of Journeyperson's rate Painters - Structural Steel (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 60% of Journeyperson's rate Painters - Structural Steel (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 80% of Journeyperson's rate (Local #806) PLASTERER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Plasterer - First Year: 1st Six Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 40% of Journeyperson's rate Supplemental Rate Per Hour: $15.76