DRAINAGE AND EROSION CONTROL Sample Clauses

DRAINAGE AND EROSION CONTROL. WORK TO BE DONE: Construct sedimentation and erosion control measures and appurtenances. The works are to be performed in accordance with the engineering drawings prepared by Xxxxx Xxxxxxxxx Engineering Ltd. bearing Town File No. SD-580. SPECIFICATIONS: All work is to be performed in accordance with the latest revised Town of Oakville Standard Drawings and Specifications as of the date of the agreement. Siltation Control $ 71,820.00 15% Contingency and Engineering $ 10,773.00 TOTAL OWNER’S ESTIMATED COST $ 82,593.00 SCHEDULE ‘H’ LANDSCAPING AND FENCING WORK TO BE DONE: All fencing, grading, sodding, seeding, planting and pathway works as shown on the plans prepared by Xxxxxxx Xxxxxxxx SPECIFICATIONS: All work is to be performed according to the latest Town of Oakville Standard Drawings and Specifications as of the date of the agreement. ESTIMATED TOTAL COST $ 2,049,397.50 LESS: Estimated Cost of Works to be done on behalf of the Town pursuant to Schedule “K” Village Square (.274 ha. @ $1,404,510.00/ha) $ 385,000.00 NHS Core Trails (380 m @ $664.67/m) $ 175,000.00 Xxxxxxx’x Creek Rehabilitation (.18 ha @ $353,353.00/ha) $ 490,000.00 TOTAL COST OF WORKS ON BEHALF OF TOWN $ $1,050,000.00 OWNER’S COST: Street Trees $ 378,900.00 Rear Lot Acoustic Fencing $ 74,850.00 Walkway Blocks 385 & 386 Landscaping $ 32,300.00 SWM Pond Landscaping $ 285,600.00 Sub Total $ 771,650.00 15% Contingency and Landscape Architect $ 115,747.50 TOTAL OWNER’S COST $ 887,397.50 NOTES: * Securities for Shannon’s Creek Trail east side will not be required as part of this phase of development. The Securities for Shannon’s Creek west side will not be reduced until the east side works are complete. SCHEDULE ‘I’ The owner will provide to the Town postponements of any outstanding encumbrances in favour of the Subdivision Agreement with the Town. The owner shall dedicate the following lands free of charge and with clear title (free and clear of encumbrances) and any necessary easements. A Certificate of Title shall be provided, in a form satisfactory to the Town, Region or other authority: NOTES: Words indicating proposed uses in this schedule are intended to be descriptive only and are not intended to limit the use of the land in the hands of the Town. All Block numbers refer to the latest draft “M” plan filed with the Town unless otherwise indicated.
AutoNDA by SimpleDocs
DRAINAGE AND EROSION CONTROL a. Cross-drainage devices should be installed to:
DRAINAGE AND EROSION CONTROL. If drainage pipes are located on a Lot, the owner of said Lot shall be responsible to keep such unclogged, free-flowing and in good condition. The owner's builder must sign an agreement to abide by the erosion control rule as set forth by the Indiana Department of Environmental Management and applicable county and local rules and ordinances. In particular, the rule requires that erosion control practices be used during development and construction that will minimize soil erosion and sediment-laden water from flowing from the building sites and it requires the streets to be kept free of transported soil from the building site. As required, the erosion control plan for the Subdivision has been submitted to the Xxxxxxx County Soil and Water Conservation District. One (1) part of the plan pertaining to individual l ots requires that prior to the start of construction, a rock driveway must be installed and entrance to the building site for all deliveries and workers should be over the driveway. To minimize sediment-laden water from being discharged into the streets and drainage ways, sand bags, straw xxxxx and silt fences shall be used on all individual building sites. No owner nor builder shall be permitted to disturb the vegetation on any adjoining building site for any reason, and shall be held fully responsible for any loss or damage resulting therefrom. In connection with the foregoing, by accepting transfer of ownership of a Lot, the owner recognizes that Developer has no responsibility for erosion control and indemnifies Developer from any loss or damage that Developer may suffer by reason of the breach by the owner of erosion control responsibilities as herein set forth and under applicable law.
