Electrical Test definition

Electrical Test means a verification of the electrical functions of Products.
Electrical Test means a verification of the electrical functions of Products. [*] = CONFIDENTIAL Initials: Contractor_____Company_____ TREATMENT REQUESTED FCA: Shall mean Free Carrier as defined in Incoterms 2000 as published by the International Chamber of Commerce.
Electrical Test a verification of the electrical functions of Product. Engineering Change Procedure: Company’s documented and controlled procedure for making revisions to drawings, process procedures, test specifications and other official documents used to Manufacture Product. Equipment: any equipment used for a Product production line, including but not limited to manufacturing and Electrical Test equipment, whether solely owned by Company (Provided Equipment), Contractor, or jointly owned by Company and Contractor (Shared Equipment). RFM ____ FCA: Free Carrier as defined in Incoterms 2010 as published by the International Chamber of Commerce. Factory: Contractor’s manufacturing facility for Product located at either Taoyuan, Taiwan or Wuxi, China. Final Lot Acceptance Test: the series of electrical and physical performance tests and visual inspections performed by Company representatives as the last step in the manufacturing process to ensure compliance to Company Specifications and Product’s fitness for use or sale. Finished Goods: any Product that is 100% complete, inspected, tested, and either stored in Contractor’s warehouse facilities, or packed in a shipping container awaiting shipment. Finishing Materials: shipping tubes, reels, waffle packs, gel packs and similar items, labels, tickets and shipping cartons used to ship Finished Goods per Company Specifications Improvements: shall mean any invention, information, development, technology or modification, of any nature or form, and any part or combination of parts, or method of using or manufacturing such part or combination of parts, developed during the term of this Agreement by either Company or Contractor, which would improve a Product, including, without limitation, any development the use of which affects the Product in any of the following ways: – Reduces costs; – Improves performance; – Improves handling, yields or productivity in the manufacturing process; – Broadens applicability; – Increases marketability, or – Improves appearance. Indemnified Amounts: see paragraph 18.1 of this Agreement. Indirect Materials: any and all Materials which are used and consumed during the practice of Manufacture but which do not become, and are not identifiable, as a physical part of Product (e.g., solvents, adhesives, gloves, etching fluids, photoresist, etc.) Joint Intellectual Property: see paragraph 22.4 of this Agreement. Manufacture: the complete process of assembly and test of Product into Finished Goods, using one ...

Examples of Electrical Test in a sentence

  • Complete the Electrical Test Report included as Attachment No. 1.

  • In no event shall Electrical Test Instruments be liable for consequential or special damages, including but not limited to loss of use, loss of income, loss of profit or cost of replacement.

  • The foregoing is in lieu of all other warranties expressed or implied, and all other obligations or liabilities whether arising under contract, negligence or otherwise, on the part of Electrical Test Instruments.

  • Such corrective measures will be limited to repairing or replacing the unit, at Electrical Test Instruments' option.

  • This limited warranty does not cover reimbursements for transportation, removal, installation, repair or replacement, except as may otherwise be specifically agreed to in writing by Electrical Test Instruments.

  • Established the High-Speed Electrical Test Lab, the EMI/RFI Lab and Heat Transfer Lab.

  • Summary: Submit a summary of the Electrical Test Report and Motor Test Report, noting deviations from requirements listed below: 1.

  • Los Angeles City Electrical Test Lab Research Report is required to use an electro-mechanical lift to provide parking spaces.

  • Failures at Electrical Test will be subject to sample failure analysis on a monthly basis and may result in credits to Company for assembly related failures.

  • Submit Attachment No.1, Electrical Test Report to the Contracting Officer's Technical Representative.

Related to Electrical Test

  • Electrical work Concealed and fire resistant wiring of “ISI” Copper Wire, Distribution board with “MCB”. “ISI” mark modular electrical accessories, Landline phone conduit, Cable TV wiring conduit, Separate line for inverter connection, Air-conditioner power point. Painting : Long Lasting and weather resistant acrylic paint to all external walls, All internal walls with white cement based putty finish with OBD. Plumbing & Sanitation : Sanitary ware for toilets, plumbing fixtures, CPVC/UPVC pipe and fitting(ISI make), SWR drainage system. Kitchen: Granite platform, ceramic tiles dado upto 2’ height, Stainless Steel sink in Kitchen, Aquaguard point, Connection for washing machine in wash area.

  • Electrical Distance means, for a Generation Capacity Resource geographically located outside the metered boundaries of the PJM Region, the measure of distance, based on impedance and in accordance with the PJM Manuals, from the Generation Capacity Resource to the PJM Region.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • Fit test means the use of a protocol to qualitatively or quantitatively evaluate the fit of a respirator on an individual.

  • Electrical cleaner means a product labeled to remove heavy soils such as grease, grime, or oil from electrical equipment, including, but not limited to, electric motors, armatures, relays, electric panels, or generators. Electrical Cleaner does not include “General Purpose Cleaner,” “General Purpose Degreaser,” “Dusting Aid,” “Electronic Cleaner,” “Energized Electrical Cleaner,” “Pressurized Gas Duster,” “Engine Degreaser,” “Anti-Static Product,” or products designed to clean the casings or housings of electrical equipment.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Electrical equipment means underground equipment that contains dielectric fluid that is necessary for the operation of equipment such as transformers and buried electrical cable.

  • Subproject means a specific water and/or sanitation Subproject financed or to be financed by a Subproject Grant (as hereinafter defined) provided from the proceeds of the Credit under Part C.1 of the Project;

  • Subprojects means more than one such Subproject.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Building system means plans, specifications and documentation for a system of manufactured factory-built structures or buildings or for a type or a system of building components, including but not limited to: structural, electrical, mechanical, fire protection, or plumbing systems, and including such variations thereof as are specifically permitted by regulation, and which variations are submitted as part of the building system or amendment thereof.

  • HVAC System is defined in Section 6.10(a)(v).

  • Finished water means the water that is introduced into the distribution system of a public water system and is intended for distribution and consumption without further treatment, except as treatment necessary to maintain water quality in the distribution system (e.g., booster disinfection, addition of corrosion control chemicals).

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Structural component means a component that supports non-variable forces or weights (dead loads) and variable forces or weights (live loads).

  • Potable water means water that is fit for human consumption;

  • Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.

  • PRINCIPAL TEST The CONTRACTOR rather than COUNTY has the right to control the manner and means of accomplishing the result contracted for.

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Building sewer means the extension from the building drain to the public sewer or other place of disposal.

  • Base Building Work means the base building work for the Building as described in this Manual.

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • Electrical contractor means an electrical contractor as defined in the Regulations;

  • Water Surface Elevation (WSE means the height, in relation to mean sea level, of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.

  • Drainage area means a geographic area within which stormwater, sediments, or dissolved materials drain to a particular receiving waterbody or to a particular point along a receiving waterbody.