Lithium Recovery System Sample Clauses

Lithium Recovery System. The goals of this subtask are to design and engineer the brine pretreatment, lithium recovery system, procure all necessary parts, equipment, and construction contracts; install the proposed integrated system. The Recipient shall: • Identify final system / design parameters, including minimum operating temperature, chemicals requirements, production rate of co-products, and other design parameters relevant to the lithium recovery system, including brine pretreatment. • Design and engineer the proposed brine pretreatment and lithium recovery system, providing for its full integration into the overall facility. • Prepare and provide a Notification of Completion of Detailed Engineering Letter. This letter shall include, but is not limited to: o Engineering Summary Documents o Summary of lessons learned in the design phase • Prepare the System Procurement Plan that will detail the process for procurement of equipment, materials, and services. The System Procurement Plan will include, but is not limited to: o Description of the work and bid packages o Methodology for receiving and evaluating the bid proposals • Execute the System Procurement Plan. • Prepare and provide a System Procurement Report. • Prepare and provide a System Execution Plan for the lithium recovery system that will outline the budget and schedule for the completion of all construction and installation activities. The System Execution Plan will include, but is not limited to: o List of milestones relevant to the fabrication process x Xxxxx chart and detailed project schedule o Risk mitigation strategy o Quality control and quality assurance plan • Implement the System Execution Plan. • Prepare and provide to the CAM a System Execution Report for the facility that will evaluate the actual construction activities compared to the System Execution Plan. The System Execution Report will include, but is not limited to: o Final schedule of completed milestones o Description of lessons learned o Summary of any major component changes or other updates that do not conflict with the scope of the proposed work • Prepare and provide Written Notification of Completion and of Installation for the entire system that will notify the CAM that the construction and installation activities have been completed. Products: • Notification of Completion of Detailed Engineering Letter • System Procurement Plan (draft and final) • System Procurement Report • System Execution Plan (draft and final) • System Execution Repo...
AutoNDA by SimpleDocs

Related to Lithium Recovery System

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

  • Secondary Systems The Developer and Connecting Transmission Owner shall each cooperate with the other in the inspection, maintenance, and testing of control or power circuits that operate below 600 volts, AC or DC, including, but not limited to, any hardware, control or protective devices, cables, conductors, electric raceways, secondary equipment panels, transducers, batteries, chargers, and voltage and current transformers that directly affect the operation of Developer or Connecting Transmission Owner’s facilities and equipment which may reasonably be expected to impact the other Party. The Developer and Connecting Transmission Owner shall each provide advance notice to the other Party, and to NYISO, before undertaking any work on such circuits, especially on electrical circuits involving circuit breaker trip and close contacts, current transformers, or potential transformers.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Disaster Recovery Plan Contractor agrees that upon request of System Agency, Contractor shall provide copies of its most recent business continuity and disaster recovery plans.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”).

  • Quality Control Program The Contractor shall describe the Quality Control Program in a written document which shall be reviewed by the Engineer prior to the start of any production, construction, or off-site fabrication. The written Quality Control Program shall be submitted to the Engineer for review at least ten (10) calendar days before the start of construction. The Quality Control Program shall be organized to address, as a minimum, the following items:

  • Disaster Recovery PFPC shall enter into and shall maintain in effect with appropriate parties one or more agreements making reasonable provisions for emergency use of electronic data processing equipment to the extent appropriate equipment is available. In the event of equipment failures, PFPC shall, at no additional expense to the Fund, take reasonable steps to minimize service interruptions. PFPC shall have no liability with respect to the loss of data or service interruptions caused by equipment failure, provided such loss or interruption is not caused by PFPC's own willful misfeasance, bad faith, gross negligence or reckless disregard of its duties or obligations under this Agreement.

  • Master Contract Sales Reporting System Contractor shall report quarterly Master Contract sales in Enterprise Services’ Master Contract Sales Reporting System. Enterprise Services will provide Contractor with a login password and a vendor number. The password and vendor number will be provided to the Sales Reporting Representative(s) listed on Contractor’s Bidder Profile.

  • Unbundled Sub-Loop Concentration System (USLC 2.9.1 Where facilities permit and where necessary to comply with an effective Commission order, BellSouth will provide <<customer_name>> with the ability to concentrate its sub-loops onto multiple DS1s back to the BellSouth Central Office. The DS1s will then be terminated into <<customer_name>>’s collocation space. TR-008 and TR303 interface standards are available.

  • Random Drug Testing All employees covered by this Agreement shall be subject to random drug testing in accordance with Appendix D.

Time is Money Join Law Insider Premium to draft better contracts faster.