DRAINAGE AND EROSION CONTROL. WORK TO BE DONE: Construct sedimentation and erosion control measures and appurtenances. The works are to be performed in accordance with the engineering drawings prepared by Xxxxxx Engineering + Management Limited, bearing Town File SD-548.2 Note: Works to be secured by inclusion into the Site Plan Agreement. SPECIFICATIONS: All work is to be performed in accordance with the latest revised Town of Oakville Standard Drawings and Specifications as of the date of the agreement. Siltation Control Fencing $ NIL 15% Contingency and Engineering $ NIL TOTAL OWNER’S ESTIMATED COST $ NIL SCHEDULE ‘H’ LANDSCAPING AND FENCING WORK TO BE DONE: All work is to be performed to the latest Town of Oakville Standard Drawings and Specifications as of the date of this agreement. ESTIMATED TOTAL COST $ 28,704.00 LESS: Estimated Cost of Works to be done on behalf of the Town pursuant to Schedule “K” NIL TOTAL COST OF WORKS TO BE DONE ON BEHALF OF TOWN $ NIL OWNER’S COST Acoustic Fence $ 24,960.00 15% Contingency $ 3,744.00 TOTAL OWNER’S COST $ 28,704.00 SCHEDULE ‘I’ Words indicating proposed uses in this schedule are intended to be descriptive only and are not intended to limit the use of the land in the hands of the Town. All Lot and Block numbers refer to the latest draft M-Plan filed with the Town unless otherwise indicated.
DRAINAGE AND EROSION CONTROL. WORK TO BE DONE: Construct siltation controls and drainage and erosion control works. The works are to be performed in accordance with the engineering drawings prepared by Stantec Consulting Limited bearing Town File SD564.
DRAINAGE AND EROSION CONTROL. A. Installed and maintain sediment trapping system.
DRAINAGE AND EROSION CONTROL. WORK TO BE DONE: Construct siltation controls and drainage and erosion control works. The works are to be performed in accordance with the engineering drawings prepared by Trafalgar Engineering Ltd., bearing Town File SD.575.0 SPECIFICATIONS: All work is to be performed in accordance with the latest revised Town of Oakville Standard Drawings and Specifications as of the date of the Agreement. ESTIMATED TOTAL COST FOR WORKS ON TOWN PROPERTY: Siltation controls $ 3,300.00 15% Contingency and Engineering $ 495.00 TOTAL ESTIMATED COST: $ 3,795.00 ESTIMATED TOTAL COST FOR INTERNAL WORKS: Siltation controls $ 25,400.00 15% Contingency and Engineering $ 3,810.00 TOTAL ESTIMATED COST: $ 29,210.00 SCHEDULE ‘H’ LANDSCAPING AND FENCING WORK TO BE DONE Construction of landscaping along Lakeshore Road right-of-way, tree planting at the rear of Lots 4 to 7, landscaping adjacent to the channel, and chainlink fence along Coronation Park, all per drawings prepared by Xxxxxx X. X’Xxxxx & Associates Ltd.
AutoNDA by SimpleDocs
DRAINAGE AND EROSION CONTROL. In designing and constructing the improvements on any lot, the owner shall provide for adequate drainage and erosion control. After construction, the owner shall properly maintain all drainage and erosion control facilities.
DRAINAGE AND EROSION CONTROL. The PDBT shall maintain drainage within and through the work areas. Earth dams will not be permitted in paved areas. Temporary dams of sandbags, asphaltic concrete or other acceptable material will be permitted when necessary to protect the Work, provided their use does not create a hazard or nuisance to the public. Such dams shall be removed from the site as soon as their use is no longer necessary.
DRAINAGE AND EROSION CONTROL. The Harvest Contractor will drain all snig tracks and major road access after harvest completion in accordance with Queensland’s Vegetation Management Xxx 0000, as amended, and Forest Practices Code. All associated costs of drainage will be borne by the Harvest Contractor.
Time is Money Join Law Insider Premium to draft better contracts faster.